Boliden Ab · OMXSTO:BOL
Boliden Ab — Investor Day (March 2019)
18 slides from Boliden Ab's investor day presentation, Mar 14, 2019
Slide 1: Aitik presentation at CMD 2019
Aitik presentation at CMD 2019 Hans Jönsson, General Manager
Slide 2: Welcome to Aitik – Agenda March 14, 2019
Welcome to Aitik – Agenda March 14, 2019 08.15 Hans Jönsson, General Manager Boliden Aitik 09.00 Pause and change of clothes 09.30 Guided tour (2 groups) 11.30 Pause and change of clothes 12.00 Lunch including final Q& A session with Group Management 13.15 Departure Aitik mine 14.30 Departure Gälliv
Slide 3: Safety
Safety Production is important, but your health and your life are more important! Boliden CMD 2019 3 2019-03-14
Slide 4: Brief history of Aitik
Brief history of Aitik 1932 The Aitik deposit discovered 1968 Production starts, 2 Mtonnes throughput 1973 6 Mtonnes, 1983: 11 Mtonnes, 1992: 18 Mtonnes 2010 ~6 BSEK investment, 36 Mtonnes 2018 860 MSEK, new surface crusher Aitik ore profile 2020 45 Mtonnes 4 Boliden CMD 2019 Boliden CMD 2019 4 2019
Slide 5: Production overview at Aitik
Production overview at Aitik Boliden CMD 2019 5 2019-03-14
Slide 6: Aitik from above
Aitik from above 7,000 ha Boliden CMD 2019 6 2019-03-14
Slide 7: Europe's largest and the world's most productive open pit copper mine
Europe’s largest and the world’s most productive open pit copper mine Copper mine productivity 2018 Open pit mines with concentrator Easily accessible ore 35 Favourable stripping ratio 1:1 30 Large scale operations Aitik Efficient logistics Milled ore tonnes/manhour 25 Committed and compet
Slide 8: Aitik – Increased productivity
Aitik – Increased productivity Truck trolley Remote controlled/autonomous drill rigs New Aitik electric trolley New Haul trucks Mineral reserves have increased 80% since 2008 despite the fact that yearly throughput has increased 100%. Electric test lane ~700 meters and is expected to save 830 m3
Slide 9: Aitik – EBIT and throughput since 2009
Aitik – EBIT and throughput since 2009 Aitik - Milled production (Ktonnes) Aitik- EBIT (MSEK) 50 000 3 000 40 000 2 500 2 000 30 000 1 500 20 000 1 000 10 000 500 0 0 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Boliden CMD 2019 9 2019-03-14
Slide 10: Aitik Opex/tonne since 2009
Aitik Opex/ tonne since 2009 Aitik - Operating costs (excl. depr.), SEK/milled tonne 70 60 50 40 30 20 10 0 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Boliden CMD 2019 10 2019-03-14
Slide 11: Aitik – Pushback scenarios
Aitik – Pushback scenarios 11 Boliden CMD 2019 Boliden CMD 2019 11 2019-03-14
Slide 12: New crusher station (KiD2)
Aitik - New crusher station (KiD2)* KiD2 production from start 2 500 2 000 1 500 Ktonnes 1 000 500 0 Apr May Jun Jul Aug Sep Oct Nov Dec *KiD2 = Surface crusher 2 Boliden CMD 2019 12 2019-03-14
Slide 13: Aitik - Pebbles crushing
Aitik - Pebbles crushing Pebbles crushing will be installed in connection to the two autogenous mills Will increase capacity when low grindability Commissioning during Q2 2019 Boliden CMD 2019 13 2019-03-14
Slide 14: Liikavaara
Liikavaara Short facts “Low-grade” Cu-Au mineralisation, approx. 3 km east of Aitik Discovered by Boliden in 1930´s Conceptual study in 2009-10, approx. 40 Mtonnes at 0.28% Cu Included in Aitik LoMP, 2023-30 Status Feasibility 2018 indicate 58 Mtonnes at 0.26% Cu ‒ Satellite to Aitik pit ‒
Slide 15: Nautanen
Nautanen Short facts Cu-Au mineralisation, approx. 15 km NW of Aitik Discovered by Boliden in 2011 ”High grade” (1.5% Cu) known from ca 200 m to 600 m below surface, still open Mineral Resource ‒ Indicated: 8.2 Mtonnes at 1.7% Cu, 0.9 g/tonnes Au, 5 g/tonnes Ag ‒ Inferred: 7.5 Mtonnes at 1.5
Slide 16: Aitik from an EHS perspective
Aitik from an EHS perspective Aitik mine - Emissions of copper per year 5000 4000 Kg/year 3000 2000 1000 0 1979 1984 1989 1994 1999 2004 2009 2014 Prioritised areas of work • Safety culture • Water management and dam safety • Reducing emissions to water and air • Energy savings • Decommissioning and
Slide 17: At Boliden, safety is number one
At Boliden, safety is number one Keep your phone/camera in your pocket or bag until photo opportunity is announced Ongoing production, pay attention Heavy traffic Listen to and follow the instructions given to you We are all equally responsible for the safety of ourselves and each other Bo
Slide 18: Disclaimer
Disclaimer This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden does not undertake any obligation to correct or update the information or any statements made therein. Certain statements in this presentation are forward-looking and are