Vision Lithium, Inc. · TSXV:VLI

Vision Lithium — Investor Presentation (May 2022)

29 slides from Vision Lithium's investor presentation, May 2022

  1. Slide 1: Corporate Presentation – Battery Mineral Exploration May 2022

    CORPORATE PRESENTATION BATTERY MINERAL EXPLORATION MAY 2022 TSX.V: VLI OTCQB: ABEPF FSE: 1AJ2

  2. Slide 2: Forward Looking Statement

    TSXV: VLI 2 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com FORWARD LOOKING STATEMENT Caution regarding forward-looking information: This presentation contains certain “forward-looking statements” under applicable Canadian securities laws. Forward-looking statements include, but are not limited to, stateme

  3. Slide 3: Qualified Person and Third Party Data

    TSXV: VLI 3 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com QUALIFIED PERSON AND THIRD PARTY DATA The scientific and technical information in this presentation has been reviewed and approved by Yves Rougerie, Geologist, President and CEO of the Company (the “Qualified Person”). Mr. Rougerie is a “qualified

  4. Slide 4: Board of Directors & Management

    TSXV: VLI 4 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com BOARD OF DIRECTORS & MANAGEMENT YVES J. ROUGERIE VICTOR CANTORE NANCY LACOURSIÈRE B.SC., GEO. Executive Chairman of the Board BAA President and Chief Executive Officer CFO (Montreal, Quebec) Mr. Victor Cantore, (Val-d’Or, Quebec) Yves Rougerie, P.

  5. Slide 5: Board of Directors & Management

    TSXV: VLI 5 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com BOARD OF DIRECTORS & MANAGEMENT ROBERT C. BRYCE Scott Jobin-Bevans JONATHAN GAGNÉ ING., MBA Ph.D., PMP, BSc (Hons), P.Geo MBA Director Director Director (Val-d’Or, Quebec) Robert C. Bryce, (Sudbury, Ontario) Dr. Jobin-Bevans has (Montreal, Quebec)

  6. Slide 6: Capital Structure

    TSXV: VLI 6 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com CAPITAL STRUCTURE APRIL 2022 (CAD) Shares issued 231,202,485 Warrants 63,898,024 Options 7,050,000 Fully diluted 302,150,509 Market capitalization $27 Million Share price $0.12 52-week low $0.10 52-week high $0.34

  7. Slide 7: Mining Properties

    TSXV: VLI 7 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com MINING PROPERTIES Properties Commodity Ownership Area (ha) Godslith Lithium 100% 5,560* Cadillac Lithium 100% 19,070 Sirmac Lithium 100% 7,750 Dome Lemieux Copper 100% 12,714 Red Brook - Benjamin Copper, Zinc, Silver 100% 5,817 St. Stephens Nickel

  8. Slide 8: Godslith Lithium Project

    TSXV: VLI 8 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com GODSLITH LITHIUM PROJECT MANITOBA, CANADA

  9. Slide 9: Godslith – Excellent Infrastructure

    TSXV: VLI OTCQB: ABEPF 9 FSE: 1AJ2 visionlithium.com GODSLITH – EXCELLENT INFRASTRUCTURE

  10. Slide 10: Godslith Historical Resource

    TSXV: VLI 10 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com GODSLITH HISTORICAL RESOURCE Between 1958-1961, INCO completed 25 wide-spaced drill holes for a total of 9,421 ft (2,871.5 m). In 1986, W.C. Hood Geological Consulting completed an internal report wherein they reported the following resource esti

  11. Slide 11: Godslith Historical Drilling Along 2.3 km of Strike Length

    TSXV: VLI 11 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com GODSLITH HISTORICAL DRILLING ALONG 2.3 KM OF STRIKE LENGTH MULTIPLE HIGH GRADE HITS Highlight Historical Drill Results Include: 14.81m @ 1.59% Li2O 12.16m @ 1.49% Li2O 6.92m @ 1.42% Li2O 9.94m @ 1.63% Li2O 9.88m @ 1.79% Li2O 9.63m @ 1.40% Li2O 9.

  12. Slide 12: Godslith Long Section Using Historical Results

    TSXV: VLI 12 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com GODSLITH LONG SECTION USING HISTORICAL RESULTS LITHIUM MINERALIZATION INTERSECTED AT 243M (800FT) 12.18 M OF 1.49% Li2O OPEN TO DEPTH Source: Geology and Ore Reserves of the Sherman Lithium Property at God’s Lake, Northeastern Manitoba by William

  13. Slide 13: Quebec Lithium Projects

    TSXV: VLI 13 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com QUEBEC LITHIUM PROJECTS QUÉBEC, CANADA Sirmac Chibougamau Val d’Or Cadillac Montreal

  14. Slide 14: Cadillac Lithium Project Geology

    TSXV: VLI 14 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com CADILLAC LITHIUM PROJECT GEOLOGY PROJECT HIGHLIGHTS  332 claims covering 19,070 ha = 190 km2  Multiple untested swarms of dikes  4 known mineralized dikes spaced 100 m apart  Channel sample program completed in 2021 See Vision Lithium Inc., P

  15. Slide 15: Pegmatite B Dike

    TSXV: VLI 15 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com PEGMATITE B DIKE  Large crystals observe throughout the dikes at surface  Historic grab samples returned high grade results of 2.67% and 7.34%Li2O

  16. Slide 16: Cadillac – 2021 Channel Samples

    TSXV: VLI 16 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com CADILLAC – 2021 CHANNEL SAMPLES 1.43% Li2O 2.17% Li2O 3.93% Li2O 3.98% Li2O 2.44% Li2O 1.69% Li2O 3.98% Li2O 2.34% Li2O 2.81% Li2O 1.43% Li2O See Vision Lithium Inc., Press Release (December 30, 2021) for further information on the nature and con

  17. Slide 17: Cadillac Lithium Project

    TSXV: VLI 17 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com CADILLAC LITHIUM PROJECT CHANNEL PROJECT SAMPLES HIGHLIGHTS  Use of LiDAR technology to interpret and/or identify possible pegmatite intrusives for follow- up summer ground proofing and exploration  Over 400 potential pegmatite targets interpre

  18. Slide 18: Cadillac Lithium – Initial Drilling Program Results

    TSXV: VLI 18 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com CADILLAC LITHIUM Lithium dikes and DDH draped on high-resolution LIDAR survey Initial drilling program results From Length Li2O Section DDH # Dike To (m) (m) (m) % 550E CAD-22-04 B 31.80 32.40 0.60 1.15 550E CAD-22-04 B 33.90 34.40 0.50 1.72 550E

  19. Slide 19: Cadillac Lithium – On-going DDH

    TSXV: VLI 19 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com CADILLAC LITHIUM ON-GOING DDH FORAGES EN COURS

  20. Slide 20: Interpretation of Initial Drilling

    TSXV: VLI 20 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com INTERPRETATION OF INITIAL DRILLING  First 11 holes drilled on the main exposed dike over initial strike length of 150 m  The B dike varies from 4 to 14 metres in core length  Spodumene is observed in almost all holes as individual large crysta

  21. Slide 21: Sirmac Lithium Project

    TSXV: VLI 21 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com SIRMAC LITHIUM PROJECT QUÉBEC, CANADA 1 The Sirmac Property consists of 3 The campaign was very successful 155 mining claims (7,750 with multiple intersections over hectares) located about 180km 2% Li2O. One hole intersected NW of Chibougamau, in

  22. Slide 22: Sirmac Claims and Location

    TSXV: VLI 22 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com SIRMAC CLAIMS AND LOCATION East Zone #5 Zone

  23. Slide 23: Sirmac Excellent Infrastructure

    TSXV: VLI 23 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com SIRMAC EXCELLENT INFRASTRUCTURE LODGING, HYDRO NEAR BY, ROAD ACCESS, ETC.

  24. Slide 24: Sirmac Vision Lithium No. 5 Dike

    TSXV: VLI 24 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com SIRMAC VISION LITHIUM No. 5 DIKE CORE L I 2O TA2O5 DDH FROM TO LENGTH (%) (PPM) (M) SIR-12- 2.4 22.2 19.8 1.62 59.7 26-TWIN SIR-12- 13.7 19.7 6.0 1.22 63.6 45-TWIN SIR-12- 30.1 42.1 12.0 1.22 79.2 49-TWIN SIR-12- 4.7 10.7 6.0 1.30 47.2 61-TWIN SI

  25. Slide 25: Sirmac Vision Lithium – East Zone

    TSXV: VLI 25 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com SIRMAC VISION LITHIUM - EAST ZONE  Located about 5 km from No 5 Dike  Zone appears to be several hundred metres in length and appears to host widespread spodumene crystals

  26. Slide 26: Sirmac – East Zone 2018 Channel Sampling

    TSXV: VLI 26 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com SIRMAC - EAST ZONE 2018 CHANNEL SAMPLING FROM TO LENGTH LI2O CHANNELS (M) (M) (M) (%) CL-18-R01 1.0 14.5 13.50 1.85 CL-18-R11 0.0 11.7 11.70 1.58 INCL. 2.6 7.1 4.50 2.37 CL-18-R17 0.7 15.3 14.60 1.23 INCL. 10.9 15.3 4.40 2.24 CL-18-R07 1.8 17.2 1

  27. Slide 27: Vision Lithium Makes 99.99% Pure Lithium Carbonate from Sirmac

    TSXV: VLI 27 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com VISION LITHIUM MAKES 99.99% PURE LITHIUM CARBONATE FROM SIRMAC Lithium Carbonate Diagram of lithium carbonate production Final Grade Specifications Specification Product Grade L i 2C O ≥98.5 99.9* (%) 3 Lithium & Li - 1890000 Impurity Ca 2000 <9

  28. Slide 28: Vision Lithium Exploration Program

    TSXV: VLI 28 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com VISION LITHIUM EXPLORATION PROGRAM $2.5 M funding in place for 2022 Cadillac Project:  Continued DDH on suite of main pegmatites; minimum 3,000 m  Summer 2022: 200 km2 property- wide exploration and sampling  Over 400 pegmatite targets identif

  29. Slide 29: Thank You

    TSXV: VLI 29 OTCQB: ABEPF FSE: 1AJ2 visionlithium.com THANK YOU CONTACT US AT INFO@VISIONLITHIUM.COM

Vision Lithium — Investor Presentation (May 2022) on 6ix