Transition Metals Corp. · TSXV:XTM

Transition Metals — Technical Presentation (October 2020)

5 slides from Transition Metals's technical presentation, October 2020

  1. Slide 1: Doherty Lake Project

    Doherty Lake Project Potential for Lode and Paleoplacer Gold Systems Au Ni Cu Pt XTM – TSXV

  2. Slide 2: Doherty: Potential for Lode and Paleoplacer Gold Systems

    Doherty Potential for Lode and Paleplacer Gold Systems ! Located ~ 60 km northeast of Sudbury ! Shallowly dipping quartz-carbonate veining ! Grab values up to 2.25 oz/t Au and 45 oz/t Ag ! Strongly developed shear zone at contact between Nipissing gabbro - Huronian sediments ! Wallbridge - 2008 comb

  3. Slide 3: Doherty: Ontario Gold Projects – Location and Geology

    Doherty Ontario Gold Projects LOCATION ‒ ~60 km NE of Sudbury ‒ 12 claims ~1,920 ha Geology -Huronian Supergroup Gowganda Formation and overlying Lorrain Formation - intruded by the Nipissing Gabbro XTM – TSX.V transitionmetalscorp.com 3

  4. Slide 4: Doherty: Ontario Gold Projects – History

    Doherty Ontario Gold Projects HISTORY 1970 Kennco Exploration Limited 8 ddh totalling 203.3 m up to 0.23% Cur and 1.5% Zn 1995 Dan Patrie: ground magnetic and VLF survey 2006 Albert Leblanc and David Morrison samples returned 0.2 oz/ton Au and 2.1 oz/ton Au 2006-07 Wallbridge Mining: stripping, mapp

  5. Slide 5: Doherty: Ontario Gold Projects – 2011 Drilling

    Doherty Ontario Gold Projects 2011 - 8 ddh totalling 520 meters - up to 0.66 g/t Au and 1.0 to 183 g/t Ag - Mineralization is open along strike and down dip XTM – TSX.V transitionmetalscorp.com 5

Transition Metals — Technical Presentation (October 2020) on 6ix