  1. Slide 1: Corporate Update

    TSX: LUN OMX: LUMI Corporate Update November, 2011

  2. Slide 2: Cautionary Statements

    Cautionary Statements Caution Regarding Forward Looking Statements This presentation contains forward-looking statements. These forward-looking statements are not based on historical facts, but rather on current expectations and projections about future events. These forward- looking statements are

  3. Slide 3: Highlights

    Highlights  Copper: Production improving. New high grade stopes commenced late September. Fourth quarter copper production trending well at Neves-Corvo, as planned.  Zinc: Largely in-line. Grinding mill issues resolved early in 4th quarter.  Tenke initial overrun debt now fully repaid: First cash

  4. Slide 4: Copper: Change in Production Q3 '11 vs. Q2 '11

    Change in Production: Q3 ‘11 vs. Q2 ‘11 Tonnes Copper Excluding Tenke 7,982 attributable share Tonnes Tonnes 45 544 28,791 10,367 487 29,000 10,500 152 1,105 262 10,077 28,500 10,000 Lead 28,000 9,500 Zinc 27,404 27,500 9,000 27,000 8,500 26,500 8,000 Prior Qtr Throughput Grade Recovery Actual Prior

  5. Slide 5: Q3/11 Financial Position

    Q3/11 Financial Position • Net cash at Sept. 30, 2011 of $209 million, compared to $126 million at Sept. 30, 2010 and $308 million at June 30, 2011 • Change in net cash during the quarter was impacted by: – $58 million outflow for income tax payments – $19 million outflow for royalty payments – $9.5

  6. Slide 6: Outlook and Operations 2011/2012

    Outlook and Operations 2011/2012 6

  7. Slide 7: 2011 Guidance

    2011 Guidance (contained tonnes) Revised 2011 Guidance Previous 2011 Guidance Tonnes C1 Cost1 Tonnes C1 Cost1 Neves-Corvo Cu 70,000 $1.80 72,000 $1.65 Zn 4,500 6,000 Zinkgruvan Zn 76,000 $0.32 78,000 $0.21 Pb 34,000 36,000 Cu 1,500 3,400 Galmoy Zn 31,000 28,000 (in ore) Pb 8,000 8,000 Total: Wholly-

  8. Slide 8: Neves-Corvo – Q3/11 Results

    Neves-Corvo – Q3/11 Results • Copper prod’n of 15,070 tonnes vs. 13,475 tonnes in Q2/11 • Production from new high grade stopes commenced in late-Sept. Significantly improved production has occurred since then. • C1 Costs of $2.35/lb Cu vs. $2.13/lb in Q2/11 • Announced Lombador Phase 1 Feasibility

  9. Slide 9: Neves-Corvo – Outlook

    Neves-Corvo – Outlook • 2012 preliminary prod’n guidance takes into account future proportions of stockworks vs high grade massive sulphide feed • Several internal projects underway to address changing feed characteristics & improve mine planning • Initial Semblana resource to be announced in Q4/11

  10. Slide 10: Neves-Corvo Growth - Lombador & Semblana

    Neves-Corvo Growth - Lombador & Semblana Main Ramp Shaft Zambujal Graca Corvo Semblana Neves Lombador 10

  11. Slide 11: Neves-Corvo – Multiple New Targets

    Neves-Corvo – Multiple New Targets Semblana and Lombador 3D seismic results 11

  12. Slide 12: Zinkgruvan – Q3/11 Results

    Zinkgruvan – Q3/11 Results • Zinc production of 17,459 tonnes vs. 17,582 tonnes in Q2/11 • C1 costs of $0.13/lb Zn vs. $0.26/lb Zn in Q2/11 • New ramp from surface highly successful. Mine continues to outpace mill capacity • New senior personnel appointments made Location • Sweden 2011 Production •

  13. Slide 13: Zinkgruvan - Outlook

    Zinkgruvan - Outlook • 2012 Preliminary guidance - largely unchanged from this year • Pursuing several opportunities for incremental improvements • Debottlenecking of materials handling system • Increased investment in underground exploration 13

  14. Slide 14: Aguablanca – Update and Outlook

    Aguablanca – Update and Outlook • New mine contractor mobilized in August. Re-instatement of the ramp and pre-stripping progressing well • Restart nickel/copper production in H2/12 with ~€40M investment for restart • Underground study in progress targeting the addition of higher grade material in pa

  15. Slide 15: Tenke – Q3/11 Results

    Tenke – Q3/11 Results • Copper production of 32,249 tonnes vs. 29,891 tonnes in Q2/11 • C1 costs of $1.12/lb Cu vs. $0.94/lb Cu in Q2/11 • Equity income of $17 m vs. $32 m in Q2/11 • Negatively impacted by timing of shipments and lower realized prices • Over-run (EOC) facility fully repaid in Q3 – L

  16. Slide 16: Tenke – Outlook

    Tenke – Outlook • Phase 2 Feasibility Study completed by FCX: • Expansion to ~195ktpa Cu, w/ completion in 2013 • Project capex of ~ $850 m, of which LUN is responsible for 30% (~$250 m) • Investment on critical path activities in progress since January 2011 • LUN portion of expansion capex expected

  17. Slide 17: Phase 2 Expansion Progress

    Phase 2 Expansion Progress Tank House Expansion SX Retaining Wall 17

  18. Slide 18: 2012 Preliminary Production Guidance

    2012 Preliminary Production Guidance (contained tonnes of metal in concentrate) Preliminary 2012 Current 2011 Guidance Forecast Tonnes Tonnes Neves-Corvo Cu 52,500 – 57,000 70,000 Zn 30,000 – 40,000 4,500 Zinkgruvan Zn 75,000 – 81,000 76,000 Pb 34,000 – 39,000 34,000 Cu 2,000 – 3,000 1,500 Aguablanc

  19. Slide 19: 2011 Exploration Programs

    2011 Exploration Programs Exploration spend will increase to $43 m in 2011 (from $24 m - 2010) • Portugal - Semblana drilling continues to intersect thick sections of resource-grade Cu mineralization. Drilling ramped up on new 3D targets. • Spain – Ossa Morena drilling continues - copper /gold targe

  20. Slide 20: Lundin Mining - Summary

    Lundin Mining - Summary • High quality, long life reserves; exploration upside • A stake in Tenke - a unique, world-class copper mine • Strong balance sheet and ongoing cash flows • Fully-funded organic growth profile • High leverage to copper and zinc • Very compelling valuation Neves-Corvo Zinkgru