Commander Resources — Corporate Update (July 2018)
9 slides from Commander Resources's corporate update, July 2018
Slide 1: South Voisey's Bay
RESOURCES LTD. —— i HPX EXPLORATION = ,
Slide 2: SVB 2018 Exploration
SVB 2018 Exploration TARGET: MAGMATIC Ni-Cu-Co Description: LABRADOR, CANADA The South Voisey’s Bay (SVB) property lies 90 km south of the world class Voisey’s Bay (VB) deposit. The Intrusions at SVB and VB are the same age, hosted within the same country rock and emplaced along the same important t
Slide 3: Project Location, Claims and 2018 Exploration Targets
Project Location, Claims and 2018 Exploration Targets Lithology Subsurface extent of PLI ‘PLI’ Gabbro and Olivine Gabbro ‘PLI’ Contaminated and South Gabbro ‘Churchill Province’ (1333±1 Ma) Ortho/Paragneiss (Amelin et al., 1999) ‘Nain/Harp Intrusive Suite’ Anorthosite East Bowl West Bowl (North:1322
Slide 4: Conceptual model for magmatic Ni-Cu-Co sulphide targets at South Voisey's Bay
Conceptual model for magmatic Ni-Cu-Co sulphide targets at South Voisey’s Bay LEGEND Tasiuyak paragneiss Analogues: South Voisey’s Bay/Voisey’s Bay Olivine Gabbro/Troctolite Cumulate Gabbro/Troctolite Sulphide injection Sulphide settling Orthogneiss/Ederbitic Gneiss Paragneiss (Tasiuyak at SVB & VB)
Slide 5: Detail: West and East Bowl "Conduit Mineralization" Targets
Detail: West and East Bowl “Conduit Mineralization” Targets Lithology BB % ‘PLI’ Gabbro and Olivine Gabbro ‘PLI’ Sulphide Contaminated Gabbro ‘Churchill Province’ Ortho/Paragneiss Major structures: interpreted from geology, magnetic surveys (ground and airborne) and PhotoSat data. B Area of detail A
Slide 6: Cross-section of West Bowl "conduit" Exploration Target
Cross-section of West Bowl “conduit” Exploration Target LEGEND Ni (%) Geologic suite >0.3 ‘Churchill Province’ Ortho/Paragneiss ‘Harp Intrusive Suite’ Anorthosites 0.25 ‘N/A’ Faults/Massive Sulphides 0.20 ‘Nain Archean Province’ Gneiss ‘Nain Plutonic Suite’ Granites/Gneiss 0.15 ‘Overburden’ ‘Pants L
Slide 7: Vale's Voisey's Bay in the News
Vale’s Voisey’s Bay in the News “ Amid nickel boom, Vale moves forward with underground mine at Voisey’s Bay ” The move will extend the mine's operating life by at least 15 years. Construction will begin later this summer, with first ore expected no later than April 2021. Canadian national broadcast
Slide 8: 2017 Program Core from Sandy Target Area
2017 Program Core from Sandy Target Area DDH 17-6 45.3m to 49.2m: 3.9m @ 0.37% Ni, 0.10 % Co, 0.27% Cu
Slide 9: 2017 Program Core from Sandy Target Area
2017 Program Core from Sandy Target Area High sulphide content (pyrrhotite) Mixed gabbro breccia (leuco gabbro after in wallrock paragneiss. No nickel. olivine gabbro) with pyrrhotite and clots of Associated with broken quartz remnant graphite after digestion of vein/gabbro breccia. Interpreted para