Grit Metals Corp. · TSXV:FIN

Grit Metals — Investor Presentation (December 2025)

17 slides from Grit Metals's investor presentation, December 2025

  1. Slide 1: Corporate Presentation - Finland Lithium Project

    TSXV: FIN |FRA:W28 |USOTC: EUEMF Corporate Presentation- Finland Lithium Project December 2025

  2. Slide 2: Legal Information

    Legal Information All information contained in this presentation is derived solely from management of Grit Metals Corp. and otherwise publicly available third-party information that has not been independently verified by the Company. Further, the Company does not make any representation as to the co

  3. Slide 3: Why Finland?

    Why Finland? Geology Political Environment Finland is host to several 1.8Ga Li Pegmatite Finland is known for its stable political belts, the largest and most advanced is the environment, which ensures smooth mining Kaustinen with lithium production scheduled operations and low corruption levels, ma

  4. Slide 4: Management

    Management Jeremy Poirier Joel Leonard CEO CFO Mr. Poirier brings nearly two decades of capital markets experience in the Joel is the owner of JCL Partners Chartered Professional Accountants and is a natural resource and technology sectors. He has served in various senior officer seasoned finance ex

  5. Slide 5: Technical Advisory Committee

    Technical Advisorsy Committee Mike Basha Keith Henderson Technical Advisor Technical Advisor Mike Basha previously served as the Company's Vice President, Exploration, Keith Henderson is a mining executive and geologist with over 30 years' where he established Grit's technical foundation and advance

  6. Slide 6: Finland: Emerging Hard Rock Lithium Frontier

    Finland: Emerging Hard Rock Lithium Frontier FINLAND – MATURE MINING JURISDICTION: • Hard Rock Lithium accounts for 60% of Primary Lithium Globally2. • Finland has an established hard rock lithium endowment in several Lithium pegmatite districts, Kaustinen Pegmatite District is the most advanced • L

  7. Slide 7: Grit Metals Sisu Project: Low Risk, High Reward

    Grit Metals Sisu Project: Low Risk, High Reward SISU PROJECT HIGHLIGHTS • Large Li endowed land position adjacent to Sibanye Stillwater’s Keliber Development Project • Sibanye Stillwater’s infrastructure includes a spodumene concentration plant and a Lithium Hydroxide Plant • Grit Metals has identif

  8. Slide 8: World Class Infrastructure – Proven Lithium Belt

    World Class Infrastructure – Proven Lithium Belt EASILY ACCESSIBLE • Regional airports Vaasa and Kokkola, daily flights from Helsinki • Stockholm 5-hour drive highway from Helsinki • Direct 4-hour train to Kokkola SISU PROJECT Grit Metals Corp. |TSXV: FIN |FRA:W28 |USOTC: EUEMF 8

  9. Slide 9: Keliber Project Resources and Reserves

    Keliber Project Resources and Reserves SIBANYE STILLWATER RESOURCES AND RESERVES: KELIBER LI PROJECT5 Mineral Keliber Li Deposit LCE Tonnes (Mt) Li (%) Li₂O (%) LCE (kt) Cluster Resources (kt) EEM Keliber Project Measured 3.3 0.62 1.33 108 135 Licences Indicated 8.0 0.57 1.22 241 302 M+I 11.3 0.58 1

  10. Slide 10: Infrastructure - Hub and Spoke Setup in the Kaustinen Region

    Infrastructure -“Hub and Spoke” Setup in the Kaustinen Region LOGISTICAL ADVANTAGE • Keliber plans to mine from five deposits initially and truck the Li Spodumene to a central concentrate plant • Grit targets are < 10 km to the Keliber Spodumene Concentrator Plant • If Grit makes an economic discove

  11. Slide 11: High Quality Exploration Targets

    High Quality Exploration Targets SISU EXPLORATION HIGHLIGHTS • Surface sampling identified 11 Distinct target clusters including Lithium-rich, spodumene-bearing pegmatite boulders discovered • Targets on trend or immediately adjacent to known Li Pegmatite mineralization • Low-cost exploration method

  12. Slide 12: Path Forward – Proven Exploration Methodology

    Path Forward– Proven Exploration Methodology PROVEN EXPLORATION TECHNIQUE 300 METER DISPERSION ICE DIRECTION MINERALIZED BOULDER SISU TARGET TESTING DISCOVERY BY GRIT DRILL TEST Identify glacially derived boulder train: • Sample ‘up ice’ to source GLACIAL TILL COVER • Deploy inexpensive ground magne

  13. Slide 13: Spodumene-Bearing Li-Rich Pegmatite Boulders

    Spodumene-Bearing Li-Rich Pegmatite Boulders GRIT PROSPECTING EFFECTIVE EXPLORATION • Li Deposits/prospects in the region are mostly concealed under thin veneer of till • Deposits have small footprints (<500 x 500 m; Individual Dykes 1-30 m wide) • Prospecting, boulder tracing and Base of Till (BoT)

  14. Slide 14: Capital Structure

    Capital Structure Shares Outstanding 55,207,148 Options Outstanding 2,350,000 Warrants Outstanding at $0.25 3,117,777 Expire June 2026 Warrants Outstanding at $0.25 2,893,900 Expire October 2026 Warrants Outstanding at $0.20 7,897,500 Expire September 2026 Warrants Outstanding at .20 335,000 Expire

  15. Slide 15: Disclosure Notes

    Disclosure Notes 1 https://thevault.exchange/?get_group_doc=245/1762946719-Sibanye-StillwaterIRhandoutslidesNov2025Final.pdf 2 RCF Ambrian. Lithium Commodity Market Report, August 2023; RCF Ambrian: London, UK, 2023; 53p 3 S-K 1300 Technical Report – Summary for the Sibanye-Stillwater On Keliber Lit

  16. Slide 16: Contact Us

    Contact Us: 503-905 West Pender Vancouver, B.C. V6C 1L6 info@grit-metals.com 604-722-9842

  17. Slide 17: Appendix I – Supplemental Information

    APPENDIX I – SUPPLEMENTAL INFORMATION Grit Metals Corp. |TSXV: FIN |FRA:W28 |USOTC: EUEMF 17

Grit Metals — Investor Presentation (December 2025) on 6ix