  1. Slide 1: Sorby Hills Lead-Silver Project

    Slide 1: Sorby Hills Lead-Silver Project

    Sorby Hills Lead-Silver Project Delivering Metals for a Sustainable Future Investor Presentation - Diggers & Dealers Mining Forum - Booth 87 2 - 4 August 2021

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer Forward-Looking Statements Compliance Statement Certain statements in the presentation are or may be “forward-looking statements” and represent the The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the ‘JORC Company’s intentions, projections,

  3. Slide 3: Investment rationale

    Slide 3: Investment rationale

    Investment rationale The Proven The Most Conductive Pb Battery Metal The primary component of the 12V batteries Ag Metal on Earth Ideal metal for use in solar cells and the Lead found in traditional and electric vehicles Silver electronic components of electric vehicles. Australia’s largest undevelo

  4. Slide 4: Board and management

    Slide 4: Board and management

    Board and management Experienced Board and Management with a proven track record in exploration and development. Gary Comb Simon Noon Richard Monti Andrew Parker Chairman Managing Director and CEO Non-Exec. Director Non-Exec. Director Engineer with over 30 years’ Experienced executive with a strong

  5. Slide 5: Corporate summary

    Slide 5: Corporate summary

    Corporate summary Capital structure (29 July 2021) Share Price History Share Price A$0.40 / share 10.0 1.0 Share Consolidation Shares on Issue 152 million shares Trading Volume (million shares) 8.0 0.8 Market Cap A$61 million Share Price (A$/share) Debt Nil 6.0 0.6 Cash A$12.95 million (as at 30 Jun

  6. Slide 6: PFS highlights

    Slide 6: PFS highlights

    PFS highlights The Sorby Hills PFS released in August 2020 highlights a technically robust project with impressive economics The PFS highlights the low-risk nature of the Sorby Hills Project with a well-defined large-scale Mineral Resource, conventional crush-mill-float processing circuit, high meta

  7. Slide 7: Sorby Hills Project highlights

    Slide 7: Sorby Hills Project highlights

    Sorby Hills Project highlights Australia’s largest undeveloped, near-surface Lead-Silver-Zinc deposit. ✓ 75%/25% Joint Venture Partnership with China’s largest Lead smelter and Silver producer. ✓ Granted pre-native title mining tenements. ✓ EPA Approved for Open Pit Mine and Infrastructure. ✓ Open P

  8. Slide 8: High quality Mineral Resource estimate

    Slide 8: High quality Mineral Resource estimate

    High quality Mineral Resource estimate Large shallow gently dipping Resource with well defined geology Excluded from PFS Mine Plan Image: Long section looking west through the Sorby Hills Resource Grade Contained Metal Deposit Mt Pb Ag Pb Eq. Zn Pb Ag Pb Eq. Zn % g/t % % kt koz kt kt Total 44.9 3.2

  9. Slide 9: Low-risk Project with significant scope for growth

    Slide 9: Low-risk Project with significant scope for growth

    Low-risk Project with significant scope for growth A low-risk Mine Plan underpinned by Conventional processing route producing a 92% Ore Reserves high-quality concentrate • Single stage crush and semi-autogenous grinding (SAG) followed by Sulphide and Ore Pb (%) Pb (kt) Ag (g/t) Ag (Moz) Oxide Flota

  10. Slide 10: Effective and efficient Resource definition

    Slide 10: Effective and efficient Resource definition

    Effective and efficient Resource definition High impact drilling to maximise the value extracted from the Sorby Hills deposit • The Sorby Hills Mineral Resource is a function Growth and classification of Contained metal within the Sorby Hills Mineral Resource of Boab’s demonstrated ability to effect

  11. Slide 11: Exceptional Drilling Results

    Slide 11: Exceptional Drilling Results

    Exceptional Drilling Results Significant Drilling Results to date Previous exploration drilling at Sorby Hill has delivered exceptional results. ASX release 14 February 2019 ASX release 14 August 2019 ASX release 30 January 2020 10.0m at 6.6%Pb, 53g/t Ag 14.0m at 13.0% Pb and 89 /t Ag 10.0m at 7.16%

  12. Slide 12: Opportunity to increase Sorby Hills mining inventory

    Slide 12: Opportunity to increase Sorby Hills mining inventory

    Opportunity to increase Sorby Hills mining inventory Images: Selected Cross-Section through the Omega Deposit showing extensions to the Sorby Hill Mineral Resource identified Diamond drill-rig on site undertaking the Phase V drilling program during the Phase IV drilling program;. • Results from the

  13. Slide 13: Potential increase in mine size

    Slide 13: Potential increase in mine size

    Potential increase in mine size Results of the Phase V drill program together with the ongoing DFS Metallurgical program will act as inputs to an investigation into the potential increase mine life and expand the proposed processing capacity at Sorby Hills The Sorby Hills PFS Mine Plan comprised a t

  14. Slide 14: Preliminary Phase V drilling results

    Slide 14: Preliminary Phase V drilling results

    Preliminary Phase V drilling results Boab’s Phase V drilling program was designed to investigate high impact opportunities to increase mine life and proposed production capacity at Sorby Hills as part of the ongoing DFS Encouraging preliminary results to date include: • extension of the newly recogn

  15. Slide 15: Regional exploration potential

    Slide 15: Regional exploration potential

    Regional exploration potential Eight Mile Creek - Exploration Licence E80/5317 Exploration Tenements 100% owned by Boab Metals covering 217 km2 of relatively underexplored tenure immediately south of Sorby Hills. • 30 km of along-strike geology highly prospective for deposits similar to Sorby Hills.

  16. Slide 16: Strategic Acquisition of Manbarrum Zinc-Lead-Silver Project

    Slide 16: Strategic Acquisition of Manbarrum Zinc-Lead-Silver Project

    Strategic Acquisition of Manbarrum Zinc-Lead-Silver Project Boab has entered a binding agreement to acquire 100% of the Manbarrum Zinc-Lead-Silver Project Key highlights include: • Manbarrum is strategically located 25km east of the Sorby Hills Lead-Silver Zinc Project. • Mineral Resources declared

  17. Slide 17: Sorby Hills JV partnership

    Slide 17: Sorby Hills JV partnership

    Sorby Hills JV partnership Boab (75% interest) Henan Yuguang Gold and Lead Co., Ltd (25% contributing interest) • Very positive meetings have been held with Joint Venture partner Henan Yuguang Gold and Lead Co., Ltd (“Yuguang”), the largest Lead smelting company and Silver producer in China • Yuguan

  18. Slide 18: Project financing

    Slide 18: Project financing

    Project financing Boab is well progressed on preparing the Sorby Hills Project for project financing • Boab has engaged BurnVoir Corporate Finance to advise on, analyse and arrange a project finance solution for the Sorby Hills Project. • The Company has engaged with Australia Government financing a

  19. Slide 19: Sorby Hills concentrate offtake

    Slide 19: Sorby Hills concentrate offtake

    Sorby Hills concentrate offtake Preliminary Soundings with Tier-1 offtakers have confirmed a strong appetite for the Sorby Hills concentrate • Boab has held preliminary soundings with a select group of potential local and offshore customers for the Sorby Hills Lead-Silver Concentrate offtakers. • Th

  20. Slide 20: Establishing deep roots within the local community

    Slide 20: Establishing deep roots within the local community

    Establishing deep roots within the local community Boab is extremely proud to be the Naming Rights Sponsor the Ord Valley Muster for 2022 and beyond. ▪ Sense of community plays a key role in economic and social well-being of stakeholders across the east Kimberley Region. ▪ The Ord Valley Muster has

  21. Slide 21: The Silver & Lead Markets

    Slide 21: The Silver & Lead Markets

    The Silver & Lead Markets Boab Metals Limited ASX:BML 21

  22. Slide 22: Lead: An underrated battery metal

    Slide 22: Lead: An underrated battery metal

    Lead: An underrated battery metal In 2019, 86% of refined Lead production was used in the production of Lead Acid batteries1 Sorby Hills PFS Revenue Split Growth in Lead-Acid Battery Market2 475,223 t 500 50 Payable Lead 400 40 Lead A$1.4 Billion Revenue US$ billion US$32Bn 300 30 GWh US$25Bn 14,300

  23. Slide 23: Silver: A precious metal with strong green credentials

    Slide 23: Silver: A precious metal with strong green credentials

    Silver: A precious metal with strong green credentials Silver‘s traditional role as a storer of wealth is complemented by increasing industrial demand Sorby Hills PFS Revenue Split BML Share Price vs A$ Silver Price 475,223 t 10.0 1.00 BML Trading Volume (Millions) BML Share Price (A$/sh) Payable Le

  24. Slide 24: Next Steps

    Slide 24: Next Steps

    Next Steps Boab Metals Limited ASX:BML 24

  25. Slide 25: Development timeline providing significant newsflow

    Slide 25: Development timeline providing significant newsflow

    Development timeline providing significant newsflow On track to become a significant West Australian Lead-Silver producer in 2023 Recent News ✓ Preliminary Offtake Soundings demonstrate strong demand for Sorby Hills Concentrate ✓ Completion of Phase IV drilling reveals significant opportunities to e

  26. Slide 26: Thank you

    Slide 26: Thank you

    Thank you Simon Noon – Managing Director & CEO info@BoabMetals.com www.BoabMetals.com www.linkedin.com/company/boab-metals

  27. Slide 27: Appendix

    Slide 27: Appendix

    Appendix 27

  28. Slide 28: PFS capital and operating costs

    Slide 28: PFS capital and operating costs

    PFS capital and operating costs Capital Cost Estimate Operating Cost Estimate1 Capital Item A$M Cost Centre A$M A$/t ore A$/lb2 US$/lb2 Pre Production Mining 24.3 Mining 347 23.48 0.33 0.23 Process Plant incl. EPC fee 105.4 Processing 292 19.80 0.28 0.20 Infrastructure 20.5 G&A 107 7.28 0.10 0.07 Tr

  29. Slide 29: PFS life of mine metrics

    Slide 29: PFS life of mine metrics

    PFS life of mine metrics Item Unit Base Case Item Unit Base Case Economic Assumptions Cash Flow Lead Price US$/t 2,095 Lead Revenue A$M 1,422.3 Silver Price US$/oz 21.10 Silver Revenue A$M 431.1 Exchange Rate A$:US$ 0.70 Gross Revenue A$M 1,853.3 Physicals Royalties A$M (69.5) Life of Mine (LOM) Yea

  30. Slide 30: Mineral Resource Estimate - April 2021

    Slide 30: Mineral Resource Estimate - April 2021

    Mineral Resource Estimate - 6 April 2021 Grade Contained Metal Deposit Mt Pb Ag Pb Eq. Zn Pb Ag Pb Eq. Zn % g/t % % kt koz kt kt A 0.6 5.1 22 5.7 0.9 30 411 34 5 B 2.3 3.9 22 4.5 0.3 91 1,608 105 7 Omega 16.6 3.4 34 4.3 0.4 560 18,233 718 69 Norton 20.0 2.7 36 3.7 0.4 545 23,067 745 89 Alpha 2.0 3.1

  31. Slide 31: Current ore Reserve and PFS mine plan

    Slide 31: Current ore Reserve and PFS mine plan

    Current ore Reserve and PFS mine plan A low-risk Mine Plan underpinned by 92% Ore Reserves PFS Mining Schedule Ore Pb (%) Pb (kt) Ag (g/t) Ag (Moz) 1,200 6.0% 120 Classification Mt % kt g/t Moz 1,000 5.0% 100 Proved 6.8 4.1 275 53.0 11.5 Silver Grade (g/t) Probable 6.9 3.2 219 27.6 6.1 800 4.0% '000

  32. Slide 32: Metallurgy and processing

    Slide 32: Metallurgy and processing

    Metallurgy and processing Production Summary PFS Processing Schedule 500 10.0% 100 Plant Process Crush, Grind and Float 400 8.0% 80 Plant Throughput 1.5Mt p.a. '000 tonnes Silver Grade (g/t) Lead Grade (%) 300 6.0% 60 Average Feed Grade 3.6% Lead, 39.5 g/t Silver 200 4.0% Average Lead Recovery 93.3%

  33. Slide 33: Undeveloped ASX Listed Silver Resources located in Australia

    Slide 33: Undeveloped ASX Listed Silver Resources located in Australia

    Undeveloped ASX Listed Silver Resources located in Australia Sorby Hills is among the largest undeveloped Silver Resources located in Australia 200 Contained Silver Ounces (Millions) 150 100 Sorby Hills 50 - SVL-ASX MCT-ASX RDM-ASX BML-ASX TGN-ASX IVR-ASX AML-ASX ARD-ASX WRM-ASX KGL-ASX HRZ-ASX G1A-

  34. Slide 34: Peer Comparison Supporting Information

    Slide 34: Peer Comparison Supporting Information

    Peer Comparison Supporting Information Measured Indicated Inferred Total Primary Ticker Project Stage Source Metal Mt g/t Moz Mt g/t Moz Mt g/t Moz Mt g/t Moz SVL-ASX Bowdens Feasibility Complete Silver 76.0 45 111 29.0 31 29 23.0 31 23 128.0 40 163 2020 AGM Presentation 27 Nov 2020, pg 35 MCT-ASX A

  35. Slide 35: Equivalent calculation

    Slide 35: Equivalent calculation

    Equivalent calculation The contained metal equivalence It is Boab’s opinion that all elements Metal equivalents are highly dependent on the included in the metal equivalent calculation metal prices used to derive the formula. Boab formula is based on the Sorby Hills notes that the metal equivalence