Toachi Mining — Investor Presentation (August 2018)
25 slides from Toachi Mining's investor presentation, August 2018
Slide 1: Creating a Premier High Grade Gold & Copper Company
Creating a Premier High Grade Gold & Copper Company Corporate Presentation August 2018
Slide 2: Forward Looking Statements
Forward Looking Statements This document contains forward-looking statements under Canadian securities legislation. Forward-looking statements include, but are not limited to, statements with respect to the development potential and timetable of the Toachi project; the timing and amount of estimated
Slide 3: Company Share Structure
Company Share Structure Capital Structure As of May 9, 2018 Shares (M) Shares Issued and Outstanding 81,166,435 Share Price (July 9, 2018) CAD$0.14 Market Cap (CAD) ~$11M Options 5,837,000 (1) Cash (CAD) ~$2.9M Warrants 11,151,309 (2) Debt (CAD) $0 Fully Diluted Shares Outstanding 98,154,744 Enterpr
Slide 4: Management & Board
Management & Board World-size discoveries and operational experience “We believe in bringing shareholders value by investing in advanced stage projects focused on high-grade copper & gold” • Professional engineer with over 25 years of leadership in project management, Latin America Alain Bureau • Fo
Slide 5: Strong Internal Capacity & Scientific Partners
Strong Internal Capacity & Scientific Partners Engineering Resource Metallurgy Environment & Calculation & Health Development & Processing & Modeling Safety Pierre Bureau, P.Eng, PMP Dr. Julian Barnes, B.Sc, Ph.D. Dr. Simon Meik, B.Sc, Ph.D. Andrea Chavez Former Global Construction Founder of RSG Gl
Slide 6: Significant Exploration Potential
Significant Exploration Potential 2,335 1 hectres concession • VMS deposits tend to form in clusters which reinforces the prospect of further nearby deposits • +9 km of favorable geology along strike • Q. Romero: Drilled in 1965 - 1967 by Dr. Duncan R. Derry (Canadian Mining Hall of Fame) – 22m at 1
Slide 7: Why Invest in Toachi?
Why Invest in Toachi? THE TOACHI ADVANTAGE • Proven Board and Management historically delivered value to shareholders • We target advanced projects to maintain value and lower risk • La Plata is a high grade project at surface; less expensive to drill and brings more value per meter drilled • Intern
Slide 8: In Country Partnership and Deal Terms
In Country Partnership and Deal Terms LOW COST OWNERSHIP AGREEMENT Partnership with OWNERSHIP Compañia Minera La Plata and Principal Allen Brown Hidalgo, established in Ecuador Requirements to Ownership to 65% Ownership to 75% acquire 60% ownership • TIM produces Feasibility Study • TIM raises requi
Slide 9: La Plata Gold-Copper-Zinc-Silver VMS Project
La Plata Gold-Copper-Zinc-Silver VMS Project LOW POWER COSTS Hydro | $0.06 US ¢/ kWh Diesel | $0.27/ litre Ministry of Energy LA PLATA Henry Troya Consolidated Mining, Oil & Gas, and Electricity into one ministry President Lenin Moreno target of US$4.6B investment over his term in office for large-s
Slide 10: TIM Location
TIM Location Hydro line on site Located 100 km South-West of Quito (capital of Ecuador) Access to grid power 5 km away 85 km on paved highway Low elevation 1,600 m (Quito 2,850 m) 9
Slide 11: The Right Time in Ecuador
The Right Time in Ecuador • “Best Country Award” at Mines and Money London in November 2017 • Excellent infrastructure investment in airports, roads, and ports • Policy shift towards increasing foreign investment • Fiscal stability contracts • VAT refund • Accelerated depreciation • Small to mid siz
Slide 12: Community Involvement
Community Involvement • Our vision is to create strong and longstanding relationships with the local communities and all levels of government • Executed CSR program with support from the local community • Local community, municipality of Palo Quemado favourable to mining • No existing indigenous lan
Slide 13: La Plata NI-43-101 Resource Estimate
La Plata NI-43-101 Resource Estimate Unique Exposure to Base and Precious Metals La Plata Deposit – Inferred Mineral Resource Cut Off AuEq Au Ag Cu Pb Zn AuEq Au Ag Cu Pb Zn Mt AuEq gt/t (g/t) (g/t) (g/t) (%) (%) (%) (koz) (koz) (koz) (Kt) (Kt) (Kt) 2 2.4 10.96 3.4 42.2 2.7 0.5 3.8 842 261 3,241 64
Slide 14: The Genesis of Sub-Seafloor Replacement-Style VMS Deposits
The Genesis of Sub-Seafloor Replacement-Style Volcanogenic Massive Sulfide (VMS) Deposits • Sub seafloor replacement-style volcanogenic massive sulfide (VMS) deposits are a subset of VMS deposits where sulfides have replaced semi consolidated volcanic, volcano- sedimentary, and sedimentary material
Slide 15: La Mina Perspective Long Section
La Mina Perspective Long Section Open at depth Section – Looking West La Mina North Block Topographic Surface Historic Open Pit 300M Fault Gouge Historic Underground Workings Guatuza Prospect (Not Modelled) 200M AuEq RANGES 400M CMLP Block La Mina South 17-93 100 m See press release on September 13,
Slide 16: Recent Drilling Extends Mineralization
Recent Drilling Extends Mineralization See press release on October 11, 2017 15
Slide 17: La Plata Block Model
La Plata Block Model AuEq grade shells 10 & 20 g/t Section – Looking West Topographic Surface Historic Open Pit Fault Gouge Historic Underground Workings Guatuza Prospect (Not Modelled) La Mina North Block AuEq GRADE SHELLS • 10g/t AuEq cut off: 1mt at 5.8g/t Au, <10 70 g/t Ag, 4.5% Cu, 1.0% Pb and
Slide 18: La Plata Timeline
La Plata Timeline 2017 2018 ACTIVITY Q1 Q2 Q3 Q4 H1 H2 ENVIRONMENTAL BASELINE STUDIES DRILLING & EXPLORATION METALLURGY RESOURCE ESTIMATION PEA 17
Slide 19: Value Creation in developing high grade projects
Value Creation in developing high grade projects Modest Investment | Significant Leverage • Expand La Mina’s high grade VMS resources Drill and • Cost of drilling vs building ounces is low due to Expand La Mina metal value of the rock • High margin tons – create significant value • Preliminary Metal
Slide 20: Summary
Toachi Mining High Grade Development & Exploration The Right Time in Ecuador SUMMARY • High grades in a gold-rich VMS project • Inaugural NI 43-101 delivered Q3 2017 • Excellent exploration potential to add to inaugural NI43-101 resource • Preliminary metallurgy indicates good metal recoveries
Slide 21: Appendix
Appendix
Slide 22: AuEq Grade – VMS Peers
AuEq Grade – VMS Peers AuEq Grade 14.0 12.0 10.0 AuEq (g/t) 8.0 6.0 4.0 2.0 0.0 Metal price assumptions: Zn: US$1.05/lb, Cu: US$2.85/lb, Pb: SOURCE: Thomson Reuters, Beacon Securities US$1.30/lb, Au: US$1,280/oz, Ag: US$17.00/oz February, 2018 A-1
Slide 23: Tonnage vs Rock Value – VMS Peers
Tonnage vs Rock Value – VMS Peers Tonnes (M) versus Rock Value (US$/t) 600 Toachi Mining Inc 500 400 Rock Value (US$/t) Salazar Resources Ltd Atico Mining Corp 300 Hudbay Minerals Inc (777) Hudbay Minerals Inc (Lalor) Hudbay Minerals Inc (Reed) Rockcliff Metals Corp (Rail) Constantine Metal Resource
Slide 24: Tonnage vs AuEq Grade – VMS Peers
Tonnage vs AuEq Grade – VMS Peers Tonnes (M) versus AuEq (g/t) 14.0 Toachi Mining Inc 12.0 10.0 8.0 Salazar Resources Ltd AuEq (g/t) Atico Mining Corp Hudbay Minerals Inc (777) Hudbay Minerals Inc (Lalor) Hudbay Minerals Inc (Reed) Rockcliff Metals Corp (Rail) 6.0 Constantine Metal Resources Ltd Roc
Slide 25: For More Information, please contact Candace Di Vito
For More Information, please contact Candace Di Vito Manager, Investor Relations 416.365.7043 Head Office Ecuador Office cdivito@toachimining.com 2400 - 120 Adelaide Street West Edificio Coruña Plaza, Avenida Toronto, Ontario M5H 1T1 Coruña N27-88 y Orellana Quito, Ecuador