Merger Mines Corp. · OTC:MERG

Merger Mines — Investor Presentation (February 2018)

41 slides from Merger Mines's investor presentation, February 2018

  1. Slide 1: Lasers, the Future of Mining

    ™ presents: LASERS, THE FUTURE OF MINING • An Innovative New Method for Mining • Utilizing High Optical Power Lasers to Mine for Precious Metals U.S. & INTL PATENTS PENDING and have now been Printed Revised February, 2018 1 © Copyright Nov, 2015, Merger Mines Corp

  2. Slide 2: The Progression of Mining

    The Progression of Mining Since the beginning of mankind, there has been mining. Man searched the hillsides for obsidian for making points and the stream beds for rocks suitable for hammers or clubs. King Solomon, of Biblical times, had iron, gold, silver and turquoise mines. His miners used moil, h

  3. Slide 3: Forward Looking and Cautionary Statements

    Disclosure Regarding TM Forward Looking and Cautionary Statements This presentation contains "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. All statements, other than statements of historical fact,

  4. Slide 4: Welcome to our Presentation

    Welcome to our Presentation Questions encouraged at anytime © Copyright Nov, 2016, Merger Mines Corp 4

  5. Slide 5: Lasers- The Future of Mining

    Lasers- The Future of Mining Modern technology and innovative thinking have combined to provide a creative new way to mine underground. By utilizing lasers for spalling (breaking) rock underground, lasers will eventually eliminate conventional methods of drilling and blasting. Preliminary test work

  6. Slide 6: Our Patent has been Published by the U.S. and Intl Patent Agencies

    Our Patent has been Published by the U.S. and Intl Patent Agencies TM © Copyright June 2017, Merger Mines Corp 6

  7. Slide 7: Our Target Application for the Narrow Vein Laser Miner

    Our Target Application for the TM Narrow Vein Laser Miner There are numerous mines with narrow vein structures in North America alone, unworkable because of the cost of conventional mining operations. This is our solution! The Merger Miner The ideal narrow vein Narrow Vein Concept Vehicle © Copyrigh

  8. Slide 8: Our In House Technical Staff

    Our “In House” Technical Staff TM Gary Mladjan, Opto-Mechanical Engineer, Vice President of Engineering and Technology, Director Mr. Mladjan, has over fifty-five years of opto-mechanical engineering experience with various defense contractors, most recently with Raytheon Corporation. Mr. Mladjan was

  9. Slide 9: Our Outside Consultants

    Our Outside Consultants TM Dan Nieuwsma, Consulting Laser Physicist Mr. Nieuwsma has over thirty-six years of experience leading laser system concept, research, and product design for rugged environments and production implementation. Dan was presented with Raytheon's corporate "Excellence in Techno

  10. Slide 10: Our Operational Partner

    Our Operational Partner TM We have a partnership agreement with Groundhog Mining and Milling, LLC, to act as our Merger Miner System Trainer and as a Contract Operator for all our underground operations In conjunction with technical support From Frencken America and IPG Photonics. www.groundhogminin

  11. Slide 11: A 1972 Publication Concerning Thermal Fragmentation

    A 1972 Publication Concerning TM Thermal Fragmentation Thermal Fracturing of Hard Rock P. J. Lauriello and Y. Chen [+] Author and Article Information J. Appl. Mech 40(4), 909-914 (Dec 01, 1973) (6 pages) doi:10.1115/1.3423186 History: Received August 01, 1972; Revised January 01, 1973; Online July 1

  12. Slide 12: 2004 Publication, our inspiration for Thermal Fragmentation

    2004 Publication, our inspiration TM for Thermal Fragmentation Proceedings of the 23rd International Congress on Applications of Lasers and Electro-Optics 2004 Laser Spallation of Rocks for Oil Well Drilling Zhiyue Xu 1 Claude B. Reed 1, Richard Parker 2, Ramona Graves 3 1 Argonne National Laborator

  13. Slide 13: 2014 Study on the Thermal Fragmentation or Spalling Process

    2014 Study on the Thermal Fragmentation or Spalling Process TM PROCEEDINGS, Thirty-Ninth Workshop on Geothermal Reservoir Engineering Stanford University, Stanford, California, February 24-26, 2014 SGP-TR-2021 The Geo-materials Fracture by Thermal Process Muhammad YASEEN 1, Jaouad ZEMMOURI 2 and Isa

  14. Slide 14: Laboratory Test Unit (Phase I)

    Laboratory Test Unit (Phase I) TM Operate a working model in a laboratory scenario to: Characterize operating parameters w/Single Fiber Laser and Scan Head • Determine Fiber Laser Power necessary for Thermal Fracturing (1 to 7 kW) (using only a 30 foot fiber optic cable) • Determine that Irradiation

  15. Slide 15: Merger Miner Laboratory Test Unit

    Merger Miner Laboratory Test Unit TM Scan Head in Test Design Configuration NOTE: THE INTERIOR COMPONENTS OF THE SCAN HEAD, WHILE CAE MODELED AND ENGINEERING DOCUMENTATION NEAR COMPLETION, ARE PROPRIETARY AND ARE NOT DISCLOSED AUXILLARY ELECTRONICS ENCLOSURE COMPRESSED AIR COUPLER FIBER OPTIC COUPLE

  16. Slide 16: Laboratory Test Scan Head (Phase I)

    Laboratory Test Scan Head (Phase I) TM (in Test Design Configuration) NOTE: THE INTERIOR COMPONENTS OF THE SCAN HEAD, WHILE CAE MODELED AND ENGINEERING DOCUMENTATION NEAR COMPLETION, ARE PROPRIETARY AND ARE NOT DISCLOSED STATIONARY BODY AUXILLARY ELECTRONICS POST COOLING ENCLOSURE AIR OUTLET SAPHIRE

  17. Slide 17: Laboratory Test Unit (Phase I)

    Laboratory Test Unit (Phase I) TM Scan Head in Test Design Configuration THE LASER BEAM IS IN THAT PART OF THE SPECTRUM THAT IS NOT VISIBLE TO THE EYE GEOLOGIC MATERIAL DEPICTION OF LASER BEAM (FROM VARIOUS AUXILIARY ELECTRONICS SOURCES) ENCLOSURE ROTATING HEAD SCAN HEAD BODY ELEVATABLE FIBER OPTIC

  18. Slide 18: Working Model Goals

    Working Model Goals TM Initial Working Model will is being designed for use in narrow vein mining. • Step One: Determine basic laser power and scan patterns needed (Test Unit) • Parameters expected to be around 0.001 second (1 millisecond) dwell time on targeted area at a power level of 1 kW/cm2 • S

  19. Slide 19: Potential Cost Savings

    Potential Cost Savings TM • Eliminates Blasting in the Stoping Area (Stope– Underground excavation made by removing ore from surrounding rock) • Improved Health and Safety • Miners not working at face (Face – The exposed area of a rock from which ore is being extracted) • Reduced Manpower • A two-ma

  20. Slide 20: Characterization Unit Scan Head (Phase II)

    Characterization Unit Scan Head (Phase II) TM (in Current Design Configuration) THE LASER BEAM IS IN THAT PART OF THE SPECTRUM THAT IS NOT VISIBLE TO THE EYE NOTE: THE INTERIOR COMPONENTS OF THE SCAN HEAD, WHILE CAE MODELED AND ENGINEERING DOCUMENTATION NEAR COMPLETION, ARE PROPRIETARY AND ARE NOT D

  21. Slide 21: Merger Miner Characterization Unit (Phase II)

    Merger Miner Characterization Unit (Phase II) TM Insertion Tube THE LASER BEAM IS IN THAT PART OF THE SPECTRUM THAT IS NOT VISIBLE TO THE EYE This CAE Model was created using © Copyright Nov, 2015, Merger Mines Corp 21

  22. Slide 22: Merger Miner Characterization Unit (Phase II)

    Merger Miner Characterization Unit (Phase II) TM Scan Head Insertion System THE LASER BEAM IS IN THAT PART OF THE SPECTRUM THAT IS NOT VISIBLE TO THE EYE CLOSED CELL FOAM FACE SEAL LASER EMERGENCY FIBER OPTIC CABLE SHUT-OFF INSERTION TUBE AND COUPLER (INSIDE TUBE) LASER SAFETY INTERLOCKS LASER SAFET

  23. Slide 23: Merger Miner Characterization Unit (Phase II)

    Merger Miner Characterization Unit (Phase II) TM Scan Head and Laser FIBER OPTIC FIBER OPTIC CABLE CABLE DRUM INPUT CONNECTOR IPG FIBER OPTIC CABLE PHOTONICS YTTERBIUM DOPED FIBER INSERTION TUBE LASER. THIS IS A CLASS IV LASER SHOCK ISOLATION MOUNT (EASH CORNER) 30“ EXTENSION TUBE PINTLE HOOK (ALLOW

  24. Slide 24: Merger Miner Characterization Unit (Phase II)

    Merger Miner Characterization Unit (Phase II) TM System Control DELL RUGGEDIZED VIDEO OBSERVATION LASER OPERATION DISPLAY CONTROL COMPUTER DELL RUGGEDIZED SCAN HEAD AND INSERTION CONTROL COMPUTER CONTROL CABINET POWER DISTRIBUTION PANEL TOW BAR CABLE SUPPORT REMOTE OPERATOR POSITION MODIFIED TRANSPO

  25. Slide 25: Merger Miner Characterization Unit (Phase II)

    Merger Miner Characterization Unit (Phase II) TM Optional Material Collection System ATLAS COPCO GA37 + TANKLESS AIR COMPRESSOR VACTAGON (102 PSIG AT 243 FT3/MIN MAX) AIR POWERED VACUUM HOSE VACUUM SYSTEM COMPRESSED AIR HOSE MODIFIED TRANSPORT CART MODIFIED TRANSPORT CART MATERIAL COLLECTION DRUM CA

  26. Slide 26: Merger Miner Characterization Unit (Phase II)

    Merger Miner Characterization Unit (Phase II) TM Optional Electrical Power System GENERAC FUEL TRANSFER HOSE LPG SUPPLY ELECTRICAL POWER (120 GAL) GENERATOR (25kW) MODIFIED MODIFIED CABLE SUPPORT TRANPORT CART TRANSPORT CART This is a CAE Model created using © Copyright Nov, 2015, Merger Mines Corp

  27. Slide 27: Goals for Phase II

    Goals for Phase II TM Operate a working model in a simulated production scenario to: • Characterize operating parameters w/Single Fiber Laser and Scan Head • Determine that Particle Size for Ore and Waste 0.5 cm3 • Determine that Irradiation Time is near 1ms • Determine that Optical Power is near 1k

  28. Slide 28: Calculated Production Rate

    Calculated Production Rate TM With a 2 kilowatt Fiber Laser Parameters Based on Bench Test Results in the 1972 Study using Barre Granite 2.7 Tons per hour per Scan Head Basis: • < 1 kW/cm2 optical power • > 1 millisecond dwell time • ~ 0.5 cm3 particle volume • 2.65 g/cm3 average density • Test Resu

  29. Slide 29: Merger Miner Scan Head (Phase III)

    Merger Miner Scan Head (Phase III) TM (in Current Design Configuration) NOTE: THE INTERIOR COMPONENTS OF THE SCAN HEAD, WHILE CAE MODELED AND ENGINEERING DOCUMENTATION NEAR COMPLETION, ARE PROPRIETARY AND ARE NOT DISCLOSED FIBER OPTIC CABLE AND COUPLER (BEHIND FLANGE) ROTATING HEAD COOLING AIR PORTS

  30. Slide 30: Merger Miner – Phase III

    Merger Miner – Phase III TM THIS UNIT IS IN THE EARLY STAGE OF DEVELOPMENT 30O OFFSET HORIZONTAL VERTICAL SCAN HEAD PIVOT POINT PIVOT POINT 36.00 27.00 MINIMUM TRACK-O MINING WIDTH WIDTH 36.00 23.38 9.00 60.62 TRACK-O LENGTH HORIZONTAL PIVOT POINT 30O OFFSET © Copyright Mar, 2017, Merger Mines Corp

  31. Slide 31: Merger Miner – Phase III

    Merger Miner – Phase III TM THIS UNIT IS IN THE EARLY STAGE OF DEVELOPMENT HORIZONTAL VERTICAL SCAN HEAD PIVOT POINT PIVOT POINT 36.00 MINIMUM 27.00 MINING TRACK-O WIDTH WIDTH 36.00 23.38 9.00 60.62 TRACK-O LENGTH HORIZONTAL PIVOT POINT 72.00 MINIMUM 12 INCHES MINING TO MINING FACE HEIGHT +/- 5O OFF

  32. Slide 32: The Merger Miner on a Tracked Vehicle (Phase III)

    The Merger Miner on TM a Tracked Vehicle (Phase III) CABINET AIR INLET LASER OPERATIONAL AND FILTER SAFETY WARNING LAMP INFLATABLE SCATTER SHIELD AUXILLIARY OPERATIONAL VIDEO DISPLAY SCAN HEAD AUXILLIARY CONTROL PANEL AND KEYBOARD SYSTEM OPERATIONAL CONNECTIONS ROBOTIC ARM HORIZONTAL MOVEX INNOVATIO

  33. Slide 33: Merger Miner – Phase III

    Merger Miner – Phase III TM THIS UNIT IS IN THE EARLY STAGE OF DEVELOPMENT VIDEO CAMERA AND LED ILLUMINATION ACCESS PANEL ROBOTIC ARM LASER OPERATING SCAN HEAD ELEVATION WARNING LIGHT CRADLE ROTATING SCAN HEAD SYSTEM LASER SAFETY APERTURE WARNING LABEL FACE COOLING AIR VENT VEHICLE OPERATIONAL SPALL

  34. Slide 34: Commercial Tracked Vehicle

    Commercial Tracked Vehicle TM the potential Prime Mover for the Merger Miner 60.62 inches Track-O Heavy Duty Characteristics: Size: 60.62 Lg. X 27 Wd. X 13 .62 Ht. Ground Clearance: 2.75 Weight: 1110 Lbs. Load Capacity, Flat: 6000 Lbs. Load Capacity, 30o Incline: 2500 Lbs. Max Speed, Flat Surface: 6

  35. Slide 35: The Merger Miner, Phase IV Concept

    The Merger Miner, Phase IV Concept ™ Four Head Array in an Eight Foot Wide Stope Configuration LASER, COMPRESSED AIR ARRAY HOIST AND ELECTRONIC CABLES CABLE CENTERING WHEEL CENTERING WHEEL OPTIONAL ARTICULATED XRF SCOPE LIFT FRAME DIRECTIONAL COMPRESSED AIR COOLING VENT SCAN HEAD ILLUMINATION MODULE

  36. Slide 36: Conceptual Merger Miner Transport Vehicle

    Conceptual Merger Miner Transport Vehicle TM In an 8 Foot Wide Mining Width following a Narrow Vein EQUIPMENT SAFETY ENCLOSURE FIBER LASERS POWER DISTRIBUTION PANEL LIFT CABLE CLIMATE CONTROLLED WINCH OPERATORS CABIN COMPRESSED AIR DRYER AND FILTER SERVICE TUBE WINCH COMPRESSED AIR TANK SERVICE TUBE

  37. Slide 37: Conceptual Use of the Merger Miner Array

    Conceptual Use of the Merger Miner Array TM Between Drifts following a Narrow Vein Typical Stope Block- 8 Foot Mining Width Level Data Used: Vein Width 1.85 ft. Au 0.93 oz./ton Ag 4.70 oz./ton Pb 1.0 %/ton 3,552 Tons of Ore Zn 0.4 %/ton 200 ft. per block 8,852 Tons of Waste 120 ft. Level In the cost

  38. Slide 38: Projected Cost Comparisons (Phase IV)

    Projected Cost Comparisons (Phase IV) TM Conventional Mining vs Laser Mining with the Merger Miner Conventional Mining (Modified Cut and Fill) Ore mined in each stope block: 3,552 tons Drill & Blast 8,852 tons waste for backfill. Cost to mine out stope block: 12,404 tons X $57.47 (CPT*-Labor and Con

  39. Slide 39: Merger Miner Operational Safety

    Merger Miner Operational Safety TM Overseen by MSHA – Mine Safety and Health Administration; the federal agency which regulates all mine health and safety. Laser Products are Defined in: Code of Federal Regulations, Title 21, Chapter I, Subchapter J, Part 1040 “Performance Standards for Light-Emitti

  40. Slide 40: Our Corporate Structure

    Our Corporate Structure TM Board of Directors Lex Smith President Comptroller Don Rolfe Lex Smith Scott Beggs Gary Mladjan Melanie Farrand Scott Beggs Secretary/ Delbert Hunt Contract Treasurer Property Legal Staff Melanie Farrand Acquisition Don Rolfe Contract Marketing Vice President, Underground

  41. Slide 41: For more information or involvement

    For more information or involvement ™ 3714 W. Industrial Loop Coeur d’Alene, ID 83815 (208) 664-8801 See our Booklet Contact us at: info@mergerminescorp.com. Visit our website at: www.mergerminescorp.com. On the Exchange: Prepared by: OTC: MERG Gary Mladjan Vice President, Engineering and Technology

Merger Mines — Investor Presentation (February 2018) on 6ix