Goldarc Resources Limited · ASX:GA8

Goldarc Resources — Investor Presentation (February 2026)

29 slides from Goldarc Resources's investor presentation, Feb 19, 2026

  1. Slide 1: Back The Team Focused On The Path To A Self-funded Explorer

    For personal use only Back The Team Focused On The Path To A Self-funded Explorer Investor Presentation February 2026 ASX:GA8

  2. Slide 2: Disclaimers

    DISCLAIMERS This presentation prepared by GoldArc Resources Limited (“Company”) does not purport to contain all the information The Company does not warrant or represent that the actual results, performance or achievements will be as expected, that a prospective investor may require in connection wi

  3. Slide 3: Leonora Gold Project: A Premier Gold Region

    LEONORA GOLD PROJECT A Premier Gold Region For personal use only GoldArc’s Leonora Gold Projects share key geological settings with several nearby operating gold mines and major deposits. GENESIS MINERALS (ASX:GMD): $7.04B MC* Leonora Operations (8.5 Moz Au Resources)1 VAULT MINERALS (ASX:VAU): $4.9

  4. Slide 4: Leonora Gold Project: Belt-scale Potential

    LEONORA GOLD PROJECT Belt-scale Potential 1,200km2 covering two large project area (Leonora North and For personal use only Leonora South) +75km of underexplored prospective strike. Existing JORC Mineral Resource of 200koz at 1.8 g/t Au, including high-grade zones. Leonora North hosts a combined JOR

  5. Slide 5: North Project Mining Partnerships

    LEONORA NORTH PROJECT For personal use only Mining Partnerships ASX:GA8 goldarcres.com.au

  6. Slide 6: Mt Stirling Development Acceleration

    LEONORA NORTH Mt Stirling Development Acceleration For personal use only Strategic Partnership with BML Ventures2 Profit Share Mining Agreement to develop and mine the Mt Striling and Stirling Well Resources (combines 152koz Au JORC Mineral Resource1). BMLs expertise and owner/operator model, signif

  7. Slide 7: Shallow, Existing Resource: Mt Stirling

    LEONORA NORTH Shallow, Existing Resource Mt Stirling Resource For personal use only Hosts a JORC 2012 Mineral Resource of1 137,000oz: 26,000oz @ 2.1g/t Au (Indicated). 111,000oz @ 1.6g/t Au (Inferred) Remains open at depth and to the north with high-grade shoots identified. 1. See Slide 29 for JORC

  8. Slide 8: Strategic Timeline

    LEONORA NORTH Strategic Timeline Jan 26 Feb 26 Mar 26 Apr 26 May 26 Jun 26 Jul 26 Aug 26 Sep 26 For personal use only Baseline studies and submissions (Subsurface, ground, and surface water studies, flora & fauna surveys) Critical long-lead permits (Water, native veg & abstraction licences) Approval

  9. Slide 9: South Project Mining Partnerships

    LEONORA SOUTH PROJECT For personal use only Mining Partnerships ASX:GA8 goldarcres.com.au

  10. Slide 10: Fast-track Production Pathway

    LEONORA SOUTH Fast-track Production Pathway For personal use only Strategic LOI with Mineral Mining Services1 Campaign mining of Orion, Sapphire, Eclipse & Gladstone resources at a time of record gold prices. GoldArc to focus efforts on the larger, high-priority exploration opportunities across its

  11. Slide 11: Near-Term Production Potential: Sapphire

    LEONORA SOUTH Near-Term Production Potential Sapphire Existing Resource For personal use only JORC 2012 Mineral Resource of 21,605oz @ 2.1g/t Au 1 (Inferred) Significant intercepts include2: 6m @ 166g/t Au from 135m inc 4m @ 248.8g/t Au (Sapphire) 5m @ 21.5g/t Au from 19m (Sapphire) 1. See Slide 29

  12. Slide 12: Near-Term Production Potential: Orion

    LEONORA SOUTH Near-Term Production Potential Orion Existing Resource For personal use only Hosts a JORC 2012 Mineral Resource of 26,409oz @ 2.2g/t Au 1 (Inferred) Significant intercepts include 2 : 7m @ 20.5g/t Au from 10m (Orion) 4m @ 46.4g/t Au from 3m (Orion) 1. See Slide 29 for JORC Mineral Reso

  13. Slide 13: Near-Term Production Potential: Eclipse New Discovery

    LEONORA SOUTH Near-Term Production Potential Eclipse New Discovery For personal use only Results demonstrate a robust mineralised system at Eclipse with standout results including 1 : 14m @ 7.49g/t Au from 12m 9m @ 2.84g/t Au from 34m 2m @ 7.50g/t Au from 88m 6m @ 3.14g/t Au from 60m 4m @ 5.20g/t Au

  14. Slide 14: Leonora North Gold Project Exploration

    LEONORA GOLD PROJECT For personal use only Leonora North Exploration ASX:GA8 goldarcres.com.au

  15. Slide 15: A Renewed Resource Growth Strategy

    LEONORA NORTH A Renewed Resource Growth Strategy Leonora North For personal use only Gold Project Located 40km NE of Leonora, and 3km from 7.5mt King of the Hills gold mine1. Existing a combined gold JORC Mineral Resource of 152,000oz @ 1.7g/t Au 2. ~12km of fertile ground along the fertile Ursus Fa

  16. Slide 16: Untested, Parallel Mineralised Structures

    LEONORA NORTH Untested, Parallel Mineralised Structures Parallel structures identified at depth and along For personal use only strike from existing resources. Hydra Prospect along a connecting Fault - significant 1km untested structural corridor. Tyrannus Prospect situated on the parallel mineralis

  17. Slide 17: Multiple New Gold Anomalies

    LEONORA NORTH Multiple New Gold Anomalies Ongoing sampling program defines further high-priority targets 1 For personal use only Multiple rock chip samples from recently delineated soil anomalies emphasise the high-grade. Significant results include: 51.9g/t Au (ASR03106) 11.2g/t Au (ASR03102) 14.2g

  18. Slide 18: Leonora South Gold Project

    LEONORA GOLD PROJECT For personal use only Leonora South ASX:GA8 goldarcres.com.au

  19. Slide 19: Known Mineralised Trends

    LEONORA SOUTH Known Mineralised Trends Gold mineralisation is hosted within a major structural corridor of For personal use only the Norseman-Wiluna Greenstone belt. Mineralisation primarily associated with mafic rocks which have favourable chemical and physical host for gold deposition. Nearby majo

  20. Slide 20: Targeting Multiple, Underexplored Areas

    LEONORA SOUTH Targeting Multiple, Underexplored Areas Leonora South Gold Project For personal use only 8 granted mining licenses ~50km south of Leonora Archean Granite-Greenstone belt. Four priority target areas identified: 1. Niagara 2. Whistler/Woodpecker 3. Cosmopolitan 4. Jessop’s Creek ASX:GA8

  21. Slide 21: 1. Niagara: Eclipse Discovery 2025

    LEONORA SOUTH 1. Niagara Eclipse Discovery 2025 For personal use only Oct 2025 3,000m RC drilling program tested newly identified, near-surface gold targets. Along strike from JORC 2012 MRE of 21,600oz at 2.1g/t 1 Au at Sapphire. High-grade, near-surface gold intersections including2: 14m at 7.49 g/

  22. Slide 22: Stacked Offset Veining at Niagara Target Area

    LEONORA SOUTH 1. Niagara Stacked Offset Veining at Niagara Target Area For personal use only 5km of continuous under ground workings mined between 1886 – 1940 with limited historic shallow drilling. Magnetic anomaly identified which are associated with mafic host rocks. Parallel quartz vein systems

  23. Slide 23: 2. Whistler/Woodpecker

    LEONORA SOUTH 2. Whistler/Woodpecker Maiden AC drilling successfully identified new mineralised systems For personal use only under cover. Four distinct mineralised zones identified, with the easternmost zone open-ended and coinciding with a magnetic low. Encouraging shallow, gold intercepts returne

  24. Slide 24: 3. Cosmopolitan

    LEONORA SOUTH 3. Cosmopolitan Historic channel sampling data identified remnant high-grade mineralisation1. For personal use only 969 located samples (40%) from mining leases M40/02 and M40/342 returned an avg grade of 38.38 g/t Au over an avg width of 1.07m including: 68 samples returned +100 g/t A

  25. Slide 25: 4. Jessop Creek

    LEONORA SOUTH 4. Jessop Creek November 2025 soil sampling defined significant 1.3km long For personal use only gold anomaly (>10 ppb Au), confirming potential of the structure with peak result of 22.5 ppb Au1. First pass AC returned low gold results, however significant polymetallic mineralization w

  26. Slide 26: Corporate Snapshot, Capital Structure & Management

    Corporate Snapshot Capital Structure & Management For personal use only $41.2M 52.5M UNLISTED Board & Management Technical Team MARKET Skilled in taking high grade, economic resources Highly experienced exploration and OPTIONS from discovery through to production complimentary specialist skills Ex P

  27. Slide 27: Investment Highlights

    Investment Highlights For personal use only Strategic Location Dual Value Discovery Pipeline Positioned in the Leonora Goldfields Existing JORC Mineral Resources Two large, strategic land packages with high-grade mineralisation provide near-term production with a strong pipeline of high-priority, tr

  28. Slide 28: General Enquiries

    ASX:GA8 For personal use only General Enquiries +61 8 9420 8205 104 Colin Street, West Perth Western Australia 6005 info@goldarcres.com.au

  29. Slide 29: JORC Mineral Resource Table

    JORC Mineral Resource Table For personal use only GoldArc’s Gold Projects Category Tonnes Gold Grade Gold Ounces (g/t Au) Indicated 391,000 2.1 26,000 Leonora North – Viserion Inferred 2,158,000 1.6 111,000 Leonora North - Stirling Well Inferred 198,000 2.3 15,000 Leonora South - Niagara - Orion Inf

GoldArc Resources — Investor Presentation (February 2026) on 6ix