Slide 1: Architecture Student Contest, 20th International Edition, Nord Isère 2025
ARCHITECTURE STUDENT CONTEST ARCHITECTURE STUDENT CONTEST 20t INTERNATIONAL EDITION, NORD ISERE 2025
Slide 2: Saint-Gobain Architecture Student Contest, Linea Natura
S AINTGOBAI N ARCHI TECT URES TUDENTCONT EST L INEANAT URA
Slide 3: Students and tutor, University of Architecture, Civil Engineering and Geodesy
Kos tadi nChol akov Ni col eChobanova UNIVERSI TY OFARCHI TECT URE, CIVILENGENEERI NG ANDGEODESY T UT OR: As soc.Pr of.Dr.Arch. Evgeni aAleksandrova
Slide 4: Research
RES EARCH
Slide 5: Research: sun exposure, wind rose and precipitation
RES EARCH S UNEXPOS URE WI NDROS E–DECEMBER WI NDROS E–J UNE AVERAGEPRECI PIT ATI ON S UMMERS OLS TICE–J UNE21 SUNLI GHTANGL E–67.20° SUNRIS E–05:49:48 SUNSET–21: 32:48 DURATIONOFS UNL I GHT–15H43M 00S EC MAXI MUM PRECIPI TAT ION–114. 2 mm/m²(MAY) MI NIMUM PRECI PIT ATI ON–66.7 WI NTERS OLS TICE–DEC
Slide 6: Site analysis
S ITEANAL YSI S L EGEND№ 1: BOUNDARYOFT HEASS IGNMENT AUT OROUTEA43 L YON–F REJ UST UNNEL RAI LWAYLINE L YON–GRENOBLE DEPART MENT ALROADD313 DEPART MENT ALROADD318 L EGEND №2: BOUNDARYOF T HEASSI GNMENT MAINACCES S ROADST OT HEPROPERT Y DEPART MENT ALROADD318 DEPART MENT ALROADD313 S ERVI CES TREET
Slide 7: Zone A: New construction
ZONE-А- NEW CONS TRUCT ION
Slide 8: Master plan
MAS TERPL AN L EGEND: BOUNDARY OFT HEASSI GNMENT NEWLY DES IGNEDBUI LDI NGS BUI LDI NGSF OR F UTUREDEVEL OPMENT EXI STI NG BUI LDI NGS 1. DORMI TORIES 2. LABORAT ORY 3. RESTAURANT /CAF ETERIA 4. EXHIBIT IONS PACE 5.CAMPI NG S I TE 6. WOODMAT ERIALRECYCL I NG 7.AS TOS 8. LESGRANDSAT ELIERS 0 10 50 10
Slide 9: Shape processing
Z| SHAPE PROCESSING —— STAGE 1: FOLLOWING OF THE PROPERTY BORDER STAGE 2: SUBTRACKTING VOLUMES FOR PASSAGES STAGE 4: FINALIZING THE VOLUME-SPACE SOLUTION STAGE 3: EXTRUSION AND CRUSHING OF THE VOLUMES, FOLLOWING THE RHYTHM OF THE TREES NI
Slide 10: Accessible environment
ACCESSIBLE ENVIRONMENT LEGEND: BOUNDARY OF THE ASSIGNMENT ive ACCESSIBLE ROUTES LEGEND: 1. DORMITORIES 2.LABORATORY 3.RESTAURANT/CAFETERIA, 4.EXHIBITION SPACE 5.CAMPING SITE 6.WOOD MATERIAL RECYCLING 7.ASTOS 8.LES GRANDS ATELIERS
Slide 11: Dormitory
DORMI TORY
Slide 12: Dormitory floor plan ±0.00
DORMI TORY L EGEND: 1.SI NGL EROOM 2.DOUBL EROOM 3. ROOM F ORSIXPEOPLE 4. ROOM FOREI GHTPEOPLE 5. S ERVI CEROOM 6. SANITARYFACILI TI ES F LOORPL AN±0. 00 01 5 10
Slide 13: Dormitory floor plan -4.30
DORMI TORY L EGEND: 1.SOCI ALSPACES 2. BICYCLEPARKI NG 3.L AUNDRYROOM 4.S TORAGEROOM F LOORPL AN-4. 30 01 5 10
Slide 14: Slide 14
Slide 15: Slide 15
Slide 16: Dormitory floor plan +3.50
DORMI TORY L EGEND: 1.SI NGL EROOM 2.DOUBL EROOM 3. ROOM F ORSIXPEOPLE 4. ROOM FOREI GHTPEOPLE 5. S ERVI CEROOM 6. SANITARYFACILI TI ES F LOORPL AN+3. 50 01 5 10
Slide 17: Dormitory roof plan
DORMI TORY 4 L EGEND: 1.I NSPECTI ONHAT CH 2. SOLARPANELS 3. TECHNICALROOM 4. RAINWATERTANK ROOFPL AN 01 5 10
Slide 18: Dormitory sections
DORMITORY SECTION 1-1 SECTION 2-2
Slide 19: Dormitory section: energy and climate strategy
DORMI TORY S OLARCOL LECT ORS RAI NWAT ERCOL LECT ION CL OSEDS HADI NG S YST EM I MPROVING T HEMICROCLI MAT E GEOT HERMALENERGY OPENS HADI NG S YST EM NAT URALVENT ILAT ION S ECT ION
Slide 20: Dormitory elevations
DORMI TORY S OUT HEL EVAT ION NORT HEL EVAT ION 01 5 10
Slide 21: Slide 21
Slide 22: Slide 22
Slide 23: Slide 23
Slide 24: Laboratory
L ABORAT ORY
Slide 25: Laboratory floor plan ±0.00
L ABORAT ORY L EGEND: 1. OF F ICES PACE 2. CONFERENCEHAL L 3. KIT CHEN 4.RESTROOMS F LOORPL AN±0. 00 01 5 10
Slide 26: Laboratory floor plan -4.30
L ABORAT ORY L EGEND: 1. LABARATORY 2.PROT OTYPI NG AREA 3. MACHI NEROOMS 4. MUL TI -PURPUSEROOM 5.T ECHNI CALROOM 6.CLOAKROOM F LOORPL AN- 4.30 01 5 10
Slide 27: Laboratory roof plan
L ABORAT ORY L EGEND: 1.I NSPECTI ONHAT CH 2. SOLARPANELS 3. RAINWATERTANK 4. TECHNICALROOM ROOFPL AN 01 5 10
Slide 28: Laboratory sections
L ABORAT ORY S ECT ION4- 4 S ECT ION3- 3 0 1 5 10
Slide 29: Laboratory section: energy and climate strategy
L ABORAT ORY S OLARCOL LECT ORS RAI NWAT ERCOL LECT ION I MPROVING T HEMICROCLI MAT E GEOT HERMALENERGY NAT URALVENT ILAT ION S ECT ION
Slide 30: Laboratory elevations
L ABORAT ORY S OUT HEL EVAT ION NORT HEL EVAT ION 01 5 10
Slide 31: Details
DET AIL S U=0, 09[ W/m2. K] RW=63dB RW=63dB RW=70dB 0 20 50 100 200
Slide 32: Energy efficiency and lifecycle assessment
ENERGYEF FICI ENCY& L IFECYCL EAS SES MENT GL AZI NG: L ightt ransmi ttance( TL ):63% Sol arfactor(g):0, 29 Ugl as:0, s 6[W/m2.K] Rw:44dB COL LECT EDRAI NWAT ER: Thet otalamountofrai nwater col l ectedduri ngannualrai nfal lof 750mlperm2 i s853, 8m3
Slide 33: W - "
W - "
Slide 34: Slide 34
Slide 35: Restaurant: future development
REST AURANT F UTUREDEVEL OPMENT
Slide 36: Restaurant floor plans and roof plan
RES TAURANT L EGEND F LOORPL AN±0.00: 1.DINING HALL 2.VERANDA 3.WINDL OBBY 4. STORAGEROOM 5. RES ROOM F LOORPL AN ±0. 00 ROOFPL AN LEGEND F LOORPL AN- 3. 50: 1. KITCHEN 2. DISHWAS HING ROOM 3. OF FI CE 4. CHANGI NG ROOM 5.ST ORAGEROOMS 6. COL DS TORAGE 7.RESTROOM 8. WAS T EAREA 01 5 10 F LOORPL AN -
Slide 37: Restaurant section
RES TAURANT S ECT ION5- 5 0 1 5 10
Slide 38: Slide 38
Slide 39: Slide 39
Slide 40: Slide 40
Slide 41: Slide 41
Slide 42: Slide 42
Slide 43: Zone B: Renovation
Z ONE-B- RENOVAT ION
Slide 44: Renovation master plan
RENOVATION MASTER PLAN—
Slide 45: Renovation floor plan 1
COLOR LEGEND: NEW STRUCTURAL ELEMENTS NEW LIGHT PARTITION WALLS SEALED OPENINGS DEMOLISHION OF EXISTING LIGHT PARTITIOIN WALLS NEW OPENINGS LEGEND: 1.ENTRANCE AREA 2.MULTI-PURPOSE ROOMS S.CAFETERIA RENOVATION FLOOR PLAN 1 PROJECT PROPOSA\
Slide 46: Renovation floor plan 2
COLOR LEGEND: NEW STRUCTURAL ELEMENTS NEW LIGHT PARTITION WALLS SEALED OPENINGS DEMOLISHION OF EXISTING LIGHT PARTITIOIN WALLS NEW OPENINGS LEGEND: 1.OFFICE SPACES 2.CONFERENCE ROOM RENOVATION —— ig WALLS PLAN FLOOR PLAN 2 PROJECT PROPOSAL
Slide 47: Renovation elevations
RENOVATION NORTHEAST ELEVATION 10 SOUTHWEST ELEVATION
Slide 48: Slide 48
Slide 49: Slide 49
Slide 50: Slide 50
Slide 51: Slide 51