Energy World Corporation Ltd · ASX:EWC

Energy World — Shareholder Meeting (October 2010)

15 slides from Energy World's shareholder meeting presentation, Oct 28, 2010

  1. Slide 1: Presentation to Shareholders Annual General Meeting

    For personal use only EWC ENERGY WORLD CORPORATION Presentation to Shareholders Annual General Meeting 28 October 2010 ENERGY WORLD CORPORATION

  2. Slide 2: Disclaimer

    EWC Disclaimer • These materials have been prepared by Energy World Corporation Limited (the "Company") solely for information use For personal use only during this presentation. These materials may not be copied, reproduced, passed on or redistributed, directly or indirectly, to any other person (w

  3. Slide 3: Introduction - Asia's Appetite for Energy

    EWC Introduction - Asia’s Appetite for Energy kWh 0 2000 4000 6000 8000 10000 12000 14000 16000 For personal use only United States: 13351 Australia: 11193 New Zealand: 8937 Singapore: 8170 Japan: 8072 South Korea: 7391 Germany: 7029 United Kingdom: 6206 Energy World Corporation has always Hong Kong

  4. Slide 4: Power Operations MW Plant

    EWC Indonesia Power Operations - Update Indonesia – 135 MW Plant For personal use only • 135 MW Plant is fully operational • 92.5% Plant availability: exceeding PPA targets • Plant Output of 1,322 GWh in FY2010 135 MW Plant Switch Yard ENERGY WORLD CORPORATION

  5. Slide 5: Power Operations MW Expansion

    EWC Indonesia Power Operations - Update Indonesia – 60 MW Expansion For personal use only • Currently fully operational • During the course of the last FY, turbine was down from October 2009 to February 2010. Since then unit was fully repaired and recommissioned. 60 MW Expansion ENERGY WORLD CORPORA

  6. Slide 6: Power Operations MW Expansion

    EWC Indonesia Power Operations - Update Indonesia – 120 MW Expansion For personal use only • Amendment to PPA agreed upon with Indonesia’s PLN and currently awaiting the Minister of Energy’s signoff. Typical gas turbine power plant under construction. ENERGY WORLD CORPORATION

  7. Slide 7: Gas Operations Gas Field Operations

    EWC Indonesia Gas Operations - Update Indonesia – Gas Field Operations • Gas plant fully operational. For personal use only • Sengkang Further Plan of Development (for Kampung Baru field) and Gas Supply Agreement being finalized to provide gas for 120 MW expansion. • EEES nominated as supplier by BP

  8. Slide 8: Gas Operations Gas Field Operations

    EWC Indonesia Gas Operations - Update Indonesia – Gas Field Operations For personal use only • Plan of Development for Walanga, Sampi Sampi, Sallu Bullo and Bonge fields submitted for approval to provide gas for Sengkang LNG project. Kampung Baru Gas Plant ENERGY WORLD CORPORATION

  9. Slide 9: LNG Project Update

    EWC Indonesia LNG Project - Update Indonesia – LNG Project Update • BPMIGAS currently reviewing the Plan of For personal use only Development for Walanga, Sampi Sampi, Sallo Bullo and Bonge gas fields. • Plan for production of LNG has been delayed pending approval of Plan of Development by BPMIGAS,

  10. Slide 10: Australia - Power operations update

    EWC Australia Power Operations - Update Australia – Power operations update For personal use only • Plant fully operational. • Availability factor for Alice Springs Power Plant was 80.38% for FY2010. • 49.42 GWh sold in the year. Alice Springs Power Plant ENERGY WORLD CORPORATION

  11. Slide 11: Papua New Guinea - LNG project update

    EWC PNG Liquefaction Plant - Update Papua New Guinea – LNG project update For personal use only • Heads of Agreement signed with InterOil to develop 2 MTPA Liquefaction plant in PNG. EWC’s CEO Stewart Elliott (Right) with Henry Aldorf of InterOil and PNG’s Prime Minister Sir Michael Somare (Centre)

  12. Slide 12: Philippines - LNG hub terminal update

    EWC Philippines LNG Hub Terminal - Update Philippines – LNG hub terminal update For personal use only • Environmental Compliance Certificate issued to EWC in December 2009 for up to 1 MTPA throughput for our LNG Hub Terminal. LNG Hub Terminal Inside an LNG tank ENERGY WORLD CORPORATION

  13. Slide 13: OTCQX Listing

    EWC Listing on OTCQX OTCQX Listing For personal use only • In September we successfully listed shares held by American Depository Receipts on the OTCQX International Stock Exchange in the U.S. • The purpose of listing was to provide easier access to U.S. based investors. • We participated in a non-d

  14. Slide 14: SEHK Listing

    EWC SEHK Listing SEHK Listing For personal use only • Plans to go forward with a listing on the Stock Exchange of Hong Kong are on track. • We are receiving strong support from our sponsors: HSBC, CLSA, Standard Chartered, etc. • Impact of potential merger of ASX with SGX is yet to be seen. ENERGY W

  15. Slide 15: Contact details

    For personal use only EWC ENERGY WORLD CORPORATION LIMITED 9A Seaforth Crescent, Seaforth, NSW 2092, Australia Tel : (61 2) 9247 6888 Fax : (61 2) 9247 6100 28 October, 2010 ENERGY WORLD CORPORATION

Energy World — Shareholder Meeting (October 2010) on 6ix