Ero Copper Corp. · TSX:ERO

Ero Copper — Q4 2023 Earnings Presentation

41 slides from Ero Copper's earnings presentation, Mar 8, 2024

  1. Slide 1: Investor Presentation

    Investor Presentation March 2024 | TSX:ERO | NYSE:ERO

  2. Slide 2: Cautionary Statements

    Cautionary Statements | B u s i n e s s O v e r v i e w Caution Regarding Forward Looking Information and Statements This presentation contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” with

  3. Slide 3: Disclaimer

    Disclaimer | B u s i n e s s O v e r v i e w General Scientific and technical information contained in this presentation has been reviewed, verified and approved by Mr. Cid Gonçalves Monteiro Filho, SME RM (04317974), MAIG (No. 8444), FAusIMM (No. 3219148), and Resource Manager of the Company, who i

  4. Slide 4: High-Margin, Growth-Oriented Clean Copper

    High-Margin, Growth-Oriented Clean Copper Brazil-Focused Copper Producer Tucumã Construction With Meaningful Gold Production Pará State Furnas(1) Advanced Stage Pará State Significant Near-Term Growth Doubling Copper Production by 2025 Xavantina Production Mato Grosso State Attractive Long-Term Grow

  5. Slide 5: Track Record of Delivering Growth

    Track Record of Delivering Growth The Company’s consolidated production profile reflects the success of its organic growth investments Copper Equivalent Production (000s of tonnes)(1) 120 100 80 60 40 20 - 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 LOM Plan at IPO (Oct. 2017) Production Profi

  6. Slide 6: Executing on Growth Strategy

    Executing on Growth Strategy The Company recently expanded its growth portfolio with plans to earn a 60% interest in Vale Base Metals’ Furnas Copper Project(1) Near-Term Medium-Term Long-Term (< 2 Years) (2-5 Years) (5+ Years) Caraíba Mill Expansion (✓ Completed in 2023) Project Honeypot New Externa

  7. Slide 7: Poised for Significant EBITDA Expansion

    Poised for Significant EBITDA Expansion Ero is well-positioned due to the expected near-term production from Tucumã and its associated EBITDA contribution Copper Production Growth & EBITDA Margin 60% Ero Copper 55% 2025E EBITDA Margin Antofagasta 50% Capstone Mining Hudbay Minerals Sandfire Resource

  8. Slide 8: Our Operations

    Our Operations

  9. Slide 9: Caraíba: High-Margin Flagship Copper Operation

    Caraíba: High-Margin Flagship Copper Operation Asset Overview ▪ High-grade, high-margin copper operation ▪ Located in Bahia State 90 km SE of Petrolina ▪ Fully integrated mining and processing complex with 40+ year operating history ▪ Two underground mines: Pilar and Vermelhos ▪ One open pit mine: S

  10. Slide 10: New External Shaft Project Site

    New External Shaft Project Site Shaft Headframe Engineering & Admin Permanent Rock & Personnel Winder Building Stage Winder Building ERO COPPER November 2023

  11. Slide 11: Tucumã: Commissioning Underway

    Tucumã: Commissioning Underway Asset Overview ▪ Low capital-intensity open pit copper project with attractive operating margins ▪ Located in Pará State, ~40 km SW of Tucumã ▪ First production expected in H2 2024 ▪ Significant growth potential ▪ Cornerstone position in western Carajás ▪ Robust explor

  12. Slide 12: Tucumã Aerial View

    Tucumã Aerial View ERO COPPER February 2024

  13. Slide 13: Advanced Pre-Stripping Activities

    Advanced Pre-Stripping Activities ERO COPPER January 2024

  14. Slide 14: Flotation Cells

    Flotation Cells ERO COPPER January 2024

  15. Slide 15: Crushing and Screening

    Crushing and Screening ERO COPPER January 2024 15

  16. Slide 16: Xavantina: High-Grade, Low-Cost Gold Operation

    Xavantina: High-Grade, Low-Cost Gold Operation Asset Overview ▪ High-grade, high-margin underground gold mine and processing facility ▪ Located in Mato Grosso State, approximately 18km NW of Nova Xavantina ▪ Amongst the highest-grade gold mines in South America ▪ Current mine life of 6 years (increa

  17. Slide 17: Long-Term Growth

    c O P PER Long-Term Growth

  18. Slide 18: Furnas: Large, Highly Prospective IOCG Project

    Furnas: Large, Highly Prospective IOCG Project The Company recently announced a binding term sheet with Vale Base Metals (VBM) for a 60% interest in the Furnas copper project(1) ▪ Located in the Carajás Mineral Province (Pará, Brazil), ~50 km southeast of VBM’s Salobo operations and ~190 km northeas

  19. Slide 19: Caraíba: Emerging Nickel Sulphide District

    Caraíba: Emerging Nickel Sulphide District District scale potential close to existing infrastructure ▪ ~20km from the Caraíba processing plant ▪ Textures range from disseminated (<10% sulphides) to massive (60-80% sulphides) containing up to 7.09% Ni (7.61% NiEq(1)) ▪ Mineralization outcrops at surf

  20. Slide 20: Financial & Environmental Stewardship

    Financial & Environmental Stewardship

  21. Slide 21: Balance Sheet Well-Positioned to Fund Growth

    Balance Sheet Well-Positioned to Fund Growth Strong balance sheet reinforced by expansion of foreign exchange hedge program to cover a significant portion of operating costs and capital expenditures through the end of 2024 Overview of Current Liquidity Position & Leverage Metrics ($M) Cash & Cash Eq

  22. Slide 22: Leading the Clean Copper Movement

    Leading the Clean Copper Movement Brazil’s global leadership in the use of renewable energy affords Ero a unique competitive advantage as being one of the world’s lowest carbon-intensity copper producers GHG Copper Intensity Curve(1) - 2022 ESG Ratings tCO2e / t Copper equivalent “A” ranking with pe

  23. Slide 23: Guidance & Production Outlook

    Guidance & Production Outlook

  24. Slide 24: 2024 Guidance

    2024 Guidance Caraíba Tucumã Total Copper Xavantina Production 42 - 47 kt Cu 17 - 25 kt Cu 59 – 72 kt Cu 55 - 60 koz Au $550- $650 / oz Operating $1.80 - $2.00 / lb $0.90 - $1.10 / lb $1.50 - $1.75 / lb Au C1 Cash Cost Costs Cu C1 Cash Cost Cu C1 Cash Cost Cu C1 Cash Cost $1,050 - $1,150 / oz Au All

  25. Slide 25: Three-Year Production Outlook

    Three-Year Production Outlook Caraíba Tucumã Total Copper Xavantina 2024 42 – 47 kt Cu 17 – 25 kt Cu 59 – 72 kt Cu 55 – 60 koz Au 2025 42 – 47 kt Cu 53 – 58 kt Cu 95 – 105 kt Cu 55 – 60 koz Au 2026 42 – 47 kt Cu 48 – 53 kt Cu 90- 100 kt Cu 55 – 60 koz Au Note: For more information on the Company’s t

  26. Slide 26: Business Summary

    c O P PER Business Summary

  27. Slide 27: Business Summary

    Business Summary 11 High-Margin, Brazil-Focused Copper Producer 22 Significant Near-Term Production Growth 43 Attractive Long-Term Growth Pipeline 54 Strong Balance Sheet Well-Positioned to Fund Growth 55 Leading Position in Clean Copper Movement ERO COPPER 27

  28. Slide 28: Appendix

    Appendix

  29. Slide 29: Ownership Structure

    Ownership Structure The Company’s board & management team, along with the top 5 institutional shareholders, own over 62% of the Company Shareholder Distribution Blue-Chip Institutional Shareholders Top 5 Institutional Shareholders 9.7% 11.5% T. Rowe Price (all affiliates) 21.1% 11.4% Fidelity (all a

  30. Slide 30: Caraíba: Project Honeypot

    Caraíba: Project Honeypot Success of Project Honeypot demonstrated by addition of 8.1 Mt of ore grading 1.59% copper(1) Project Honeypot Overview Pilar Mine, Long-Section View (looking east) ▪ Focused on recovery of high-grade material left behind by previous operators ▪ Conservative dilution (32%)

  31. Slide 31: Furnas: Geology and Plan Map

    Furnas: Geology and Plan Map Exploration and development efforts will focus on two discrete high- grade zones identified within the overall mineralized body, known as the SE and NW Zones, that extend over a combined strike length of ~5 km NW Zone SE Zone Note: For more information, please refer to t

  32. Slide 32: Furnas: NW & SE Zone Cross Sections

    Furnas: NW & SE Zone Cross Sections Known high-grade mineralization ranges from ~20 to 60 meters in thickness and has been drilled to a vertical depth from surface of ~300 meters NW Zone Cross-Section SE Zone Cross-Section Note: For more information, please refer to the Company’s press release dated

  33. Slide 33: Caraíba: Nickel Sulphide Discovery

    Caraíba: Nickel Sulphide Discovery Select Drill Highlights ▪ VB Zone - VB-17: 16.5 meters at 1.22% Ni, 0.17% Cu and 0.03% Co (1.37% NiEq), including 3.8 meters at 3.60% Ni, 0.22% Cu and 0.09% Co (3.92% NiEq) ▪ Interval includes 1.5 meters of massive-sulphide textures (~80% sulphides) grading 6.59% N

  34. Slide 34: VB Zone: East-West Composite Section

    VB Zone: East-West Composite Section Highlight Intercepts ▪ VB-41: 11.2 meters at 1.86% Ni, 0.26% Cu and 0.05% Co (2.08% NiEq), including 5.0 meters at 3.71% Ni, 0.13% Cu and 0.09% Co (4.00% NiEq) ▪ Interval includes 1.9 meters of massive- sulphide textures grading 7.09% Ni, 0.18% Cu and 0.18% Co (7

  35. Slide 35: LZ Zone: East-West Composite Section

    LZ Zone: East-West Composite Section Highlight Intercepts ▪ LZ-25: 46.1 meters at 0.20% Ni, 0.04% Cu and 0.03% Co (0.28% NiEq), including 2.6 meters at 0.75% Ni, 0.18% Cu and 0.06% Co (0.96% NiEq) ▪ LZ-32: 11.3 meters at 0.43% Ni, 0.10% Cu and 0.02% Co (0.51% NiEq), including 7.0 meters at 0.61% Ni,

  36. Slide 36: Caraíba Operations Reserves & Resources

    Caraíba Operations Reserves & Resources Tonnes Grade Contained Cu (kt) (Cu%) (kt) Mineral Reserves (Underground) Proven 15,402 1.15 177 Probable 19,506 1.53 298 Proven & Probable 34,908 1.36 475 Mineral Resources (Underground) Measured 48,091 1.08 517 Indicated 44,343 1.23 545 Measured & Indicated 9

  37. Slide 37: Xavantina Operations Reserves & Resources

    Xavantina Operations Reserves & Resources Tonnes Grade Contained Au (kt) (gpt Au) (koz) Reserves Proven, Santo Antonio Vein 290 8.57 80.0 Proven, Matinha Vein - - - Total Proven 290 8.57 80.0 Probable, Santo Antonio Vein 1,072 7.80 268.7 Probable, Matinha Vein 144 7.81 36.1 Total Probable 1,215 7.80

  38. Slide 38: Tucumã Project Reserves & Resources

    Tucumã Project Reserves & Resources Tonnes Grade Contained Cu (kt) (Cu%) (kt) Reserves Proven 30,674 0.89 273.2 Probable 12,378 0.67 83.4 Proven & Probable 43,052 0.83 356.6 Mineral Resources (Pit Constrained, Incl. Reserves) Measured Resources (High-Grade) 7,117 2.16 153.6 Indicated Resources (High

  39. Slide 39: Additional Information

    Additional Information Caraíba Operations Mineral Reserves Notes: 1. Effective Date of December 31, 2023 2. Mineral reserves included within stated mineral resources. All figures have been rounded to reflect the relative accuracy of the estimates. Summed amounts may not add due to rounding. 3. Miner

  40. Slide 40: Additional Information (cont.)

    Additional Information (cont.) Tucumã Project Mineral Reserves Notes: 1. Effective Date of August 31, 2021. 2. Stated mineral resources are inclusive of mineral reserves. All figures have been rounded to the relative accuracy of the estimates. Summed amounts may not add due to rounding. High-grade a

  41. Slide 41: Contact Information

    1050-625 Howe St, Vancouver, BC, V6C 2T6 www.erocopper.com Courtney Lynn SVP, Corp. Development, Investor Relations & Sustainability +1.604.335.7504 info@erocopper.com ERO COPPER | 41

Ero Copper — Q4 2023 Earnings Presentation on 6ix