Patagonia Gold Corp · TSXV:PGDC
Patagonia Gold — Shareholder Meeting (June 2015)
15 slides from Patagonia Gold's shareholder meeting presentation, June 2015
Slide 1: AGM London June 2015
PATAGONIA GOLD PLC AGM LONDON June 2015 AIM:PG var PATAGONIA GOLD PLC AIM:PGD
Slide 2: Important Notice
IMPORTANT NOTICE The information contained in these slides has been prepared by Patagonia Gold plc ("the Company"). The information in these slides is subject to updating, completion, revision, further verification and amendment without notice. These slides have not been approved by the United Kingd
Slide 3: Patagonia Gold Plc
Patagonia Gold Plc Patagonia Gold Plc is a Producing Mining and Exploration company with its primary objective to increase shareholder value through the acquisition, exploration and development of gold and silver projects in the Deseado Massif region of Argentina 3
Slide 4: Properties in the Deseado Massif
Properties in the Deseado Massif 4
Slide 5: Production at Lomada de Leiva
Production at Lomada de Leiva 5
Slide 6: Lomada de Leiva Project Full production Achieved
Lomada de Leiva Project Full production Achieved A total of 29,347 ounces produced in 2014, 29,868 sold at $1251/Oz Cashflow reached $US 34.87M All profit back into exploration and development of other assets Op costs averaged $775/oz for second half 2014 Remaining LOM 18 months plus 1 full year of
Slide 7: Advanced Projects
Advanced Projects CAP-OESTE Crushing and Agglomeration circuit 7
Slide 8: Cap-Oeste-COSE Development Current Status Future Options
Cap-Oeste-COSE Development Current Status Future Options Oxide only HL economics although Currently evaluating construction positive not sufficiently good to of lower tonnage high grade plant construct to improve recovery of Au+Ag Requires additional reserves of Optimising COSE style approximately 2
Slide 9: Cap-Oeste-COSE Project
Cap-Oeste-COSE Project High Grade Solution small tonnage HG underground COSE Style Shoots COSE UG 9
Slide 10: Exploration + Opportunities
Exploration + Opportunities CAP-OESTE 10
Slide 11: El Tranquilo mineralisation
El Tranquilo mineralisation 2Moz delineated within a very small portion of the 80K hectare block Structural corridor huge potential Focus on High Grade fault hosted mineralisation 11
Slide 12: El Tranquilo IP key to success
El Tranquilo IP key to success Priority #1 find HG COSE style mineralisation with new 3D Pole-Dipole study Area between Cap-Oeste and COSE not fully tested, COSE bodies small All Min from same source 12
Slide 13: Looking undercover
Looking undercover 2387000 2388000 LEGEND (ae) IP Resistivity anomaly >110 ohm m >) Multi-element soil geochemical anomaly Post mineralisation cover. Largely untested Mapped fault _ Fault inferred from ground magnetics g | | Tenement boundary 0 (meters) Inoneuepe / Argentina vas PATAGONIA GOLD PLC A
Slide 14: Opportunities
Opportunities Extend LOM of Lomada by identifying and testing new structures Assess lower tonnage high grade project at Cap-Oeste / COSE Focus exploration on large tenement package of 355,240 has. Open to any sensible shareholder value enhancing opportunities Consolidate existing tenement holdings i
Slide 15: Management & Board Summary
Management & Board Summary Management Christopher van Tienhoven – CEO – BSE in Economics, University of Pennsylvania. Appointed 21 April 2015. Close to 25 years experience in the mining industry primarily with the Anglo American Group and more recently with junior mining companies including Andean R