  1. Slide 1: Q4 2024 Results

    Q4 2024 (Apr 5th, 2024 @ 13:47): PN: New image Results 31 January 2025

  2. Slide 2: Disclaimer

    Disclaimer All statements in this presentation other than statements of historical fact are forward-looking statements, which are subject to a number of risks, uncertainties, and assumptions that are difficult to predict and are based upon assumptions as to future events that may not prove accurate.

  3. Slide 3: Key events Q4 2024

    Key events Q4 2024 Operations and HSSE  Good operating and safety performance on all vessels  57% fleet utilisation. Four out of seven vessels with 100% utilisation in the quarter  Safe Zephyrus extension to Q3 2027 finalised  Year-end backlog of USD 370 million, +44% YoY increase Financials  Q

  4. Slide 4: Zephyrus extension finalised, increased visibility into 2027

    Zephyrus extension finalised, increased visibility into 2027 Vessel 2024 2025 2026 2027 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Safe Zephyrus Petrobras (Brazil) Petrobras (Brazil) Safe Eurus Petrobras (Brazil) Safe Notos Petrobras (Brazil) Petrobras (Brazil) Safe Concordia US Gulf of Mexico

  5. Slide 5: Market

    Market 5

  6. Slide 6: Brazil employing ~50% of global fleet and growing

    Brazil employing ~50% of global fleet and growing Norway: 3 vessels UK: 2 vessels Safe Caledonia - Ithaca USA: 1 vessel Safe Concordia - Undisclosed Guyana: 1 vessel Australia: 2 vessels Brazil: 11 vessels Safe Boreas – Undisclosed Safe Zephyrus - Petrobras Africa: 2 vessels Safe Notos - Petrobras S

  7. Slide 7: Strong Brazil demand confirmed

    Strong Brazil demand confirmed Brazil activity (FPSO unit growth)  Recurring demand from FPSO market continues to drive Maintenance & Safety Unit (UMS) demand with 25-50% Forecast growth by 2030 from Petrobras and others Existing On-order Potential Total +26 91  Recent tender finalised and Zephyru

  8. Slide 8: New Brazil tenders will absorb further high-end capacity

    New Brazil tenders will absorb further high-end capacity High-end accommodation units in short supply in Brazil  Petrobras tender for up to five UMS Firm Petrobras Firm Other Operator Forecast Petrobras Forecast Other Operator ‒ 4-year durations with start-up in 2026 18 ‒ Requirement for high-end u

  9. Slide 9: Operations

    Operations 9

  10. Slide 10: Stable operations

    Stable operations Caledonia Scandinavia Boreas  Safe operations with no recordable injuries  100% utilisation on all three vessels working for Petrobras in Brazil Concordia  100% utilisation for Safe Concordia Zephyrus ‒ On contract in US Gulf of Mexico to early March ‒ Monitoring market opportun

  11. Slide 11: Backlog increased and extended into 2027

    Backlog increased and Order backlog (USD million) 400 370 extended into 2027 257 220 323 37 105 35 36 19 100 7 7 334  Backlog of USD 3701) million including 238 260 213 options per Q4 2024 179  44% increase from end-2023 Q4'23 Q1'24 Q2'24 Q3'24 Q4'24 ‒ Awards for Safe Caledonia and Safe Boreas Bac

  12. Slide 12: Financials

    Financials 12

  13. Slide 13: Refinancing process ongoing

    Refinancing process ongoing Indicative refinancing need in 2025 (USD million)  Discussions ongoing between company and lenders 450  Indicative refinancing requirement of ~70 ~40 ~400 ~USD 400 million including USD 343 million in debt 400 maturities and additional liquidity to support rig re- (47)

  14. Slide 14: Operating revenues

    Operating revenues Operating revenues and EBITDA (USD million)  YoY improved operating revenue reflects four operating vessels for the full quarter compared 45 to three in part of Q4 2023 35 1 2 1 1  Charter income of USD 34.6 million and other 1 33 33 34 35 income of USD 2.4 million 25 29 ‒ Chart

  15. Slide 15: Income statement

    Income statement  EBITDA (Operating result before (Unaudited figures in USD million) Q4 24 Q4 23 12M 24 12M 23 depreciation) increase vs Q4 2023 largely Operating revenues 37.0 29.6 139.8 97.7 due to increased utilisation, contract fee Operating expenses (32.1) (32.3) (116.0) (108.2) and phasing of

  16. Slide 16: Balance sheet

    Balance sheet (Unaudited figures in USD million) Vessels 12M 24 364.9 12M 23 383.7 Other non-current assets 4.3 1.8 Total non-current assets 369.2 385.5 Other current assets 35.1 32.6 Cash and deposits 46.8 74.6  Total assets of USD 451.1 million Total current assets 81.9 107.2  Cash position of U

  17. Slide 17: Cash flow

    Cash flow Cash flow in the quarter (USD million)  EBITDA USD 5.0 million  Working capital change due to Safe Boreas 64 and Safe Caledonia SPS/reactivation 5 (4) 0  Capex of USD 8 million (8) 47  Interest and refinancing cost of USD 8 (8) (2) million  Cash position of USD 46.8 million1 Cash EBIT

  18. Slide 18: Summary and outlook

    Summary and outlook 18

  19. Slide 19: Summary

    Summary Market leader with Positioned for long-term significant share of capacity value creation driven by in a tightening market and Brazil demand access to newbuilds with attractive lead time Focus on achieving Improved earnings potential, sustainable capital favourable replacement in H1 2025 valu

  20. Slide 20: Appendix

    Appendix 20

  21. Slide 21: Interim condensed consolidated statement of cash flows

    Interim condensed consolidated statement of cash flows (Unaudited figures in USD million) Q4 24 Q4 23 12M 24 12M 23 Loss before taxes (11.2) (21.2) (39.6) (73.2) Depreciation 9.0 9.9 33.0 31.1 Financial income (1.0) (0.5) (2.3) (2.1) Financial costs 7.4 8.0 31.1 30.9 Share-based payment expense 0.3

  22. Slide 22: Interim condensed consolidated statement of comprehensive income

    Interim condensed consolidated statement of comprehensive income (Unaudited figures in USD million) Q4 24 Q4 23 12M 24 12M 23 Net loss for the period (11.0) (14.7) (41.8) (67.8) Foreign currency translation (1.5) 0.6 (1.2) 1.3 Pension remeasurement (0.1) (0.1) (0.1) (0.1) Other comprehensive income

  23. Slide 23: Interim condensed consolidated statement of changes in equity

    Interim condensed consolidated statement of changes in equity (Unaudited figures in USD million) Q4 24 Q4 23 12M 24 12M 23 Equity at beginning of period 4.0 13.1 33.8 37.3 Revised equity at beginning of period 4.0 13.1 33.8 37.3 Share based payment 0.3 0.3 1.0 0.4 New share issue 0.0 34.6 0.0 62.7 C

  24. Slide 24: Vessel update - Brazil

    Vessel update - Brazil Safe Eurus Safe Notos Safe Zephyrus DP3 – Worldwide1 DP3 – Worldwide1 DP3 - Worldwide  Contracted to Petrobras until Q1 2027  Contracted to Petrobras until Q3 2026  Contracted to Petrobras until September 2027  98% utilisation in 2024  100% utilisation in 2024  99% utili

  25. Slide 25: Vessel update – North Sea and rest of world

    Vessel update – North Sea and rest of world Safe Boreas Safe Caledonia Safe Concordia Safe Scandinavia DP3 - Worldwide TAMS - UK North Sea DP2 – Worldwide2 TSV/accommodation - UK / NCS  Contract signed for operations in  Contract signed for UK. Start-up June  Firm contract extended to early  Ten

  26. Slide 26: Analytical information

    Analytical information Expenditure information Indicative opex/day by region Item 2025 Comment Region 2025 Opex Estimated Estimated (USDm) (USDk/day) SG&A1 ~20-21 SG&A increase driven by increased activity and inflation UK (Moored – Caledonia) ~30k Depreciation ~35-37 Straight line depreciation Braz

  27. Slide 27: Outstanding debt

    Outstanding debt Three Tranches of Debt 2 Main Tranches COSCO Sellers Credit Debt maturity profile Outstanding debt $343m (two tranches 250m & 93m Notos) $78.5m Pledged vessels Boreas, Zephyrus, Caledonia, Concordia, Eurus Scandinavia, Notos (only 93m tranche) COSCO Interest rate SOFR + Credit Adjus

  28. Slide 28: Two newbuilds available at yard

    Two newbuilds available at yard  Only two DP3 newbuild semis available at yard ‒ 500 POB and suited for Brazil requirements ‒ Ongoing dialogue with the yard on how to facilitate delivery in expected future Petrobras tenders ‒ Long-term contracts required to justify delivery Existing delivery terms

  29. Slide 29: Tax

    Tax  Prosafe SE is a permanent tax resident in Norway and its Norwegian tax resident subsidiaries have a base for deferred tax assets of approximately USD 1.7 billion as at end 2023. The deferred tax assets are currently not recognized in the financial statements. In Q4 2023, the Norwegian tax auth

  30. Slide 30: We are headquartered in Norway and have offices in the UK, Brazil and Singapore

    We are headquartered in Norway and have offices in the UK, Brazil and Singapore prosafe.com

Prosafe — Q4 2024 Earnings Presentation on 6ix