Slide 1: Annual General Meeting
For personal use only Andromeda Annual General Meeting 19 November 2026 ASX:ADN andromet.com.au Level 10, 431 King William Street, Adelaide, South Australia 5000 +61 8 7089 9800 Authorised for release by the Board of Directors of Andromeda Metals Ltd
Slide 2: Disclaimers and Important Information
Disclaimers and Important Information This presentation contains summary information about Andromeda, and its activities, current only at the date of this No warranty presentation. This presentation is for information purposes only. The information in the presentation is of a general nature only Whi
Slide 3: Acknowledgement of Country
Acknowledgement of Country For personal use only Andromeda recognises the Kaurna people of the Adelaide Plains and the Wirangu people of South Australia’s Eyre Peninsula as the Traditional Owners and Custodians of the lands on which we operate. We pay our respect to Elders past and present, and reco
Slide 4: Acting CEO's Presentation
For personal use only Acting CEO’s Presentation Sarah Clarke, Acting CEO
Slide 5: Australia's Next Leading Industrial & Critical Minerals Company
Australia’s Next Leading Industrial & Critical Minerals Company For personal use only Andromeda is advancing two high-value projects, leveraging its high-quality kaolin resource Development ready industrial minerals platform with pathway into critical minerals 1 The Great White Project: development
Slide 6: Great White Project Highlights
Great White Project Highlights De-risked, high-grade asset For personal use only • The Great White Project (GWP): High-grade kaolin asset delivering premium products over a 28-year mine life • Strong economics: $763 million post-tax NPV8; 43% IRR; $140M average annual EBITDA Tier 1 Project • Favoura
Slide 7: Great White Project Early Works Complete
Great White Project Early Works Complete A De-Risked, Development-Ready Project For personal use only STATUS OF PLANNED ACTIVITIES WHAT THIS DE-RISKS • Great White site established and construction schedule de- $3.79 million rehabilitation bond lodged with DEM plus A$670,000 risked3 Environmental co
Slide 8: Great White Project is Construction Ready
Great White Project is Construction Ready Early Works – Site prepared & key long lead items stored in Australia For personal use only ✓ Freehold land purchased ✓ Processing Plant Pad prepared ahead of construction ✓ Fluid bed dryer ✓ Grade control drilling ✓ Stage 1A Filter press ✓ Early Works excav
Slide 9: High-quality kaolin products for premium ceramics
High-quality kaolin products for premium ceramics For personal use only IDEAL FOR WHITE AND SUPER- IDEAL FOR PORCELAIN SLABS IDEAL FOR PREMIUM Premium Quality Positioning in the Global Kaolin Market WHITE PORCELAIN TILES AND TABLEWARE CERAMIC BODIES GREAT WHITE CRM T GREAT WHITE CRM P GREAT WHITE KC
Slide 10: GWP Stage 1A+ supported by Binding Offtakes
GWP Stage 1A+ supported by Binding Offtakes 100% of planned production committed under binding offtake contracts by Year 3 For personal use only Binding Offtake Agreements support Stage 1A+ Overview of Offtakers production capacity5 Wet metric tonnes per annum Ongoing contracted volumes>> Offtaker M
Slide 11: HPA Project Highlights
HPA Project Highlights Unlocking Critical Minerals from a High-quality Kaolin Resource For personal use only • Proprietary process: Over 8 years of R&D research to develop flexible, scalable flowsheet Patented • Lab-scale testwork: Successful lab-scale testwork validated production of HPA to 99.9985
Slide 12: What differentiates Andromeda's patented process
HPA Project What differentiates Andromeda’s patented process For personal use only Kaolin-based production with low cost and low carbon2 Conventional Aluminium Alkoxide Andromeda's kaolin-based Process process Aluminium metal feedstock ✕ ✓ No aluminium metal inputs Refined from aluminium metal throu
Slide 13: 4N HPA Achieved at Pilot Scale
4N HPA Achieved at Pilot Scale For personal use only Independent analysis confirms 4N+ HPA purity produced from Great White kaolin 99.9989%1 4N+ achieved Co-products Above the 99.99% Al2O3 threshold Measured HPA purity Amorphous silica under assessment Purity confirmed above the 4N threshold Indepen
Slide 14: Next Generation HPA applications
Next Generation HPA applications For personal use only HPA is used in next generation applications, including data centres powering AI, aerospace and defence1 Semi-conductors powering AI Aerospace Defence Synthetic Sapphire for Armoured Vehicles and Defence Aerospace and Optical and Semi-conductors
Slide 15: Advancing Andromeda's HPA Commercialisation Pathway
Advancing Andromeda’s HPA Commercialisation Pathway For personal use only STRATEGIC MILESTONE Non Binding Heads of Agreement signed with Traxys North America1 5-year 2,000 tpa ~US$40M 2 US market Potential sales agency of HPA targeted under the Indicative annual Supporting US Critical Mineral agreem
Slide 16: HPA Scoping Study Results
HPA Scoping Study Results Potential to become a leading global producer of low-cost, low-carbon HPA For personal use only AUD USD Market-Leading Economics7,8 Target Production (annual) 10,000 tpa 9 NPV10 (pre-tax) $1,480 million US$947 million NPV10 (post-tax)1 $1,010 million US$647 million IRR2 88%
Slide 17: Investment Highlights
Investment Highlights Dual-sector positioning across industrial and critical minerals For personal use only De-risked and construction-ready: Early Works complete — access road, The Great White Project bulk earthworks, grade control and geotechnical drilling completed, and key long-lead equipment fa
Slide 18: Dr Stephen Grocott, Incoming Non-Executive Director
For personal use only Dr Stephen Grocott Incoming Non-Executive Director
Slide 19: Dr Stephen Grocott
Dr Stephen Grocott Incoming Non-Executive Director For personal use only Dr Grocott brings 45 years’ experience across JUNIOR COMPANIES mineral processing, technology Queensland Pacific Metals (and QPM Energy) development, commissioning, operations Managing Director and Non-Executive Director techni
Slide 20: Dr Stephen Grocott
Dr Stephen Grocott Mineral processing expertise to support progressing HPA commercialisation For personal use only Dr Stephen Grocott brings experience relevant to the continued technical development and potential commercialisation of Andromeda’s HPA process: ▪ Minerals processing and hydrometallurg
Slide 21: Andromeda – at the intersection of market and technology
Andromeda – at the intersection of market and technology For personal use only HPA Market Drivers Strong Projected Demand Growth ▪ Global 4N+ HPA demand forecast to grow at 20.1% CAGR 1 Emerging Supply-Demand Gap ▪ 4N+ HPA supply shortfall expected in 2028, growing to 127% of estimated production1.
Slide 22: High Purity Alumina (HPA)
High Purity Alumina (HPA) For personal use only Andromeda – at the intersection of market and technology High Growth End-Use Markets1 Commercialisation program targeting attributes most required by customers: Light-emitting diodes (LEDs) Lithium-ion battery (LIB) separators Purity ▪ High purity ( 9
Slide 23: Andromeda technology
Andromeda technology For personal use only Competitive advantages relative to other technologies (both in production and in development) ▪ Lower cost, domestic feed material • Uses Great White kaolin, not aluminium metal at USD3,000/t (USD$1.50/kg HPA) • Low cost, recycled reagents ▪ Reduced scale-u
Slide 24: Annual General Meeting
For personal use only Andromeda Annual General Meeting 19 November 2026 For more information about the Company, please visit our website, www.andromet.com.au or contact: Investor Relations 1800 161 380 (within Australia) +61 8 7089 9819 (from outside Australia) ir@andromet.com.au ASX:ADN | andromet.