Alicanto Minerals Ltd · ASX:AQI

Alicanto Minerals — Resources Rising Stars Investor Conference (June 2022)

17 slides from Alicanto Minerals's conference presentation, Jun 7, 2022

  1. Slide 1: ASX Announcement - RRS Presentation

    ASX ANNOUNCEMENT 7th June 2022 ASX Release – RRS Presentation For personal use only Alicanto Minerals Limited (ASX: AQI) is pleased to advise that Managing Director, Peter George, will be presenting at the Resources Rising Stars Investor Conference on the Gold Coast today at 4.15pm AEST / 2.15pm AWS

  2. Slide 2: Great Projects, Greater Ambitions

    For oersonal use only ALICANTO G2 oe MINERALS LIMITED Great Projects, Greater Ambitions A NEW LARGE HIGH-GRADE POLYMETALLIC DISCOVERY SALA SILVER-ZINC-LEAD-(COPPER-GOLD) PROJECT | SWEDEN

  3. Slide 3: Disclaimer

    Disclaimer For personal use only This presentation has been prepared by Alicanto Minerals Limited (the Company) and is authorised by the Board of Directors of Alicanto Minerals Limited. General Information & Disclaimer This presentation has been prepared for the purposes of providing information to

  4. Slide 4: Corporate Snapshot

    SHAREHOLDER BREAKDOWN Corporate Snapshot (ASX: AQI) % Board and WELL FUNDED AND TIGHTLY HELD 13 Management For personal use only % Alicanto Minerals Limited Portfolio of 100% owned historically producing, high-grade Silver, Copper, Gold, Zinc and Lead projects Other Shareholders 54 located in the wo

  5. Slide 5: Board and Management

    Board and Management Non-Executive Chairman Ray Shorrocks A TRACK RECORD OF DISCOVERIES & CORPORATE SUCCESS For personal use only - Over 150 years combined experience in exploration and mining success Managing Director Peter George - Over 10 combined exploration discoveries with 6 in Sweden Non-Exec

  6. Slide 6: World Class Massive Sulphide Intersection

    4.7m @ 24.2% Zn, 875 g/t Ag, 3.7% Pb 1 WORLD CLASS MASSIVE SULPHIDE INTERSECTION For personal use only 1. Refer to ASX Announcement 03/05/2022 5

  7. Slide 7: Quick Swedish Market Analysis

    Quick Swedish Market Analysis For personal use only Four major issues that Sweden is Facing • THE CUPBOARD IS BARE – ESG / Sustainability requirements for Exploration and Mining Companies and their general inability to adapt to the demands of a well-informed public has resulted in much of the intern

  8. Slide 8: Base Metal Mines In Sweden

    Zinc Production Europe - 2019 Base Metal Mines In Sweden 0.3 No new mines in the last 10 years and the cupboard is bare! For personal use only 0.25 Operating Base Metal Mines Main Year Metals O/UG Disc. Prod.Start Mt Grade (%, g/t) Operator Comment 0.2 Aitik Cu, Au OP 1930 1968 4055 Cu - 0.21 %, Au

  9. Slide 9: Mind The Gap

    Mind The Gap GLOBAL SUPPLY FOR ZINC IS FALLING OFF THE CLIFF For personal use only • Under-investment in global exploration for zinc deposits • Declining production from existing zinc mines • Market is screaming out for new projects to fill the gap • Demand growth is continuing with reduced stocks a

  10. Slide 10: Silver - Supply Versus Demand

    Silver – Supply Versus Demand SILVER MARKET IN PHYSICAL DEFICIT SINCE 2019, SILVER MINE SUPPLY IN DECLINE SINCE 2016 For personal use only Silver Supply Dives into Deficit in 20211 Global Silver Mine Reserves Drop in 20211 1. Refer to www.sprott.com/insights/silver-report-silver-demand-and-supply-tr

  11. Slide 11: Tier Mining Location - Sweden

    Tier 1 Mining Location - Sweden MAJOR MINING DISTRICT IN WORLD-CLASS JURISDICTION For personal use only JURISDICTION • Europe is one of the best mining locations globally • Sweden consistently ranks in the top 40 states & provinces globally in the Fraser Institute Investment Attractiveness Index • S

  12. Slide 12: World Class Project in the Making in a Tier Location

    World Class Project in the Making in a Tier 1 Location SALA – A MAJOR UNDEVELOPED MINERALISED SILVER-ZINC-LEAD-COPPER-GOLD SYSTEM For personal use only Sala Project (Alicanto) Sala Lode Prince Lode Falun Zinkgruvan Garpenberg (Closed 1908) (Unmined) (Closed 1992) (Lundin) (Boliden) Surface 5 Mt Hist

  13. Slide 13: AQI Unlocking the Potential of The Sala Project

    AQI Unlocking the Potential of The Sala Project ONLY A SMALL PART OF THE SYSTEM HAS BEEN TESTED – TARGETS OPEN IN ALL DIRECTIONS • Sala only mined down to 290m before being closed in 1908 with For personal use only no historical drilling below the same level • Multiple stacked lodes with high-grade

  14. Slide 14: Maiden Inferred Resource - Reaching For The Stars

    Maiden Inferred Resource – Reaching For The Stars TWO RIGS DRILLING AROUND THE CLOCK - ALL HOLES ARE INTERSECTING SIGNIFICANT MINERALISATION For personal use only • Initial drilling targeting the stratabound high-grade sphalerite dominated Prince lode • All holes have intersected significant mineral

  15. Slide 15: Exploiting Our Competitive Advantages

    Exploiting Our Competitive Advantages HIGH-GRADE HISTORIC PRODUCING SILVER MINE, WITH A FAST TRACK TO RESOURCE GROWTH For personal use only Historic Potential Large Team with Track News Flow Production Discoveries Record 200 Moz Silver- Silver Zinc- produced Lead GRADE & WIDTH POLYMETALLIC GROWTH ST

  16. Slide 16: For personal use only

    For personal use only (ASX:AQI) REGISTERED Ground Floor, 24 Outram Street OFFICE West Perth WA 6005 PHONE +61 (0) 8 6279 9425 EMAIL info@alicantominerals.com.au WEBSITE www.alicantominerals.com.au

  17. Slide 17: For personal use only

    For personal use only

Alicanto Minerals — Resources Rising Stars Investor Conference (June 2022) on 6ix