Compagnie De Saint-gobain Sa · EURONEXT:SGO

Compagnie De Saint-gobain Sa — Saint-Gobain — Investor Presentation (2025)

51 slides from Compagnie De Saint-gobain Sa's investor presentation, 2025

  1. Slide 1: Architecture Student Contest, 20th International Edition, Nord Isère 2025

    ARCHITECTURE STUDENT CONTEST ARCHITECTURE STUDENT CONTEST 20t INTERNATIONAL EDITION, NORD ISERE 2025

  2. Slide 2: Saint-Gobain Architecture Student Contest, Linea Natura

    S AINTGOBAI N ARCHI TECT URES TUDENTCONT EST L INEANAT URA

  3. Slide 3: Students and tutor, University of Architecture, Civil Engineering and Geodesy

    Kos tadi nChol akov Ni col eChobanova UNIVERSI TY OFARCHI TECT URE, CIVILENGENEERI NG ANDGEODESY T UT OR: As soc.Pr of.Dr.Arch. Evgeni aAleksandrova

  4. Slide 4: Research

    RES EARCH

  5. Slide 5: Research: sun exposure, wind rose and precipitation

    RES EARCH S UNEXPOS URE WI NDROS E–DECEMBER WI NDROS E–J UNE AVERAGEPRECI PIT ATI ON S UMMERS OLS TICE–J UNE21 SUNLI GHTANGL E–67.20° SUNRIS E–05:49:48 SUNSET–21: 32:48 DURATIONOFS UNL I GHT–15H43M 00S EC MAXI MUM PRECIPI TAT ION–114. 2 mm/m²(MAY) MI NIMUM PRECI PIT ATI ON–66.7 WI NTERS OLS TICE–DEC

  6. Slide 6: Site analysis

    S ITEANAL YSI S L EGEND№ 1: BOUNDARYOFT HEASS IGNMENT AUT OROUTEA43 L YON–F REJ UST UNNEL RAI LWAYLINE L YON–GRENOBLE DEPART MENT ALROADD313 DEPART MENT ALROADD318 L EGEND №2: BOUNDARYOF T HEASSI GNMENT MAINACCES S ROADST OT HEPROPERT Y DEPART MENT ALROADD318 DEPART MENT ALROADD313 S ERVI CES TREET

  7. Slide 7: Zone A: New construction

    ZONE-А- NEW CONS TRUCT ION

  8. Slide 8: Master plan

    MAS TERPL AN L EGEND: BOUNDARY OFT HEASSI GNMENT NEWLY DES IGNEDBUI LDI NGS BUI LDI NGSF OR F UTUREDEVEL OPMENT EXI STI NG BUI LDI NGS 1. DORMI TORIES 2. LABORAT ORY 3. RESTAURANT /CAF ETERIA 4. EXHIBIT IONS PACE 5.CAMPI NG S I TE 6. WOODMAT ERIALRECYCL I NG 7.AS TOS 8. LESGRANDSAT ELIERS 0 10 50 10

  9. Slide 9: Shape processing

    Z| SHAPE PROCESSING —— STAGE 1: FOLLOWING OF THE PROPERTY BORDER STAGE 2: SUBTRACKTING VOLUMES FOR PASSAGES STAGE 4: FINALIZING THE VOLUME-SPACE SOLUTION STAGE 3: EXTRUSION AND CRUSHING OF THE VOLUMES, FOLLOWING THE RHYTHM OF THE TREES NI

  10. Slide 10: Accessible environment

    ACCESSIBLE ENVIRONMENT LEGEND: BOUNDARY OF THE ASSIGNMENT ive ACCESSIBLE ROUTES LEGEND: 1. DORMITORIES 2.LABORATORY 3.RESTAURANT/CAFETERIA, 4.EXHIBITION SPACE 5.CAMPING SITE 6.WOOD MATERIAL RECYCLING 7.ASTOS 8.LES GRANDS ATELIERS

  11. Slide 11: Dormitory

    DORMI TORY

  12. Slide 12: Dormitory floor plan ±0.00

    DORMI TORY L EGEND: 1.SI NGL EROOM 2.DOUBL EROOM 3. ROOM F ORSIXPEOPLE 4. ROOM FOREI GHTPEOPLE 5. S ERVI CEROOM 6. SANITARYFACILI TI ES F LOORPL AN±0. 00 01 5 10

  13. Slide 13: Dormitory floor plan -4.30

    DORMI TORY L EGEND: 1.SOCI ALSPACES 2. BICYCLEPARKI NG 3.L AUNDRYROOM 4.S TORAGEROOM F LOORPL AN-4. 30 01 5 10

  14. Slide 14: Slide 14

  15. Slide 15: Slide 15

  16. Slide 16: Dormitory floor plan +3.50

    DORMI TORY L EGEND: 1.SI NGL EROOM 2.DOUBL EROOM 3. ROOM F ORSIXPEOPLE 4. ROOM FOREI GHTPEOPLE 5. S ERVI CEROOM 6. SANITARYFACILI TI ES F LOORPL AN+3. 50 01 5 10

  17. Slide 17: Dormitory roof plan

    DORMI TORY 4 L EGEND: 1.I NSPECTI ONHAT CH 2. SOLARPANELS 3. TECHNICALROOM 4. RAINWATERTANK ROOFPL AN 01 5 10

  18. Slide 18: Dormitory sections

    DORMITORY SECTION 1-1 SECTION 2-2

  19. Slide 19: Dormitory section: energy and climate strategy

    DORMI TORY S OLARCOL LECT ORS RAI NWAT ERCOL LECT ION CL OSEDS HADI NG S YST EM I MPROVING T HEMICROCLI MAT E GEOT HERMALENERGY OPENS HADI NG S YST EM NAT URALVENT ILAT ION S ECT ION

  20. Slide 20: Dormitory elevations

    DORMI TORY S OUT HEL EVAT ION NORT HEL EVAT ION 01 5 10

  21. Slide 21: Slide 21

  22. Slide 22: Slide 22

  23. Slide 23: Slide 23

  24. Slide 24: Laboratory

    L ABORAT ORY

  25. Slide 25: Laboratory floor plan ±0.00

    L ABORAT ORY L EGEND: 1. OF F ICES PACE 2. CONFERENCEHAL L 3. KIT CHEN 4.RESTROOMS F LOORPL AN±0. 00 01 5 10

  26. Slide 26: Laboratory floor plan -4.30

    L ABORAT ORY L EGEND: 1. LABARATORY 2.PROT OTYPI NG AREA 3. MACHI NEROOMS 4. MUL TI -PURPUSEROOM 5.T ECHNI CALROOM 6.CLOAKROOM F LOORPL AN- 4.30 01 5 10

  27. Slide 27: Laboratory roof plan

    L ABORAT ORY L EGEND: 1.I NSPECTI ONHAT CH 2. SOLARPANELS 3. RAINWATERTANK 4. TECHNICALROOM ROOFPL AN 01 5 10

  28. Slide 28: Laboratory sections

    L ABORAT ORY S ECT ION4- 4 S ECT ION3- 3 0 1 5 10

  29. Slide 29: Laboratory section: energy and climate strategy

    L ABORAT ORY S OLARCOL LECT ORS RAI NWAT ERCOL LECT ION I MPROVING T HEMICROCLI MAT E GEOT HERMALENERGY NAT URALVENT ILAT ION S ECT ION

  30. Slide 30: Laboratory elevations

    L ABORAT ORY S OUT HEL EVAT ION NORT HEL EVAT ION 01 5 10

  31. Slide 31: Details

    DET AIL S U=0, 09[ W/m2. K] RW=63dB RW=63dB RW=70dB 0 20 50 100 200

  32. Slide 32: Energy efficiency and lifecycle assessment

    ENERGYEF FICI ENCY& L IFECYCL EAS SES MENT GL AZI NG: L ightt ransmi ttance( TL ):63% Sol arfactor(g):0, 29 Ugl as:0, s 6[W/m2.K] Rw:44dB COL LECT EDRAI NWAT ER: Thet otalamountofrai nwater col l ectedduri ngannualrai nfal lof 750mlperm2 i s853, 8m3

  33. Slide 33: W - "

    W - "

  34. Slide 34: Slide 34

  35. Slide 35: Restaurant: future development

    REST AURANT F UTUREDEVEL OPMENT

  36. Slide 36: Restaurant floor plans and roof plan

    RES TAURANT L EGEND F LOORPL AN±0.00: 1.DINING HALL 2.VERANDA 3.WINDL OBBY 4. STORAGEROOM 5. RES ROOM F LOORPL AN ±0. 00 ROOFPL AN LEGEND F LOORPL AN- 3. 50: 1. KITCHEN 2. DISHWAS HING ROOM 3. OF FI CE 4. CHANGI NG ROOM 5.ST ORAGEROOMS 6. COL DS TORAGE 7.RESTROOM 8. WAS T EAREA 01 5 10 F LOORPL AN -

  37. Slide 37: Restaurant section

    RES TAURANT S ECT ION5- 5 0 1 5 10

  38. Slide 38: Slide 38

  39. Slide 39: Slide 39

  40. Slide 40: Slide 40

  41. Slide 41: Slide 41

  42. Slide 42: Slide 42

  43. Slide 43: Zone B: Renovation

    Z ONE-B- RENOVAT ION

  44. Slide 44: Renovation master plan

    RENOVATION MASTER PLAN—

  45. Slide 45: Renovation floor plan 1

    COLOR LEGEND: NEW STRUCTURAL ELEMENTS NEW LIGHT PARTITION WALLS SEALED OPENINGS DEMOLISHION OF EXISTING LIGHT PARTITIOIN WALLS NEW OPENINGS LEGEND: 1.ENTRANCE AREA 2.MULTI-PURPOSE ROOMS S.CAFETERIA RENOVATION FLOOR PLAN 1 PROJECT PROPOSA\

  46. Slide 46: Renovation floor plan 2

    COLOR LEGEND: NEW STRUCTURAL ELEMENTS NEW LIGHT PARTITION WALLS SEALED OPENINGS DEMOLISHION OF EXISTING LIGHT PARTITIOIN WALLS NEW OPENINGS LEGEND: 1.OFFICE SPACES 2.CONFERENCE ROOM RENOVATION —— ig WALLS PLAN FLOOR PLAN 2 PROJECT PROPOSAL

  47. Slide 47: Renovation elevations

    RENOVATION NORTHEAST ELEVATION 10 SOUTHWEST ELEVATION

  48. Slide 48: Slide 48

  49. Slide 49: Slide 49

  50. Slide 50: Slide 50

  51. Slide 51: Slide 51

Saint-Gobain — Investor Presentation (2025) on 6ix