NCC — Investor Presentation (September 2013)

104 slides from NCC's investor presentation, Sep 30, 2013

  1. Slide 1: NCC Limited

    NCC LIMITED “NCC HOUSE”| Madhapur | Hyderabad – 500 081 | India Sep 30, 2013 Copyright © 2013 NCC Limited

  2. Slide 2: Presentation Outline

    PRESENTATION OUTLINE • HISTORICAL BACKGROUND • INDUSTRY OUTLOOK • SEGMENTS • FOCUSED GROWTH STRATEGY 2 Copyright © 2013 NCC Limited

  3. Slide 3: Historical Background

    HISTORICAL BACK GROUND 3 Copyright © 2013 NCC Limited

  4. Slide 4: Vision Mission Values

    VISION To be a world class construction and infrastructure enterprise committed to quality, timely completion, customer satisfaction, continuous learning and enhancement of stakeholders value. MISSION To build a strong future ensuring increased returns to shareholders and enhanced support to associa

  5. Slide 5: Experience, Size and Know-how

    Experience, Size and Know-how NCC amongst most experienced firms in industry NCC achieved significant scale to bid for and win 2011 Company rebranded as NCC large contracts Order Book crosses INR 220 Billion 2010 Order Book crosses INR 160Billion 2008 Mining division started 5 Yr-CAGR 16.2% 2007 Oil

  6. Slide 6: NCC – Growing Reputation

    NCC – GROWING REPUTATION • Fastest growing Construction Company in 2006 • Twelve research reports during last two years with BUY recommendation • A return of 95% to GDR holders in the first year • Recognition by Forbes Asia as “ Best Under a Billion” • Invitation by “World Economic Forum” to partici

  7. Slide 7: NCC's key strengths

    NCC’s key strengths Strong management team and experienced staff are NCC’s key strengths  30+year history in Indian construction industry  Strong, experienced and dedicated management team and skilled work force – 4,576 employees including 3,000 Engineers (excludes contract labour) – Almost two th

  8. Slide 8: Strong financial position and excellent credit rating

    Strong financial position and excellent credit rating • Relatively low levels of long-term bank loans –Short term loans primarily used for working capital requirements • Able to borrow on good terms and at favourable rates due to strong standing in construction industry and good track record –Commit

  9. Slide 9: Industry Outlook

    INDUSTRY OUTLOOK 9 Copyright © 2013 NCC Limited

  10. Slide 10: Growth in Order Booking

    Growth in Order Booking Total Order Book: `202,470 Mn (As on Sept. 30, 2013) 10 Copyright © 2013 NCC Limited

  11. Slide 11: Executing Projects Across India

    Executing Projects Across India Overseas Offices Dubai Muscat 11 Copyright © 2013 NCC Limited

  12. Slide 12: Segments

    SEGMENTS 12 Copyright © 2013 NCC Limited

  13. Slide 13: Diversified operating base across 11 divisions

    Buildings & Water & Roads Electrical Irrigation International Housing Environment • Housing projects • Highways • Water supply • Transmission • Dams • Buildings • Industrial • Bridges, flyovers projects and distribution lines and sub- • Lift irrigation • Roads buildings and elevated • Treatment stat

  14. Slide 14: Buildings & Housing, Roads, Oil & Gas

    Buildings & Housing, Roads, Oil & Gas,  Construction spending for Urban infrastructure expected to amount to Rs. 231bn(US$ 5.8 bn) in Eleventh Five year plan  Key drivers include growing Indian industry & economy, increasing urbanization and household growth (` Mn)  Industrial buildings 5 Yr.-Rev

  15. Slide 15: Some of the Major Projects Executed: Buildings & Housing

    Buildings & Housing Some of the Major Projects Executed are: 15 Copyright © 2013 NCC Limited

  16. Slide 16: Buildings & Housing

    Buildings & Housing Project: Tuberculosis Research Center, Chennai PROJECT: GOVT. HOSPITAL, CHENNAI Scope : New patient care & clinical facility at TB Hospital, Chennai Project: Army Medical College, New Delhi Project: Apollo Hospital, Bhubaneswar 16 Copyright © 2013 NCC Limited

  17. Slide 17: Buildings & Housing

    Buildings & Housing Project: Wipro Technologies, Cochin Project: IDCO, Bhubaneswar Scope : Superstructure & Civil Work for Software Dvlpt., Centre Scope : Software Complex (Fortune Towers) Project: Patni Computer, Mumbai Project: Satyam School, Hyderabad. Scope : I.T.Centre at MIDC Knowledge Park, A

  18. Slide 18: Buildings & Housing

    Buildings & Housing Project: Delhi Devp. Authority, Navsaad Vihar Housing socity, Delhi. Project: Army Welfare Housing org., Panchakula, New Delhi. Scope : Multi Storied apartments & Site development work. Scope : Accommodation for AWHO on part ‘A’ of Plot in sector-20 Project: SBI, Mumbai. Project:

  19. Slide 19: Buildings & Housing

    Buildings & Housing Project: Shriram Srishti, Bangalore. Project: Samrudhi, Bangalore. Scope : Multistoried residential Apartments at Shriram Smaruddhi. Scope : Multistoried residential Apartments at Shriram Symphony Project: SPPL White House, Karnataka. Karnataka Housing Board, Bangalore, Karnataka

  20. Slide 20: Buildings & Housing

    Buildings & Housing IDA Green Wood - Lucknow Sahara Homes DG MAP-VIZAG – MODEL BLOCK J N T U – HYDERABAD - Auditorium 20 Copyright © 2013 NCC Limited

  21. Slide 21: Buildings & Housing

    Buildings & Housing Project: JMD, Delhi Project: KBH-DOC, Chamrajnagar, Karnataka Scope: Commercial Complex at Gurgaoni. Scope: Construction of District Office Complex Project: Cabinet Secretariat Building, New Delhi Project: NAC, Hyderabad (Rewared received for early completion Scope: Building, Inf

  22. Slide 22: Buildings & Housing

    Buildings & Housing Project: SAAP Gachibowli, Hyderabad Scope: Accommodation fo9r Athletics. Project: District Office Complex - Haveri Project: NBCC – NETAJI NAGAR, NEW DELHI 22 Copyright © 2013 NCC Limited

  23. Slide 23: Buildings & Housing

    Buildings & Housing Delhi Metro Bhavan, New Delhi NIT, Warangal, AP Project: Satyam, Hydrabad Scope: Development Centre at Bachupalli. Times of India - Mumbai 23 Copyright © 2013 NCC Limited

  24. Slide 24: Buildings & Housing

    Buildings & Housing Times of India NIT-Silchar – Block A MRF - SADASIVPET Mahindra - Satyam 24 Copyright © 2013 NCC Limited

  25. Slide 25: Buildings & Housing

    Buildings & Housing KSRTC-MYSORE – Sathgalli Bus Stand KSRTC-MYSORE – Illwalai Bus Stand KSRTC-MYSORE – Kuvempu Bus Stand PWD- Bowring Hospital 25 Copyright © 2013 NCC Limited

  26. Slide 26: Buildings & Housing

    Buildings & Housing NIT-Agartala – Boys Hostel NIT-SILCHAR ICFAI-Agartala-Hostel –A,B,C & D Blocks 26 Copyright © 2013 NCC Limited

  27. Slide 27: Buildings & Stadiums

    Buildings & Stadiums Khelgovn-Ranchi 27 Copyright © 2013 NCC Limited

  28. Slide 28: Buildings & Stadiums

    Buildings & Stadiums Project: GMC Balayogi Stadium, Gachibowli, Hyderabad Project: National Games Stadium, Saroornager, Hyderabad Scope: Construction of Athletic Stadium for National Games 2002 Scope: Indoor Stadium for Gymnastics & Wrestling and for basketball Project: National Games Stadium, Yousu

  29. Slide 29: Buildings & Stadiums

    Buildings & Stadiums Project: Rajeev Gandhi International Cricket Stadium, Uppal, Hyderabad Scope: Stadium with 45,000 Seating capacity & other facilities 29 Copyright © 2013 NCC Limited

  30. Slide 30: Buildings & Stadiums

    Buildings & Stadiums Project: Raipur Cricket Stadium Scope: Stadium with 60,000 Seating capacity & other facilities 30 Copyright © 2013 NCC Limited

  31. Slide 31: Delhi University Stadiums – Commonwealth Games 2010

    Buildings & Stadiums DELHI UNIVERSITY STADIUMS –COMMONWEALTH GAMES - DELHI 2010 31 Copyright © 2013 NCC Limited

  32. Slide 32: Buildings & Stadiums

    Buildings & Stadiums 32 Copyright © 2013 NCC Limited

  33. Slide 33: Buildings & Housing

    Buildings & Housing Project: Shilpakalavedika, Hyderabad Project: Indira Gandhi International Airport – New Delhi Scope: Multistoried Build-Award received as outstanding Scope: Design and Reconstruction of Terminal IA structure - 2002 Project: ISTA Hotel, Hyderabad Project: Volkas Wagen - Pune Scope

  34. Slide 34: Industrial Buildings Structures

    Industrial Buildings Structures HDPE Unit For Petro Chemicals Expansion Project, Pata, Auraiya Zuari Cements Limited, Yerraguntla, Cuddapah, A.P Cement Plant at Kurnool , Andhra Pradesh Gautami Power Plant at Peddhapuram, East Godavari Dist, AP 34 Copyright © 2013 NCC Limited

  35. Slide 35: Buildings & Housing

    Buildings & Housing PWD- GMC-Hostel & Qtrs - Constn.of College B'ldg, Boys and Girls Hostels Block and Doctro Qtrs. Block for 431.40 Govt. Medical college at Hassan Phase - II Agricultural College Building-Karekere-Hassan - Constn.of Agricultural College Building at Karekere Hassan 210.10 Phase - I

  36. Slide 36: Buildings & Housing

    Buildings & Housing Health Project Unit - G'Nagar - Pkg. 1, Part 1 - Retro fiting & Re furbishing of Civil hospital ward block new 2541.40 Trauma centre Ahmedabad of Gujarat state Golden Jubilee Hotels Ltd. - Hyderabad - Constn.of 5 star deluxe hotels at Shilpakalavedika Madhapur - 1305.80 Hyderabad

  37. Slide 37: Buildings & Housing

    Buildings & Housing JAIN Housing - Chennai - Thiruneermalai -Constn.of Residential Apartments at Thiruneermalai 520.00 JAIN Housing - Chennai - Pammal - Constn.of Residential Apartments at Pammal 527.94 BMRCL - R4-Design and Constn.of Elevated structure excl. station portions in reach - H between Sh

  38. Slide 38: Buildings & Housing

    Buildings & Housing Shri Ram - Surabhi Project - Proposed Residential Project "Shriram Surabhi" Mallasandra 581.19 Army Quarters - Bheemunipatnam - Constn.of dwelling units Dolphin hills - Bheemunipatnam 3012.60 Army Quarters - Bihar - Constn.of dwelling units at Bimaghiri Coach - Bihar 1905.80 ANSA

  39. Slide 39: Transportation: Some of the Major Projects Executed

    Transportation Some of the Major Projects Executed are: 39 Copyright © 2013 NCC Limited

  40. Slide 40: Roads

    Roads Project: Kalina-Vakila Flyover rcd Bonus for early completion Project: Britania Flyover at Ring Road, Lawrence Road, Delhi Scope: Flyover on Maharastra – Mumbai Highway (1427 mtrs in length) Scope: Flyover and subway intersection at Britania Chowk Project: Bangalore Elevated Flyover Project: L

  41. Slide 41: Roads

    Roads Project: Kovilpatti Flyover, Chennai Bangalore Elevated Tollway Limited Scope: Const. of ROB between Kovilapatti & Nalli at KM 94/2 & 91/4 Project: Bridge on River Sone (Longest bridge of GQ) Scope: 4 Laning & strengthening between 110 & 140 KM (Sona Bridge) Bangalore Elevated Tollway Limited,

  42. Slide 42: Roads

    Roads Project: National Express Way No.1(Phase-II of Ahmedabad-Vadodra) Project: Nagpur Flyover Scope: SI: Lane access controlled expressway (50km) Scope: Const. of ROB along with approaches at Km 1040/5 to 7 Project: 4 Laning of Bangalore – Mysore Road (SH-17) Project: Amaravati Bypass on NH-6 in M

  43. Slide 43: Roads

    Roads Project: Necklace Road under Buddha Purnima Project for Hyderabad Urban Project: NHAI-Six Laning of NH-1 for 15 Kms. of Delhi Border to Samalkha Development Authority, Hyderabad section in Haryana state. Project: AP-Package between Vishakapatnam and Champavati river of NH-5 Project: Constructi

  44. Slide 44: Roads

    Roads KRDCLP-2 Bridges-Construction of Bridges in Karnataka( Package II) 621.60 BASTI-LMNHP-UP5(NHAI 28 LUCKNOW-MUZAFFARPUR)-Lucknow-Mujaffarpur National Highway Project 3726.43 on NH-28 NHAI - Meerut, Muzaffarnagar - LUCKNOW-Meerut - Muzaffarnagar Section 1693.98 NHAI - U.P - Lalitpur (NH-26)-Rehab

  45. Slide 45: Oil & Gas

    Oil & Gas IOCL - PARADIP 45 Copyright © 2013 NCC Limited

  46. Slide 46: Oil & Gas

    Oil & Gas IOCL - EPCM - 2 Oil & Gas (VGO)- Civil structural and Associated UG Piping works(EPCM2) 1482.70 Nagarjuna Oil Corpn. - Mylapore - Chennai - Civil & Structural works installation of equipment, Hydrogen 2491.60 plant refinery at Cuddalore IOCL - New Delhi - Paradeep Refinery (TOYO)-Civil, St

  47. Slide 47: Water & Environment and Railways

    Water & Environment and Railways  Water supply and sanitation projects expected to account for over Rs500bn(US$12.5 bn), in Eleventh Five Year plan  Increasing private sector participation and use of BOOT contracts to lead growth for private players (` Mn) 5 Yr-Revenue CAGR 8.8% NCC’s key business

  48. Slide 48: Water & Environment: Major Projects Executed

    Water & Environment Some of the Major Projects Executed are: 48 Copyright © 2013 NCC Limited

  49. Slide 49: Water & Environment

    Water & Environment Project: CMWSSB, Chennai India Biggest water treatment plant, Amberpet, Hyderabad Scope: M.S.Pipe line of 2000mm dia & 1500mm dia Raw Water & Clear water transmission pipe for 530 MLD Water treatment plant Project: Krishna Drinking Water Supply Project-Phase I Project: Sanand. Ma

  50. Slide 50: Water & Environment

    Water & Environment Project: Kokarada, Amaravathi Dist - Maharastra Project: UGD Scheme, Bellary - Karnataka Scope: Rural water supply for 156 villages in Daryapur, Anjangaon Scope: 15 MLD & 30 MLD sewage treatment plant, SWG/RCC pipelines. Project: V-Valley Water Supply Scheme, Dhanabad, Jatkhand S

  51. Slide 51: Water & Environment

    Water & Environment FACCULATATIVE AERATED LAGOONS–339MLD STP AMBERPET, HYDERABAD CLARIFLOCCULATOR - AJMER-KEKRI STP BIO GAS GENERATORS –339MLD STP AMBERPET FLOATING BARGE – NADIA, WEST BENGAL 51 Copyright © 2013 NCC Limited

  52. Slide 52: Water & Environment

    Water & Environment RCC PIPE MANUFACTURING UNIT- INDORE JACK WELL CUM PUMP HOUSE - MIHAN JACK WELL CUM PUMP HOUSE - MIHAN MS PIPE LINE - COIMBATORE 52 Copyright © 2013 NCC Limited

  53. Slide 53: Water & Environment

    Water & Environment Project: IFFCO Project: Nadiya Project: Maharastra Jeevan Pradhikaran Surji - Maharastra Project: Kosaram Pumping 53 Copyright © 2013 NCC Limited

  54. Slide 54: Water & Environment

    Water & Environment Bisalpur Water Supply Project, Phase II Ajmer-Execution of Bisalpur Water Supply Project, Phase II 2821.30 NADIA Water Supply - PHE Office - Kolkatta-Surveying, Planning, Designing, Delivery, Errection & 2461.60 Constn.of all civil, Electrical, Mechanical works GVMC - VISAKHAPATN

  55. Slide 55: Water & Environment

    Water & Environment ELURU WATER SUPPLY PROJECT-Invstigation, Survey, Design and execution of Eluru water Supply scheme 728.30 Coimbatore Corporation - Coimbatore-Providing clear water pumping main from WTP upto clear water 870.20 tunnel at Kattan hills Pkg. IV & V PHE - Kolkatta - GWS(NADIA) -Errect

  56. Slide 56: Railways

    Railways Project: Delhi Metro Rail Corporation Limited - Delhi Metro Rail - Bangalore Scope: Plinth casting with installation of rails in position for RC3 56 Copyright © 2013 NCC Limited

  57. Slide 57: Electrical

    Electrical  Indian power supply needs to grow at approximately 12% annually to keep pace with GDP growth rate of 8% per annum  Central Government has introduced schemes which include “Accelerated Power Development and Reform Programme” (APDRP) for improving transmission and distribution network ac

  58. Slide 58: Electrical: Major Projects Executed

    Electrical Some of the Major Projects Executed are: 58 Copyright © 2013 NCC Limited

  59. Slide 59: Electrical

    Electrical Project: AP TRANSCO, Mahaboobnagar, AP Project: APDRP – Nagpur - Maharastra Scope: Aug of 33/11 KV power trans. VCBs. Bay Extns-DFID-85/98 Scope: 33 KV OH/UG Lines, Substations, allied work on turnkey basis Project: APGRP, Mangaldoi, Assam. Project: Tata, Madanapally, AP Scope: Strength &

  60. Slide 60: Electrical

    Electrical Project: Southern Power District Co of AP, Tirupati, AP. Scope: Turnkey basis Project - 28 UPPALWADI, NAGPUR APTRANCO-Khammam 60 Copyright © 2013 NCC Limited

  61. Slide 61: Electrical Division

    Electrical ELECTRICAL DIVISION DESIGN, ENGINEERING, ERECTION, TESTING & COMMISSIONING OF • 400 KV TRANSMISSION LINE • 220 KV TRANSMISSION LINE • 33/11 KV SUB STATION • 33 KV OVER HEAD LINE • 11 KV OVER HEAD LINE • PROJECT ELECTRIFICATION • SYSTEM IMPROVEMENT PROJECTS 61 Copyright © 2013 NCC Limited

  62. Slide 62: Electrical

    Electrical GESCOM - Gulbarga - Karnataka - Rural Electrification works in Gulbarga Dist.of Karnataka state in 582.70 turnkey basis under Rajeev Gandhi Grameen Vidyutikiran yojana scheme. M.P Paschim Kshetra Vidyut Vitaran-PPRno.3-Supply of materials, Survey, Errection, installation, 338.70 commissio

  63. Slide 63: Irrigation

    Irrigation  Construction investment in irrigation sector expected to be Rs. 1033bn (US$25.9 bn) during 11th Five Year plan  Construction investment in Hydropower sector expected to be around US$18.5 billion during 11th Five Year plan being 57% of total investment in power sector  Increasing impor

  64. Slide 64: Some of the Major Projects Executed

    Some of the Major Projects Executed are: 64 Copyright © 2013 NCC Limited

  65. Slide 65: Irrigation

    Irrigation Project: Gundalkamma Reservoir Project, Ongole Project: Devadula, AP Scope: Water supply of 80,000 acres, Dam, bund, Right & Left canals Scope: Devadula Lift Irrigation Project - AP Project: Tadipudi , AP Gandikota Reservoir – Gandikota-AP Scope: Tadipudi Ettipotala Project 65 Copyright ©

  66. Slide 66: Irrigation

    Irrigation J.Chokka Rao GLIS - Warangal - Phase-II-Devadula Phase - II 9806.30 Sanjay Sagar Project, Basoda, M.P.-Construction of Earth Dam, Concrete Sluice and Central spillway of 524.20 Sanjay Sagar (Bah) Project Govt.of AP - CAD Irrigation (Thotapally)-Construction of Thotapally Barrage 1404.15 G

  67. Slide 67: Power

    Power  The performance of the power sector directly impacts the overall economy of the country, as it is the most important constituent of infrastructure.  The Indian Govt.’s current economic plan, with its emphasis on greater industrialization and infrastructure development, has created tremendou

  68. Slide 68: Power

    Power Hydro Power - Manali Project: Gowtami Powr Project, Peddapuram Project: Duhagan Hydro Electric Project Project: Gowtami Powr Project, Peddapuram Scope: 460 mw combined cycle power plant at Kakinada Scope: 460 mw combined cycle power plant at Kakinada Scope: Upstream Head Race Tunnel – Tunnel i

  69. Slide 69: Power

    Power Coal Bunker #10(14 MTR LVL) & COAL BUNKER #10 (35 MTR LVL) Name of client: BHEL; Work: Site at Angul, Orissa 69 Copyright © 2013 NCC Limited

  70. Slide 70: Power

    Power Name of Client: Adhunik Power Work: Power House – Size 38M X 167M 70 Copyright © 2013 NCC Limited

  71. Slide 71: Power

    Power NTPC LTD., NOIDA, Civil works Package for BARH Super Thermal Power Project 1095.90 RRVUNL, CHHABRA Thermal Power - Jaipur - Engineering Procurement & Constn.on turnkey basis of river water system comprising of all Civil structural Mechanical, Electrical works - Chhabra Dist. - 419.10 Baran KVK

  72. Slide 72: Metals

    Metals  Metal Industry is the mainstay of an economy as it meets the requirements of a wide range of industries such as infrastructure, engineering, automobile, electrical and electronics.  The rapid pace of industrialisation in India is constantly pushing up the demand curve for steel and other m

  73. Slide 73: Metals

    Metals SAIL-IISCO STEEL PLANT, Blast Furnace Project, Burnpur – West Bangal 73 Copyright © 2013 NCC Limited

  74. Slide 74: Metals

    Metals IISCO STEEL PLANT – BLAST FURNACE 74 Copyright © 2013 NCC Limited

  75. Slide 75: Metals

    Metals NTPC-BARH-BIHAR 75 Copyright © 2013 NCC Limited

  76. Slide 76: Metals

    Metals SAIL - IISCO Steel Plant - ISP - BFP - 2.5 MTPA new stream expansion & ISP-Setting UP of blast furnace 7190.31 Complex. SAIL IISCO Steel Plant - Burnpur - 48 A - 2 - Structural works for Basic Oxyzen furnace,continous casting 3483.77 plant and Line & Domestic Plant SAIL IISCO Steel Plant - Bu

  77. Slide 77: Mining

    Mining  A number of opportunities exist in this space in view of the government planning to open private sector participation in mining.  Untapped potential for Indian players in global market (` Mn)  Established in 2008, this division Revenue CAGR 14% caters to the coal needs of the Group compan

  78. Slide 78: Mining

    Mining HEMM at Medapalli Open Cast Project, Ramagundam- AP 78 Copyright © 2013 NCC Limited

  79. Slide 79: Mining

    Mining Mahanadi Coal Fields Ltd- MCL- Kulda OCP Drilling, Excavation, Dumping, Dozing and other allied 880.10 works at Basundara area Mahanadi Coal Fields Ltd-MCL-Kaniha - Drilling, Excavation, Dumping, Dozing and other allied works at 356.70 Lingaraj area SCCL - Opencast Project ,Kothagudem - Blast

  80. Slide 80: International

    International  India has miniscule Rs22bn (US$0.5bn) share of Rs176tn(US$4trillion) global construction business.  Construction business internationally offers excellent opportunity for project exports  Untapped potential for Indian construction players in global market • NCC has opened regional

  81. Slide 81: International Presence

    International International Presence • NCC has an presence in Oman and UAE through Highlights of Our International Business subsidiaries – NCCL International LLC in Muscat Contracts won so far ` 74,725Mn – Nagarjuna Contracting Co. LLC in Dubai • Key focus areas internationally are also built around

  82. Slide 82: International

    International Dualization of Al Amerat Quriyat Road at Muscat 82 Copyright © 2013 NCC Limited

  83. Slide 83: International

    International Salamath Housing Project: Sohar Water Network Phase – I at Sohar, Muscat DEWA Pipe Line Project, Dubai, Package- 512A 83 Copyright © 2013 NCC Limited

  84. Slide 84: International

    International Quriyat Housing Project: 84 Copyright © 2013 NCC Limited

  85. Slide 85: Subsidiaries - Business Plans

    Subsidiaries - Business Plans Focus on Focus On Long Term Infra Projects Real Estate Projects Residential Commercial Transportation Power Vilas IT Parks Apartments Hotels Townships SEZS Commercial Complexes Shopping Malls 85 Copyright © 2013 NCC Limited

  86. Slide 86: Current BOT Portfolio

    Current BOT Portfolio NCC Ltd. 100% • Focus on NCC Infra – Long term infra projects – Stable revenue streams Roads Power 33% Brindavan 67% Himachal Sorang Infrastructure (~63 km) (100 MW) 51% Western UP Tollway 51% Himalayan Green (~79 km) (280 MW) 38% Bangalore Elevated 55% NCC Power Project Roads

  87. Slide 87: Execution on Track

    Execution on Track Equity – NCC Equity Invested(2) Revenue Project Cost Target Projects Partners Share Current Status Model (` Mn) (` Mn) COD (` Mn) Roads Brindavan Infrastructure Annuity IL&FS E&C, 2,475 150 59 Jun 2006 All annuities are being received on due dates KMC Bangalore Elev. Tollway Toll

  88. Slide 88: Real Estate Projects

    Real Estate Projects • Real estate development spearheaded by NCC Urban Infrastructure Ltd • 16 projects planned in the Group NCC Ltd. Promoters – 10 projects are ongoing currently • Presence across 6 cities in India and Dubai 80% 20% • Acreage ~ 410 acres • No fresh investments from parent company

  89. Slide 89: NCC Urban: Some of the Major Projects Executed

    NCC Urban Some of the Major Projects Executed are 89 Copyright © 2013 NCC Limited

  90. Slide 90: NCC Urban

    NCC Urban NAGARJUNA GREEN RIDGE NAGARJUNA GREEN WOODS NAGARJUNA ENCLAVE Nagarjuna Green Valley 90 Copyright © 2013 NCC Limited

  91. Slide 91: NCC Urban

    NCC Urban Nagarjuna Premier - Bangalore Nagarjuna Aster Park - Bangalore 91 Copyright © 2013 NCC Limited

  92. Slide 92: NCC Urban

    NCC Urban Nagarjuna Suites, Bangalore 92 Copyright © 2013 NCC Limited

  93. Slide 93: NCC Urban

    NCC Urban Construction of National Housing Complex (NGHC) Project at Ranchi. No. of flats : 2000 93 Copyright © 2013 NCC Limited

  94. Slide 94: NCC Urban

    NCC Urban Nagarjuna Residency, Gachibowli - Hyderabad 94 Copyright © 2013 NCC Limited

  95. Slide 95: NCC Urban

    NCC Urban Nagarjuna Maple Heights I & II Bangalore 95 Copyright © 2013 NCC Limited

  96. Slide 96: NCC Urban

    NCC Urban NCC Urban Gardenia Gachibowli - Hyderabad No of Units: 184 Build up Area: 8.6 Lacs sft. 96 Copyright © 2013 NCC Limited

  97. Slide 97: NCC Urban

    NCC Urban Urban One – Narsingi - Hyderabad No of Units: 1529 Build up Area: 36.56 Lacs sft. 97 Copyright © 2013 NCC Limited

  98. Slide 98: NCC Urban

    NCC Urban Park Square - Guntur 98 Copyright © 2013 NCC Limited

  99. Slide 99: NCC Harmony Dubai

    NCC HARMONY DUBAI Total Built up area : 4.00 Million Sq ft Project Value : AED 1700 Million Location : Dubio Tech, Dubai City Construction of 2 No’s Tower (G+35) at Dubio Tech, 99 Copyright © 2013 NCC Limited

  100. Slide 100: Focused Growth Strategy

    FOCUSED GROWTH STRATEGY 100 Copyright © 2013 NCC Limited

  101. Slide 101: Focused growth strategy

    Focused growth strategy Increased focus on BOT and BOOT projects in Transportation and Power  One of few companies to make early entry into BOT and BOOT projects Expand in international markets that fit within broad strategic vision Currently focusing on Transportation, Water and Buildings proje

  102. Slide 102: Numerous accolades testify to NCC's excellent reputation

    Numerous accolades testify to NCC’s excellent reputation Select Awards & Accolades  Award from Forbes Asia: Only construction company in India to be One On-time performance of the 200 "Best Under a Billion" listed companies in Asia Pacific in • Possesses one the best records for quality 2005 and ti

  103. Slide 103: Construction Machinery & Equipment

    CONSTRUCTION MACHINERY & EQUIPMENT NCC has acquired modern, sophisticated and state-of-the-art construction plant, equipment and machinery imported as well as indigenous viz., Hot Mix Plant (Mobile and Stationery), Electronic Pavers, Pneumatic Tyred Rollers, Vibratory Tandem Rollers, Vibratory Earth

  104. Slide 104: Thank You

    Thank You Copyright © 2013 NCC Limited