Pan American Silver Corp. · TSX:PAAS
Pan American Silver — Technical Presentation (December 2023)
13 slides from Pan American Silver's technical presentation, Dec 18, 2023
Slide 1: La Colorada Skarn Project
Wa PAN AMERICAN — SILVER — La Colorada Skarn Project
Slide 2: Cautionary Note Regarding Forward Looking Statements and Information
2 mineral reserve and mineral resource estimates and the assumptions upon be other factors that cause results not to be as anticipated, estimated, which they are based; prices for energy inputs, labour, materials, supplies and described or intended. Investors are cautioned against undue reliance on
Slide 3: Cautionary Note Continued
3 CONTINUED SEC standards. Under U.S. standards, mineralization may not be classified as a ''reserve'' unless the determination has been made that the mineralization The Qualified Person for the mineral resource estimate is of the opinion that could be economically and legally produced or extracted
Slide 4: PEA highlights
4 • Production averaging 17.2 million ounces of silver, 427 thousand tonnes of zinc and 218 thousand tonnes of lead annually during the first 10 years • 50,000 tonnes per day sub-level cave mining method and conventional flotation plant • 17-year mine life and continued exploration upside, with more
Slide 5: La Colorada skarn geology
5 A A’ A’ A 903 901 902 Plan showing surface geology , local structure, primary epithermal vein locations, skarn footprint and zones of economic skarn mineralisation including section line Typical cross section of the La Colorada skarn (looking North) showing for the geology faults (blue lines), por
Slide 6: La Colorada Skarn resource estimate classification
6 • La Colorada Skarn resource estimate was classified into indicated and inferred confidence categories according to the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) 2014 Standards. • Confidence classification was based on drill hole spacing, continuity of mineralisation, estimati
Slide 7: Challenges and opportunities
• Challenges • Depth • Temperature • Low grade • Geometry • Ventilation • Dewatering • Stress • Time to full production • Opportunities • Resource Model • Recovery • Prices • Block caving 7 December 18, 2023
Slide 8: Challenges and opportunities
• Challenges • Depth • Temperature • Low grade • Geometry • Ventilation • Dewatering • Stress • Time to full production • Opportunities • Resource Model • Recovery • Prices • Block caving 8 December 18, 2023
Slide 9: Challenges and opportunities
• Challenges • Depth • Temperature • Low grade • Geometry • Ventilation • Dewatering • Stress • Time to full production • Opportunities • Resource Model • Recovery • Prices • Block caving Source: Jarek Jakubec 2021 9 December 18, 2023
Slide 10: Skarn Surface Facilities
\, y urface ‘e we X 8a SKARN SURFACE FACILITIES (Local Cordinate system) PEA - December 2023 Plan View of Skarn Project Surface Facilities J PAN AMERICAN — siLveR —
Slide 11: PEA key parameters and metal price assumptions
11 Construction period 6 years Production mine life 17 years Production rate 50 ktpd (or 18.25 Mtpa) Metal Price Assumptions: Mineable inventory 284.7 million tonnes Zinc $2,800 per tonne, Lead $2,200 per tonne Average annual silver produced first 10 years 17.2 million ounces Silver $22.00 per ounce
Slide 12: To join the queue
To join the queue: Press * and 1 on your touch-tone telephone. You will hear a tone acknowledging your request. If you wish to remove yourself from the queue, press * and 2
Slide 13: Presentation archive on website
The audio and presentation archive of this conference call and webcast will be accessible on our website at: https://www.panamericansilver.com/investors/events-and-presentations/
Pan American Silver — Technical Presentation (December 2023) on 6ix