Tlou Energy Ltd · ASX:TOU
Tlou Energy — Investor Presentation (November 2016)
20 slides from Tlou Energy's investor presentation, November 2016

Slide 1: Gas to Power in Botswana - Investor Presentation Q3 2016
Gas to Power in Botswana Investor Presentation Q3 2016

Slide 2: Disclaimer
DISCLAIMER This presentation (Presentation) has been prepared by Tlou Energy Limited (Tlou). The Presentation and information contained in it is being provided to shareholders and investors for information purposes only. The information contained in this disclaimer does not constitute an offer, invi

Slide 3: Overview
OVERVIEW Delivering gas-to-power via CBM in a market with huge demand MARKET ASX / AIM • Huge market – chronic energy shortage locally & regionally EPIC TOU/ TLOU • High power price – replace expensive SHARES IN ISSUE 206M imported power and diesel generation • De-risked, the most advanced CBM proje

Slide 4: Strong Track Record
STRONG TRACK RECORD Led by an experienced team including a pioneer of CBM in Queensland Anthony (Tony) Gilby • Geologist with >30 years industry experience • Co-founder of a number of CBM companies • Previous technical roles for ESSO & Exxon MD & CEO • Led takeover of Sunshine Gas by QGC (BG) in 200

Slide 5: Share Register
SHARE REGISTER Shareholding 30% ASX - Retail, 29% 25% AIM, 22% HNW, 22% 20% Institutions, 18% 15% 10% Management, 9% 5% 0% ASX - Retail Institutions AIM HNW Management 5

Slide 6: Vision & Strategy
VISION & STRATEGY Long term vision to build a mid-tier energy provider in Southern Africa In June 2016, Botswana’s Export Government power announced that Greenfield CBM is to be IPP 300MW included as part of the plan to deal Orapa with the country’s 90MW power deficiency 50MW Gas-to- Power project I

Slide 7: Scalable 50MW Project - Key Steps
SCALABLE 50 MW PROJECT - KEY STEPS Plan to deliver first gas to market via the first phase of a scalable 50MW project 7

Slide 8: Regional Power Dynamic
REGIONAL POWER DYNAMIC As Botswana’s reliance on non-firm imports and on-going diesel generation increases, the support for domestic sources of energy is strong Southern African Development Community - Supply and Demand • Botswana’s demand to increase 37% to 1,017MW by 2025 • Current demand not bein

Slide 9: Gas to Power Plans in Botswana
GAS TO POWER PLANS IN BOTSWANA Lesedi is ideally located for access to supporting infrastructure 9

Slide 10: Lesedi Project Map
LESEDI PROJECT MAP Large licence area, significantly de-risked, Tlou operating since 2009 10

Slide 11: Lesedi in Numbers
LESEDI IN NUMBERS Certified Resource Statement Certified Contingent Resource Unrisked Gross Unrisked Net OGIP(1) (100 Percent) (100 Percent) Category (BCF) Contingent Resources (SRK, 2015) (BCF) (BCF) 4.9 239 3,295 Low Estimate (1C) 7.6 4.9 4.9 BCF BCF BCF Best Estimate (2C) High Estimate (3C) 367.8

Slide 12: Proposed Market Opportunities
PROPOSED MARKET OPPORTUNITIES Multiple market opportunities – significant demand following successful commissioning of 50MW plant Phase Market Opportunity Strategy 1 Transmission Scalable new 50MW Complete production testing and expand lines Grid-connected power Selemo pilot sufficient to supply

Slide 13: EV Comparison - Table
EV COMPARISON - TABLE 2P + 2C EV to Company Country Type Stage EV Resources 2P+2C US$m Bcf US$/Bcf Bowleven Cameroon Conventional Pre-development -25.1 336.4 0.00 Tlou Energy Botswana CBM Pre-development 10.2 239.1 0.04 Ophir Energy Tanzania Conventional Pre-development 340.6 6,092.3 0.06 Great East

Slide 14: EV Comparison - Graph
EV COMPARISON - GRAPH 1.20 1.00 EV/2P+2C resources (US$/Bcfe) 0.80 0.60 0.40 0.20 0.00 Bowleven Tlou Energy Ophir Great Seplat Victoria Oil Aminex Wentworth Green Energy Eastern Petroleum & Gas Resources Dragon Gas Energy Source: Brandon Hill Capital 14

Slide 15: Investment Case
INVESTMENT CASE Most advanced gas project in Botswana Huge regional demand for Premium power power price Multiple Low cost Experienced market environment team opportunities 15

Slide 16: Contact
CONTACT Tlou Energy Limited 210 Alice St Brisbane QLD 4000 Australia T:+61 7 3012 9793 Ground Floor, Victoria House 132 Independence Avenue Gaborone Botswana T:+267 316 0857 W:www.tlouenery.com E: info@tlouenergy.com ASX: TOU AIM: TLOU 16

Slide 17: Appendix
APPENDIX 17

Slide 18: Coal Bed Methane (CBM)
COAL BED METHANE (CBM) • Chemically identical to other sources of gas but is produced by non-conventional methods • Extracted from coal seams rather than sandstone reservoirs • Main component from natural gas is methane • Typically found at depths of 400m – 1,000m enabling lower drilling costs per w

Slide 19: Operating in Botswana
OPERATING IN BOTSWANA Major power High deficiency in energy the region prices Attractive Large operating Extensive Stable Supportive mining and coal jurisdiction government industry to regulatory resources power regime 19

Slide 20: Gas to Power in Botswana - Investor Presentation Q3 2016
Gas to Power in Botswana Investor Presentation Q3 2016
Source: Internet Archive copy of tlouenergy.com
More decks from Tlou Energy Ltd
Investor Presentation (April 2025)27 slides · Apr 2, 2025
Shareholder Meeting (November 2024)19 slides · Nov 26, 2024
Investor Presentation (December 2023)16 slides · Dec 15, 2023
Shareholder Meeting (October 2023)15 slides · Oct 31, 2023
Shareholder Meeting (October 2022)17 slides · Oct 18, 2022
Investor Presentation (September 2022)17 slides · Sep 15, 2022