Mitre Mining Corporation Ltd

Mitre Mining — PDAC 2024

31 slides from Mitre Mining's conference presentation, Mar 5, 2024

  1. Slide 1: High-Grade Silver and Gold

    5 March 2024 PDAC Investor Presentation High-Grade Silver and Gold A high-grade Chilean silver-gold mining project positioned for growth that can be fast tracked into production  High-Grade Inferred and Indicated Resource base of 50Moz @ 311g/t AgEq  A$150M Existing Infrastructure including proces

  2. Slide 2: Disclaimers

    DISCLAIMERS This presentation has been prepared by Mitre Mining Corporation Limited (ACN 645 578 454) (Company) based on information from its own JORC CODE and third party sources and is not a disclosure document. No party other than the Company has authorised or caused the issue, lodgement, submiss

  3. Slide 3: Investment Highlights: Quality mid-tier scale Silver-Gold project

    INVESTMENT HIGHLIGHTS Quality mid-tier scale Silver-Gold project Upside Resources and Mines Infrastructure Significant Resource Growth Shallow high-grade Silver-Gold with multiple A$150M of infrastructure & investment in place mining fronts  Resource drilling commenced  Processing infrastructure 

  4. Slide 4: Corporate Overview

    CORPORATE OVERVIEW Mitre Board and Management invested A$1 million in recent placement CURRENT SHARE MARKET CASH CURRENT PRICE1 CAPITALISATION1 POSITION2 ENTERPRISE VALUE1 CAPITAL STRUCTURE A$0.27 ~A$24M A$4.1M A$20M ASX Code MMC Shares on issue 89.2M Options & performance rights3 35.9M Top 20 Share

  5. Slide 5: Board and Management

    BOARD AND MANAGEMENT Proven leadership team in the resource sector Maddison Cramer Company Secretary Cygnus Metals, Firefly Metals, Midas Minerals Sue Field Financial Controller Alicanto Minerals, Riedel Resources Patrick Gowans Ray Shorrocks Carl Travaglini Tim Laneyrie Damien Koerber Non-Exec Chai

  6. Slide 6: Chile – A World Class Endowment

    CHILE – A WORLD CLASS ENDOWMENT PREMIER 30Moz GOLD EQUIVALENT RESOURCES AND RESERVES Location of the Cerro Bayo Project in the Deseado Massif and Historic Production *Significant historic and operating mines with approximate past production-remaining resources

  7. Slide 7: Silver – Critical in Everyday Life

    SILVER – CRITICAL IN EVERYDAY LIFE 1600 800 Anticipated 1400 700 US demand only 1200 600 1000 500 Moz SIlver 800 Moz Silver 400 600 300 400 Global Silver Demand in Solar Industry 200 200 0 100 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023E 0 Mine (Moz) Recycling (Moz) Demand (Moz) 2014 2015 2016

  8. Slide 8: Cerro Bayo – A Premier Mining District

    CERRO BAYO – A PREMIER MINING DISTRICT • Cerro Bayo project represents ~300km2 of highly prospective tenure • District to date has yielded ~140Moz AgEq: • ~91Moz AgEq of combined silver and gold production between 1995-2017 (~0.65Moz Au and 45Moz Ag) at 4 ̴ 50 g/t AgEq • A current JORC Resource of 5

  9. Slide 9: High Grade Resource - Taitao

    HIGH GRADE RESOURCE - TAITAO • JORC Inferred Resource of 3.8Mt @ 206g/t AgEq for 24.7Moz AgEq • Open pit broad breccia target zone with high grade underground feeder veins • Resource from surface with open pit average depth of 45m • Optimized pit crest within 100m of processing facility • System plu

  10. Slide 10: Delia SE – High Grade and Accessible

    DELIA SE – High Grade and Accessible • Vein width typically up to 5.2m • Current Resource OPEN to the south and down plunge • Resource contained in top 300m • Number of high-grade veins parallel and oblique to Delia not in current resource are to be evaluated progressively with further resource upda

  11. Slide 11: Coyita Vein – Rapid Value Growth

    COYITA VEIN – Rapid Value Growth • High-grade mineralisation OPEN • Exceptional grades underpin a high value resource • Coyita veins over 1.3km of strike • Access to Coyita Nth vein via the established Coyita Decline. • Coyita Sth can be rapidly accessed by the development of a 650m 1:7 southern ext

  12. Slide 12: Drilling Commenced – High Grade Prospects

    Drilling Commenced – High Grade Prospects Rapid Resource Growth • Mitre Mining’s maiden drilling campaign strategy is aimed at growing the Resources through drilling at high priority brownfields targets within a 3km radius of the processing plant. • The first walk up drill targets include Pegaso 7 a

  13. Slide 13: Laguna Verde District – 50Moz AgEq Resource and growing

    Laguna Verde District – 50Moz AgEq Resource and growing Taitao South multiple high-grade veins rock chips and channels: • 34,421 g/t Ag & 169.2 g/t Au • 22,020 g/t Ag & 112 g/t Au • 3,663 g/t Ag & 29.8 g/t Au • 1,315 g/t Ag & 1.9 g/t Au • 2,657 g/t Ag & 4.6 g/t Au Pegaso 7 veins rock chips: • 16,547

  14. Slide 14: Cerro Bayo District – Untapped potential

    Cerro Bayo District – Untapped potential Historic Production of ~48.3Moz AgEq Brillantes high-grade vein rock chips: • 1,311 g/t Ag & 5.6 g/t Au • 704 g/t Ag & 4.2 g/t Au • 556 g/t Ag & 18.2 g/t Au • 56 g/t Ag & 0.2 g/t Au, 1.4% Cu, 53.1% Pb Raul West vein high-grade rock chips: • 2,090 g/t Ag & 17.

  15. Slide 15: Huge Regional Upside – Cerro Diablo and Los Domos

    HUGE REGIONAL UPSIDE – CERRO DIABLO AND LOS DOMOS • Los Domos geological model related to HOD MADEN style • Large Permit with high priority walk up drill targets Hybrid mineralization • Polymetallic intermediate sulphidation style deposit • Exception high grade surface rock chips including: with onl

  16. Slide 16: Ready to Go A$150M Mine Infrastructure

    READY TO GO A$150M MINE INFRASTRUCTURE Situated 20km by road west of the mining town of Chile Chico (population 5,000) CERRO BAYO MINE COMPLEX PROCESSING FACILITY SITE INFRASTRUCTURE MINING EQUIPMENT • 2 Mining districts • 1,650tpd floatation plant in excellent condition • 1,600m2 mine administratio

  17. Slide 17: Potential Re-rate Through Rapid Growth and Near-Term Production

    POTENTIAL RE-RATE THROUGH RAPID GROWTH AND NEAR-TERM PRODUCTION EXPLORERS/DEVELOPERS PRODUCERS 8.00 1,200.0 $1,600 EV/OZ $1,422 7.00 $1,400 Global Resoruce GRade (Ageq g/t) MI&I Grade 1,000.0 $1,200 6.00 Comparable high-grade Explorers Axis EV/Oz Ageq (A$) EV/oz ~ A$1.50 800.0 $1,000 EV (A$m) 5.00 $

  18. Slide 18: A World Class Deposit in the Making

    Silver Equivilant (Moz) 0.0 50.0 100.0 150.0 200.0 250.0 Immaculda (HOC) La Coipita (ABRA) San Dimas (FR) Refer to Appendix B for comparative data. Dolly Varden (DV) Las Chispas (SIL) through drilling Azuca (HOC) Terronera (EDV) Rapid low-cost resource growth Pallancata (HOC) Zgounder (AYA) Santa El

  19. Slide 19: Catalyst Rich - 12 Months Newsflow

    CATALYST RICH - 12 MONTHS NEWSFLOW First 12 months of works is to create value with the drill rig Multiple high-grade silver and gold targets with rapid low-cost and high-grade resource growth. Please note that timeframes are indicative and may be subject to change.

  20. Slide 20: Cerro Bayo Silver-Gold Project: A Transformational Acquisition

    CERRO BAYO SILVER-GOLD PROJECT A TRANSFORMATIONAL ACQUISITION Highlights ‣ A significant ready-to-go silver-gold mine in the Deseado Massif, Chile ‣ A world class mining province host to Newmont, Yamana, Anglo Ashanti, McEwen Mining ‣ Rapid and immediate resource growth potential – Drilling to start

  21. Slide 21: Appendices

    APPENDICES • Appendix A - Infrastructure Overview, Resource Overview and Geology Summary • Appendix B - Silver-Gold Deposit/Company Comparisons • Appendix C - Silver Statistics • Appendix D - Mineral Resources

  22. Slide 22: Appendix A – Infrastructure Overview: 500ktpa Float Plant & Power

    APPENDIX A – INFRASTRUCTURE OVERVIEW 500ktpa FLOAT PLANT & POWER ROUGHER SAG MILL SCAVENGER BALL MILL THICKENER VERTI MILL TANK CLEANER Current Power Grid (6 x 1MW installed + 3 Disconnected backup Power Grid (6 x 1MW Wind power (1.8MW total) spare + 1 x 500KW) New Filter Press (installed diesel Gen

  23. Slide 23: Appendix A – Infrastructure Overview: Coyita and Delia Mine

    APPENDIX A – INFRASTRUCTURE OVERVIEW COYITA AND DELIA MINE INFRASTRUCTRE DELIA SUR MINE COYITA NORTE MINE

  24. Slide 24: Coyita Resource – Feb24

    COYITA RESOURCE — FEB24 MITRE MINING s CORPORATION COYITA SE COYITA Nth Existing Coyita Nth Decline and acess ~650m @ 1:7

  25. Slide 25: Delia Resource – Feb24

    DELIA RESOURCE — FEB24 MITRE MINING - CORPORATION DELIA SE TRINIDAD

  26. Slide 26: Cerro Bayo – District Scale Potential

    CERRO BAYO – DISTRICT SCALE POTENTIAL Pegaso 6 & 8 veins rock chips: 2km • 16,547 g/t Ag & 19.1 g/t Au Brillantes high-grade vein rock chips: • 4.326 g/t Ag & 15.2 g/t Au • 1,311 g/t Ag & 5.56 g/t Au • 4,240 g/t Ag & 10.3 g/t Au • 704 g/t Ag & 4.2 g/t Au • 2,797 g/t Ag & 10.1 g/t Au • 556.5 g/t Ag &

  27. Slide 27: Chile - A Globally Significant Jurisdiction

    CHILE - A GLOBALLY SIGNIFICANT JURISDICTION Globally significant Metals Producer Renewable Energy Leader1 • 1st in Copper (~23%) • 2030 goal to supply 70% of total energy consumption as renewables • 2050 Goal to be 100% carbon neutral • 2nd in Lithium (~24%) • Energy transition has bi-partisan polit

  28. Slide 28: Cerro Bayo Silver-Gold Project: A Transformational Acquisition

    CERRO BAYO SILVER-GOLD PROJECT A TRANSFORMATIONAL ACQUISITION ‣ A significant ready-to-go underground & open pit silver-gold mine in the Deseado Massif, Chile ‣ A world class mining province host to Newmont, Yamana, Anglo Ashanti, McEwen Mining ‣ Rapid and immediate low cost resource growth THE OPPO

  29. Slide 29: Appendix B – Silver-Gold Deposit Comparisons

    APPENDIX B – SILVER-GOLD DEPOSIT COMPARISONS Deposit country Company Tonnes (Mt) Ag (g/t) Au (g/t) Contained Ag (Moz) Contained Au (koz) Ageq (g/t) Ageq (Moz) SOURCE Immaculda Peru HOC 18.9 124 3.1 75.0 1864 381 231 https://www.hochschildmining.com/where-we-operate/reserves-resources/ La Coipita Arg

  30. Slide 30: Appendix C – Silver Statistics

    APPENDIX C – SILVER STATISTICS Global Silver production versus demand Year Mine (Moz) Recycling (Moz) Demand (Moz) Deficit (Moz) 2014 882 160.4 1110 -67.6 2015 896 146.9 1153 -110.1 2016 899.8 145.6 1074 -28.6 2017 863.6 147 1053 -42.4 2018 850.3 148.5 1081 -82.2 2019 836.6 148 1086 -101.4 2020 782.

  31. Slide 31: Appendix D – Laguna Verde Project Mineral Resources

    APPENDIX D – LAGUNA VERDE PROJECT MINERAL RESOURCES Mineral Resource Estimate as at 1 March 2023 Indicated 1. Mineral Resources are classified and reported in accordance with the 2012 Tonnes Ag Au Silver Gold AgEq AgEq AuEq AuEq Area JORC Code. (Mt) (g/t) (g/t) (Moz) (koz) (g/t) (Moz) (g/t) (koz) 2.

Mitre Mining — PDAC 2024 on 6ix