Hindustan Construction Co. Ltd. · NSE:HCC

Hindustan Construction — Q1 FY26 Earnings Presentation

15 slides from Hindustan Construction's earnings presentation, Aug 7, 2025

  1. Slide 1: Exchange filing cover letter for analyst meeting presentation

    HCC/SEC/AM/2025 August 7, 2025 BSE Limited National Stock Exchange of India Ltd. The Corporate Relationship Dept, Exchange Plaza, Phiroze Jeej eebhoy T owe rs, Bandra-Kurla Complex, Dalal Street, Sandra (East), Mumbai-400 001 Mumbai-400 051 Scrip Code : 500185 Symbol: HCC Dear Sir I Madam, Sub : Ana

  2. Slide 2: Investor/Analyst Presentation Q1 FY26

    Hindustan Construction Co Ltd Investor/Analyst Presentation Q1 FY26 1 August 7, 2025 Analyst Presentation – Q1 FY26 Results

  3. Slide 3: Nation building since 1926

    H 1:1:: Nation building since 1926 60°/o of India's installed 26% of India's installed nuclear power hydro power capacity capacity 2 August 7, 2025 Analyst Presentation – Q1 FY26 Results

  4. Slide 4: Diversified & robust orderbook

    Diversified & robust orderbook Order Backlog: ₹11,188 Cr Order Book Position (Business Line Wise %) Order Book Position (Geographical) Uttarakahand J&K Maharashtra Transport Hydro Nuclear & Buildings Water Gujarat Manipur Tamilnadu Karnataka Madhya Pradesh Rajasthan Bhutan Delhi Assam Others 3 Augus

  5. Slide 5: Key performance highlights: Q1FY26

    Key performance highlights: Q1FY26 • Standalone Turnover of ₹1069 Cr in Q1 FY26 versus ₹1,265.7 Cr in Q1 FY25 • Standalone Net Profit of ₹38.6 Cr in Q1 FY26 versus ₹22.8 Cr in Q1 FY25 • Standalone EBITDA margins at 14.9% in Q1 FY26 compared to 12.6% in Q1 FY25 • Received ₹250 Cr through settlement o

  6. Slide 6: Anji Khad Cable Stay Bridge

    Anji Khad Cable Stay Bridge • Tallest Cable Stay Bridge inaugurated by Honourable Prime Minister Shri Narendra Modi on June 6, 2025 • India’s first cable stayed railway bridge • 193-metre-high pylon is tallest in the country 5 August 7, 2025 Analyst Presentation – Q1 FY26 Results

  7. Slide 7: Tehri PSP (4x250 MW)

    Tehri PSP (4x250 MW) Powerhouse Overview Unit - 5 COD Powerhouse false ceiling, Drainage Gallery Lining and finishing works are in Progress. 6 August 7, 2025 Analyst Presentation – Q1 FY26 Results

  8. Slide 8: Vishnugad Pipalkoti HEP (4x111MW)

    H 1:1:: Vishnugad Pipalkoti HEP (4x111MW) HRT by TBM: TBM mining 6.5 KM of Tunneling completed out of 12.1 KM by TBM. 7 August 7, 2025 Analyst Presentation – Q1 FY26 Results

  9. Slide 9: Parwan Dam

    H 1:1:: Parwan Dam 8 August 7, 2025 Analyst Presentation – Q1 FY26 Results

  10. Slide 10: Mumbai Metro Line 3

    H 1:1:: Mumbai Metro Line 3 9 August 7, 2025 Analyst Presentation – Q1 FY26 Results

  11. Slide 11: Mumbai Coastal Road

    H 1:1:: Mumbai Coastal Road 10 August 7, 2025 Analyst Presentation – Q1 FY26 Results

  12. Slide 12: Standalone Financials: Q1 FY26

    Standalone Financials: Q1 FY26 Results are in accordance with the Indian Accounting Standards (Ind AS) notified by the Ministry of Corporate Affairs Q1 FY26 Q1 FY25 y-o-y Q4 FY25 Particular ₹ Cr ₹ Cr % ₹ Cr Income from Operations 1,069.0 1,265.7 -15.5% 1,330.2 Other Income 20.7 20.7 -0.3% 28.1 Total

  13. Slide 13: Consolidated Financials: Q1 FY26

    Consolidated Financials: Q1 FY26 Results are in accordance with the Indian Accounting Standards (Ind AS) notified by the Ministry of Corporate Affairs Q1 FY26 Q1 FY25 y-o-y Q4 FY25 Particular ₹ Cr ₹ Cr % ₹ Cr Income from Operations 1,091.3 1,816.0 -39.9% 1,373.7 Other Income 27.3 19.8 38.2% 18.5 Tot

  14. Slide 14: HCC

    HCC 13 August 7, 2025 Analyst Presentation – Q1 FY26 Results

  15. Slide 15: Disclaimer

    Disclaimer This presentation contains certain forward looking statements concerning future business prospects and profitability of HCC, which are subject to a number of risks and uncertainties and actual results could materially differ from those in such forward looking statements, important develop

Hindustan Construction Company — Q1 FY26 Earnings Presentation on 6ix