    FAST TRACKED RESOURCE GROWTH Gareth Solly – Managing Director ASX | BC8 9 May 2019

  2. Slide 2: Disclaimer and Disclosure

    Disclaimer and Disclosure Disclaimer This presentation includes forward-looking statements. When used in this document, the words such as “could”, “plan”, “estimate”, “expect”, “intend”, “may”, “potential”, “should” and similar expressions are forward-looking statements. Although Black Cat Syndicate

  3. Slide 3: Bulong Gold Project: Building Mine-ready Resource

    Bulong Gold Project Building Mine-ready Resource • January 2018 ($6M IPO) - Consolidation of the Bulong Gold Field • Ideal project with low barriers to mining - 25km east of Kalgoorlie • Extremely active – 13 months of “in-ground” activity • Maiden Resource (as at Dec 2018) - 1.4Mt @ 2.5 g/t Au for

  4. Slide 4: The Opportunity

    The Opportunity Simple Plan, Strong Support, Experienced Team Corporate Information Board of Directors and Key Management ASX Code BC8 Paul Chapman Non Executive Chairman Share Price (8 May 2019) $0.185 Gareth Solly Managing Director Shares on Issue 68.8M Options @ ~$0.20 17.9M Les Davis Non Executi

  5. Slide 5: Bulong Gold Project: Low Barriers to Mining

    Bulong Gold Project Low Barriers to Mining • Proven gold region - 25km from Kalgoorlie • Pre-WW1 mining ~152koz @ >1oz/t • Excellent infrastructure - sealed road - mains power - regional mills - workforce • All Resource on mining leases 9/05/2019 ASX | BC8 5

  6. Slide 6: Bulong Gold Project: Good Hunting Ground

    Bulong Gold Project Good Hunting Ground • Tenements in area tightly held by prospectors • Consolidated by Black Cat - enabling thorough exploration for the first time • Now with 100% control of 87km2 - including granted and pending • Surrounded by major players 9/05/2019 ASX | BC8 6

  7. Slide 7: Bulong Rediscovered

    Bulong Rediscovered Delivering Results • 2018 Learning and Discovery - reinterpretation & first 3D models - first serious drilling in 20 years • 2018 Measured and Methodical - $3.5M spent in ground and acquisition - 24,450m RC drilling - 3,015m diamond drilling (EIS co-funded) - new geophysical data

  8. Slide 8: Robust Maiden Resource

    Robust Maiden Resource 1.4Mt @ 2.5 g/t Au for 109koz • All Resources remain open along strike and at depth • 88% of Resource is potentially open pit minable • 51% of the open pit Resource is contained within the new discovery at Myhree • All Resources on granted Mining Leases – short haulage to mill

  9. Slide 9: Maiden Resource: Robust and Real

    Maiden Resource Robust and Real • Robust, credible, independent, maiden Resource – Mining Plus • Based on optimised A$1,800 pit shells with realistic input costs • 96,000 ounces at 1.0 g/t Au cut-off in open pit position • Underground Resources (at 2.0 g/t Au cut-off) – currently constrained by lack

  10. Slide 10: Myhree

    Myhree Growth to be Fast-Tracked • First drilling (June 2018) - 486kt @ 3.2 g/t Au for 50koz (Dec 2018) • Infill drilling to convert from Inferred to Indicated • Best intercepts to date in northern extension - 28m @ 5.06 g/t Au from 4m • Mineralisation is open to the north, at depth and remains unte

  11. Slide 11: Myhree to Boundary: Closing The Gap

    Myhree to Boundary Closing The Gap • Stacked lodes interpreted to repeat through untested 640m gap • SAM targets – intersection of NE and NS ‘SAM’ breaks are potential zones of thicker, higher grades 1. Refer to ASX announcement 29 April 2019 9/05/2019 ASX | BC8 11

  12. Slide 12: Myhree to Boundary: Open at Each End

    Myhree to Boundary Open at Each End – Numerous Targets Between • Mineralised lodes strike NE (~22°) • Three significant NE orientated ‘SAM’ targets identified • SAM Target 4 is a major NS structure • Result of 28m @ 5.06g/t Au at intersection of SAM Targets 3 and 4 • Drilling into SAM Targets 1 and

  13. Slide 13: Maiden Resource: Positioned for Growth

    Maiden Resource Positioned for Growth • Maiden Resource – 1.4Mt @ 2.50 g/t Au for 109koz = Interim Resource • All Resources remain open along strike and at depth • All corridors prospective for new deposits as well as extension • Extensional and Infill drilling continuing mid May 2019 • Resource upd

  14. Slide 14: Maiden Resource: Growing Rapidly

    Maiden Resource Growing Rapidly • Resources sit within structural - stratigraphic corridors (17km strike) • Queen Margaret Corridor (+6km long) - 0.4Mt @ 2.3 g/t Au for 27koz - 18% of corridor tested • Myhree-Boundary Corridor (+6km long) - 0.8Mt @ 2.7 g/t Au for 72koz - 15% of corridor tested - cur

  15. Slide 15: Potential to the North

    Potential to the North Under Cover and Under Explored • Kanowna Style Package - similar to the 17kms of corridors to the south - hosted by sediment and ultramafic - extension under cover to the north • Greater Woodline - host of some of the largest alluvial goldfields in WA - hosted by basaltic and

  16. Slide 16: Potential to the North

    Potential to the North Under Cover and Under Explored • Kanowna Style Package - similar to the 17kms of corridors to the south - analogies with +5Moz Kanowna Belle deposit o host lithology (felsic intrusions within polymictic conglomerate) o alteration (sericite/fuchsite) o mineralisation (steep plu

  17. Slide 17: Potential to the North

    Potential to the North Under Cover and Under Explored • Greater Woodline - host of some of the largest alluvial goldfields in WA, > 100 oz nuggets - hosted by basaltic and ultramafic rock - contains zones of narrow high grade mineralisation that trend along NW and NS orientations - numerous drill re

  18. Slide 18: Black Cat Syndicate (BC8)

    Black Cat Syndicate (BC8) Building Mine-ready Resource • January 2018 ($6M IPO) - Consolidation of the Bulong Gold Field • Ideal project with low barriers to mining - 25km east of Kalgoorlie • Extremely active – 13 months of “in-ground” activity • Maiden Resource (as at Dec 2018) - 1.4Mt @ 2.5 g/t A

  19. Slide 19: Connect With Us

    Connect With Us 6/16 Nicholson Road, Subiaco WA 6008 PO Box 572, Floreat WA 6014 P | +61 (0) 458 007 713 E | admin@blackcatsyndicate.com.au Twitter / Facebook | @blackcatsyn8 ABN | 63 620 896 282 www.blackcatsyndicate.com.au Booth #30 9/05/2019 ASX | BC8 19

  20. Slide 20: Appendices

    Appendices • Robust Maiden Mineral Bulong Gold Project Cut-Off Category Tonnes Grade Contained Oz g/t Au ‘000 g/t Au ‘000 Resource Estimate – BOUNDARY 1.4Mt @ 2.5 g/t Au for Open Pit (<90m below surface) 1.0 Indicated 74 2.1 5 109koz Inferred 259 1.8 15 Underground (>90m below surface) 2.0 Indicated

  21. Slide 21: Appendices: Exploration Target Supporting Information

    Appendices Exploration Target - Supporting Information CSA Global developed an Exploration Target for the Bulong Gold Project in November 2017. The potential quantity and grade of the Exploration Target was conceptual in nature, as there had been insufficient exploration to estimate a Mineral Resour