Tertiary Minerals plc · LSE:TYM

Tertiary Minerals — Beaufort Investor Evening 2014

15 slides from Tertiary Minerals's conference presentation, Apr 30, 2014

  1. Slide 1: Building a Strategic Position in the Fluorspar Sector

    Building a Strategic Position in the Fluorspar Sector Company Presentation April 30th 2014 1

  2. Slide 2: Disclaimer

    Disclaimer The content of information contained in these slides and the accompanying verbal presentation (together, the “Presentation”) has not been approved by an authorised person within the meaning of the Financial Services and Markets Act 2000 (“FSMA”). Reliance upon this Presentation for the pu

  3. Slide 3: Company Aims, Strategy and Business Plan

    Company Aims, Strategy and Business Plan The Opportunity • Fluorspar is an essential raw material in the chemical, steel and aluminium industries and in a growing number of high-tech green technologies and pharmaceutical applications • Fluorspar has a growing economic and strategic importance; ranke

  4. Slide 4: Fluorspar Market

    Fluorspar Market The Fluorine Supply Chain • Fluorspar is the commercial name for concentrates of the mineral Fluorite, CaF2 • Fluorite is the main industrial source of Fluorine, F Fluorocarbons - 2.16 Mt/year e.g. refrigerants Fluoropolymers Hydrogen Fluoride HF e.g. lithium batteries 40% - 2.6 Mt/

  5. Slide 5: Fluorspar Market Dynamics

    Fluorspar Market Dynamics • China produces >50% of the worlds fluorspar China Acidspar Export vs Internal Consumption 2005 - 2012 (t) • The price of acid-spar has increased >3 fold since 2000 2500000 • Chinese exports have declined substantially 2000000 since 2000 • China may become a net importer i

  6. Slide 6: Storuman Fluorspar Project

    Storuman Fluorspar Project Excellent Location & Infrastructure • Adjacent to the main E12 highway • Storuman town and new bulk rail terminal – 25 km • Road and rail linked to Umeå Port – 240 km Umeå Lars Lind 6

  7. Slide 7: Storuman Fluorspar Project: Positive Scoping Study

    Storuman Fluorspar Project Positive Scoping Study • Completed by Scott Wilson • Mineral Resource increased post • Process flow sheet completed by Delta Minerals Scoping Study • Robust economics • Bulk rail terminal constructed post Scoping Study Base Case Tonnage/grade in pit (non- 18mt @12.3% Fluor

  8. Slide 8: Storuman Fluorspar Project: Drilling and Mineral Resource Estimate

    Storuman Fluorspar Project Drilling (2010) & JORC Mineral Resource Estimate (SRK 2011) • 46 diamond core drill holes • Waste:ore strip ratio reduced • 28% increase in resource compared with Scoping Study • 2.2t:1t to 0.8t:1t Classification Million Tonnes (Mt) Fluorspar (CaF2%) Indicated 25 10.28 Inf

  9. Slide 9: Storuman Fluorspar Project: Milestones

    Storuman Fluorspar Project 2013 Milestones • Critical two year Environmental Baseline Studies – completed • Reindeer Husbandry Impact Analysis – completed • Preliminary Feasibility Study (PFS) metallurgical testwork - nearing completion • Preparation of Exploitation (Mine) Permit application – parti

  10. Slide 10: MB Fluorspar Project

    MB Fluorspar Project Nevada - Most Favourable Mining Jurisdiction in the USA • Located 14km SW of Eureka, Eureka County, Nevada • Trans-national road and rail links, rail 161 km from the project location • 780 km to port of San Francisco • Road access to and over property • Government land – no spec

  11. Slide 11: MB Fluorspar Project: 2014 Milestones

    MB Fluorspar Project 2014 Milestones • Maiden JORC Compliant Mineral Resource Estimate – April 2014 Million Tonnes Fluorspar Classification (Mt) (CaF2%) Indicated (8% CaF2 cut-off) 8.9 10.3 Inferred (8% CaF2 cut-off) 29.5 10.4 • Metallurgical Testwork • Further Drilling 11

  12. Slide 12: Lassedalen Fluorspar Project

    Lassedalen Fluorspar Project Excellent Location & Infrastructure • 500m from highway E134 & Railway • 6km from famous silver mining town of Kongsberg • 50km from Port of Drammen • 80km SW of City of Oslo 12

  13. Slide 13: Lassedalen Fluorspar Project: Milestones Achieved

    Lassedalen Fluorspar Project Milestones Achieved • JORC Mineral Resource Estimate (SRK Consulting) – 2012 • Re-logged and sampled 3.5 km of drill core from 23 of the 28 diamond holes drilled in the 1970’s Classification Million Tonnes (Mt) Fluorspar (CaF2%) Inferred 4 24.6 • Scoping Study (Wardell A

  14. Slide 14: Investment Case

    Investment Case • Broker research suggest shares are undervalued BROKER RESEARCH - Price Targets • Tertiary Minerals plc is the only UK public traded Cantor Fitzgerald 18p per share 16 April company offering an exciting exposure to looming Europe 2014 fluorspar market shortage Beaufort Securities 24

  15. Slide 15: Thank You For Your Time and Support

    Building a Strategic Position in the Fluorspar Sector THANK YOU FOR YOUR TIME AND SUPPORT The full Company presentation is available on our website: www.tertiaryminerals.com For further information please contact: Nominated Adviser & Joint Broker Joint Broker Public Relations Tertiary Minerals plc C

Tertiary Minerals — Beaufort Investor Evening 2014 on 6ix