Hillgrove Resources Limited · ASX:HGO

Hillgrove Resources — Conference Presentation (February 2019)

16 slides from Hillgrove Resources's conference presentation, Feb 26, 2019

  1. Slide 1: Pumped Hydro Energy Storage - Kanmantoo Project

    PUMPED HYDRO ENERGY STORAGE - KANMANTOO PROJECT STEVE MCCLARE IIIII CEO & MD 26 FEBRUARY 2019

  2. Slide 2: Disclaimer Statement

    DISCLAIMER STATEMENT No representation or warranty is or will be made by any person (including Hillgrove Resources Limited ACN 004 297 116 (“Hillgrove”, “HGO”, or the “Company”) and its officers, directors, employees, advisers and agents) in relation to the accuracy or completeness of all or part of

  3. Slide 3: PHES Is Not Core Business

    55 kilometres from Adelaide CBD PHES IS NOT CORE BUSINESS 3

  4. Slide 4: Hillgrove is a copper/gold producer in South Australia

    Hillgrove Resources is a copper / gold producer with production and exploration assets in South Australia. The intent remains to maximise the value from the existing mining operation (including progressive rehabilitation), progress the sale of the Pumped Hydro site and evaluate options to unlock the

  5. Slide 5: Kanmantoo PHES

    KANMANTOO PHES ◼ At last years conference we stated Kanmantoo was one of the best sites for PHES in Australia: ❑ Very low capital cost at < $1M / MW ❑ Fast to market; ❑ Infrastructure already in place ❑ Proximity to grid ❑ Existing studies and knowledge (environmental, geotechnical, geology, hydroge

  6. Slide 6: Independent Verification

    INDEPENDENT VERIFICATION GHD were engaged to independently verify HGO statements, study confirmed: – Very low capital cost at $1M / MW. • Lower pond (open pit) already constructed. • Upper pond in a natural valley. • All options are less than 1.5km between ponds. • High head in stable geological con

  7. Slide 7: Formal Sale Process

    FORMAL SALE PROCESS ◼ Key Pacific Advisory Partners appointed to conduct sale process. ◼ Indicative bid stage generated broad interest. ◼ Shortlist developed after binding bid phase. ◼ Negotiations with preferred bidder are progressing but are incomplete. 7

  8. Slide 8: General Layout

    | HILLGROVE KANMANTOO PHES RESOURCES GENERAL LAYOUT Upper Pond < Shaft & . OfGP/H & ‘% th / Lower “ep * Pond | 7 apa Processing Plant . : e 1) ae 4Xc : S Y ®. es “ = as | S es A, wo” ye ®.

  9. Slide 9: Current Status of Lower Pond

    CURRENT STATUS OF LOWER POND ◼ Mining of the lower pond is imminent. 9

  10. Slide 10: Cross Section

    | HILLGROVE KANMANTOO PHES » RESOURCES CROSS SECTION con y INLET STRUCTURE WITH INTEGRAL EMERGENCY SPILLWAY | SET IN CONCRETE FACED ROCKFILL DAM | CREST RL1225 | @5m STEEL PIPELINE IN CUT TRENCH caine | | TRANSITION TO TUNNEL TO SUIT ROCK | | CONDITION AND COVER EXISTING GROUND MOL RL1216 | _> EXIST

  11. Slide 11: Key Points of Difference

    KEY POINTS OF DIFFERENCE Mining has resulted in a significant data source: ◼ Geological and geotechnical ◼ Hydrology ◼ Environmental UPPER ◼ Community POND ◼ Network Proximity 11

  12. Slide 12: Capital Cost

    HILLGROVE KANMANTOO PHES tv | RESOURCES CAPITAL COST an Comparative Capex (ASm) for PHES projects 2.50 0.50 0.45 2.00 0.40 = 0.35 s % & 1.50 0.30 5 c + =) a 0.25 = = = = 1.00 0.20 = uw a o15 < 0.50 0.10 0.05 0.00 0.00 Kanmantoo _ Kidston, QLD Baroota Highbury Goat Hill Middleback Cultana Ranges Mmmm

  13. Slide 13: From Open Pit Mining to PHES

    FROM OPEN PIT MINING TO PHES ▪ 250MW for 7.5 hours generating over 1,800MWh ▪ < 5km to 275KVA line UPPER POND LOWER POND 13

  14. Slide 14: Interaction with Pumped Hydro

    INTERACTION WITH PUMPED HYDRO Dawsley Assuming the PHES proceeds, the indicative area in yellow will not be available for mining, which includes the Kavanagh underground. PHES The Nugent, Dawsley, Stella and Kanmantoo South targets remain accessible as exploration targets regardless of PHES developm

  15. Slide 15: Why Kanmantoo Works for PHES

    WHY KANMANTOO WORKS FOR PHES 15

  16. Slide 16: Personal Observations

    PERSONAL OBSERVATIONS Whilst governments can steer or even mandate direction, the majority of the PHES market is driven by commercially attractive projects. Synchronous generators are often the best partners of PHES. The Australian environment has many hills, mining creates artificial mountain gradi