Slide 1: 2026 Copper South Australia Site Tour
For personal use only Exchange release 23 November 2026 2026 Copper South Australia Site Tour BHP will be hosting an investor and analyst site tour on 23 November 2026 – 24 November 2026 to provide an update on our Copper South Australia business and growth strategy. A copy of the presentation mater

Slide 2: Contacts
For personal use only Contacts Media Investor Relations media.relations@bhp.com investor.relations@bhp.com Australia and Asia Australia and Asia Gabrielle Notley John-Paul Santamaria +61 411 071 715 +61 499 006 018 Europe, Middle East and Africa Europe, Middle East and Africa Sinead Keller Adam Sand

Slide 3: Copper South Australia: Unlocking a world-class copper province
rsonal use only Copper South Australia: Unlocking a world-class copper province November 2026 Olympic Dam

Slide 4: Disclaimer
Disclaimer The information in this presentation is current as at 23 November 2026. It is in summary form and is not necessarily complete. It should be read together with the BHP Results for the year ended 30 June 2026. Forward-looking statements This presentation contains forward-looking statements,

Slide 5: Acknowledgement of Kokatha Country
Acknowledgement of Kokatha Country rsonal use only A New Chapter Presten Warren 3

Slide 6: Copper South Australia site tour: Day at a glance
Copper South Australia site tour: Day 1 at a glance What we’ll cover What you are going to see Copper and BHP The attractiveness of copper and BHP’s tier 1 copper portfolio Prominent Hill rsonal use only Intro. to Copper SA Copper SA’s evolution into an integrated and high-performing asset Olympic D

Slide 7: Copper South Australia site tour: Day at a glance
Copper South Australia site tour: Day 2 at a glance What we’ll cover What you are going to see Prominent Hill Snapshot of Prominent Hill operations and PHOX Prominent Hill rsonal use only Ankata Introduction to Ankata Olympic Dam 1 Ankata Block caving Block caving 101 2 Carrapateena Carrapateena The

Slide 8: Copper and its place within BHP
rsonal use only Copper and its place within BHP Geraldine Slattery Minerals Australia President Olympic Dam

Slide 9: BHP's portfolio sits within attractive mining jurisdictions
BHP’s portfolio sits within attractive mining jurisdictions A focused, tier 1 portfolio of attractive assets designed to deliver value for decades to come North America rsonal use only Jansen Australia Canada’s largest potash project1 Copper South Australia Resolution JV Building a world class coppe

Slide 10: Commodity selection drives value in mining
Commodity selection drives value in mining Scale, steep cost curves and exposure to demand drivers linked to today's mega trends drives commodity attractiveness Commodity attractiveness rsonal use only Steep cost curve1 Scale / size (US$)2 Demand drivers 27x Electrification Copper Digitisation / dat

Slide 11: Forecast copper demand growth requires new supply
Forecast copper demand growth requires new supply… Accelerating demand and declining production from existing mines are expected to drive a copper supply deficit in coming years Total copper demand1 Total copper demand vs total copper supply rsonal use only (Mt) (Mt) 50 50 Up to ~10 Mtpa of new prim

Slide 12: New mine supply is becoming more challenging
…and new mine supply is becoming more challenging Capital cost inflation, grade decline, increasing complexity and resource nationalisation are contributing to an increase in the cost of new supply Capital intensity of copper projects1 Milled head grade2 Global copper growth capex3 (US$k/t Cu, real

Slide 13: BHP is already the world's largest listed copper producer
BHP is already the world’s largest listed copper producer… BHP produces ~1.4 Mtpa of attributable copper - more than any other company – and has a pathway to increase by a further 40%1 Copper production2 (Mtpa, attributable) rsonal use only +40% 2.0 1.8 1.6 1.4 1.2 1.0 0.8 0.6 0.4 0.2 0.0 First Quan

Slide 14: Pathway to grow to 2 Mtpa Cu by 2035
…with an attractive pathway to grow to 2 Mtpa Cu by 2035… Copper SA is core to BHP’s pathway to increase its attributable copper production by ~40% by mid 2030s1 Attributable copper equivalent production Copper By-products (Mtpa) rsonal use only 3.0 ~2.0 Mtpa Cu ~2.5 Mtpa CuEq* 2.5 Additional option

Slide 15: Funded entirely from Copper's operating cash flows
…and funded entirely from Copper’s operating cash flows Tier 1 asset scale and high margin performance means our copper business break-even is forecast to be below long run consensus price Free cash flow (FCF3) break-even copper price4 (US$/lb) rsonal use only In FY26, our copper business delivered:

Slide 16: Key takeaways
Key takeaways rsonal use only Supply from existing copper mines is expected to be insufficient to meet demand BHP is the largest copper producer1, with a pathway to increase attributable copper production to 2 Mt by 20352 We expect Copper SA to generate ~1/3 of our copper growth to 20353 at competit

Slide 17: Introduction to Copper South Australia
rsonal use only Introduction to Copper South Australia Anna Wiley Copper South Australia Asset President Olympic Dam

Slide 18: Copper SA: A world class copper, gold and uranium asset
Copper SA: A world class copper, gold and uranium asset A wholly owned polymetallic resource with ~80 years of mine life1 Copper SA has the world’s 2nd largest rsonal use only contained copper resource3… Polar Division Olympic Dam 🡑 2% to 88.1 Mt2 Pebble Carrapateena 5.0 Mt Prominent Hill 1.5

Slide 19: A uniquely OECD-located, fully integrated facility
A uniquely OECD-located, fully integrated facility… Copper SA has three operating sites including an integrated smelter and refinery located within a stable region Province map Flowsheet rsonal use only Underground Underground Hoisting, Concentrator development load & haul crush & convey Sales produ

Slide 20: A locally based workforce with deep expertise
…with a locally based workforce with deep expertise A highly skilled, diverse local workforce collaboratively developing exciting future pathways in our region rsonal use only Local Inclusive2 Depth of knowledge Talent development • ~8,000 employees and contractors • ~35% female representation • Ope

Slide 21: Success is everyone going home safe and well
Success is everyone going home safe and well Our approach: Build capable people, engineer risk out of work, and simplify how safety is managed Our people Our controls Our systems rsonal use only Empower capability Engineer out risk Strengthen consistency Hazard identification and Field Leadership 18

Slide 22: We have integrated Carrapateena and Prominent Hill
We have integrated Carrapateena and Prominent Hill Carrapateena and Prominent Hill provide scale and improved operating flexibility Realised synergies are 2.5x original estimate1 Prominent Hill rsonal use only EBITDA synergies of >US$130 m per annum through: Centralised concentrate processing at Oly

Slide 23: Diversified markets for copper and by-products
Diversified markets for copper and by-products We sell a range of high-quality products providing optionality in terms of product strategy Copper cathode Copper concentrate Uranium oxide Refined precious metals rsonal use only Product • Olympic Dam premium cathode • High grade Cu content: 30 - 50%1

Slide 24: Our vision for Copper SA has evolved
Our vision for Copper SA has evolved Our growth strategy for Copper SA reflects a better understanding of the asset and a focus on long term value creation Successive development concepts and studies … ... have informed our asset strategy for Copper SA rsonal use only 2005 – 2012 Large open pit and

Slide 25: A number of strategic decisions have already been made
A number of strategic decisions have already been made We have already made several strategic development decisions1, with two key decisions under study and yet to be made Underground rsonal use only Mining Selective only Ongoing study Open-cut Selective + bulk OD block cave size mining Two-stage sm

Slide 26: Copper SA's development is aligned with BHP's strategy
Copper SA’s development is aligned with BHP's strategy Copper SA’s growth strategy is key to BHP's commitment to winning the next decade... and beyond BHP rsonal use only Strengthening our Delivering disciplined Accelerating performance foundations programmatic growth Copper SA Deliver margin resili

Slide 27: Improving operational and financial performance
rsonal use only Improving operational and financial performance Jane Kuang Minerals Australia Vice President Finance Olympic Dam

Slide 28: BOS and technology are improving operational stability
BOS and technology are improving operational stability… BOS integration is well advanced at Copper SA and we are leveraging technology to accelerate performance improvement BHP Operating System Technology rsonal use only Operational Excellence Index (OEI)1 Olympic Dam Carrapateena 70 Olympic Dam Sur

Slide 29: Recent investment has lifted capacity
…and recent investment has lifted capacity Investment to improve performance at Copper SA has been across the value chain Olympic Dam mine Olympic Dam surface Carrapateena rsonal use only Kalta Decline (2018) Smelter Campaign Maintenance (2021) Crusher 2 (2024) Hoist and Rail asset integrity (2021)

Slide 30: Production is now more stable and at record levels
Production is now more stable and at record levels… Year-on-year operational consistency culminated in record FY26 performance Copper SA production1 Copper price2 FY26 production records rsonal use only (kt) (US$/lb) 600 6.00 Record material mined and ore milled 500 Acquisition of 5.00 Carrapateena

Slide 31: Cost performance has beaten inflation
…and cost performance has beaten inflation Integration and productivity improvement has enabled Copper SA to deliver real cost decline, with by-products enhancing margin resilience Unit costs (US$/lb) rsonal use only 5.00 SCM21 Record by-product revenue 3.75 Acquisition of US$2.3 bn Carrapateena and

Slide 32: A strong foundation for investment
A strong foundation for investment Copper SA’s renewed operational stability provides confidence to support increased capital investment The Capital Allocation Framework sits at the core of BHP rsonal use only Operating productivity Portfolio Operating Capital Record EBITDA in FY26 of US$3.2 bn prod

Slide 33: Enduring connections
rsonal use only Enduring connections Anna Wiley Copper South Australia Asset President

Slide 34: Creating shared value across South Australia
Creating shared value across South Australia Building trusted partnerships and regional capability that support Copper SA today and into the future Major economic driver Strong regional supply chains Community contribution rsonal use only ~A$450 m ~A$300 m ~A$10 m SA royalties and taxes spend with l

Slide 35: Strengthening relationships with Traditional Owners
Strengthening relationships with Traditional Owners Building enduring partnerships and supporting connection to Country and culture Partnerships and participation rsonal use only Negotiating contemporary agreements across A$60 m contract with AMY BHP’s Nominees BHP’s largest Traditional Owner ‘Healt

Slide 36: Partnering for the state's future
Partnering for the state’s future South Australia is a stable jurisdiction with an established regulatory framework, fiscal stability and enabling infrastructure Northern Water – nationally strategic infrastructure Modernised regulatory framework for Olympic Dam to enable significant economic uplift

Slide 37: Well positioned to further decarbonise our operations
Well positioned to further decarbonise our operations Renewable electricity and more efficient material movement support lower operational GHG emissions as the province grows rsonal use only Operational emissions Renewable electricity Electrification 100% 1.32 Mt CO2 42%1 ~80% 0% Material moved by e

Slide 38: Doubling production by 2040
rsonal use only Doubling production by 2040 Anna Wiley Copper South Australia Asset President Olympic Dam

Slide 39: Our strategy to double copper production
Our strategy to double copper production… We are advancing our strategy to grow Copper SA’s production to ~500 ktpa (~800 ktpa CuEq) by 2035 and up to 650 ktpa (~1 Mtpa CuEq) by 20401 Copper South Australia production (ktpa) Phase 1 Growth Program rsonal use only 1,000 Attractive indicative IRR 800

Slide 40: Through a program of integrated projects
…through a program of integrated projects… A series of complementary projects which have the potential to deliver more value than the sum of their parts rsonal use only Phase 1: Unlocking and growing to ~500 ktpa by 20351 Phase 2: Expanding to ~650 ktpa1 Mines and concentrators Smelter and refinery

Slide 41: Enabled by block caving and two-stage smelting
…enabled by block caving and two-stage smelting We are transforming the way we mine and the way we process to capture full value from Copper SA Block caving Two-stage smelting rsonal use only Structurally lowers mining costs Facilitates larger scale, longer life operation • Enables large-scale minin

Slide 42: Block caving drives structural mining cost improvement
Block caving drives structural mining cost improvement Transition to block caving increases production while structurally lowering unit costs Mining operating cost A structurally more productive operating model rsonal use only (US$/lb Cu produced)1 1.8 Less labour intensive than underground select

Slide 43: Olympic Dam needs a two-stage smelter
Olympic Dam needs a two-stage smelter Converting to two-stage smelting is essential to unlocking Olympic Dam’s current reserves Olympic Dam SLOS grade and Cu:S ratio Olympic Dam (Stoping Cu:S ratio) (OD stoping copper grade) (Contained copper Reserves, Mt) rsonal use only 7.6 11.3 3.0 Cu:S ratio SLO

Slide 44: Olympic Dam's smelter: strategic and economic benefits
Olympic Dam’s smelter: strategic and economic benefits Presence of radionuclides requires onsite smelting, and the smelter ensures we unlock the full potential of Olympic Dam’s unique resource rsonal use only Economic benefits Strategic benefits Two-stage smelting amplifies the benefits of block c

Slide 45: Phased approach to growth provides flexibility
Phased approach to growth provides flexibility Copper SA can fully fund Phase 1, reducing its reliance on BHP’s iron ore cash flows and increasing BHP’s capital flexibility1 Cumulative free cash flow (Phase 1) (US$ bn, real)2 rsonal use only 10.0 Phase 1 Average annual capital peak Phase 1 growth ca

Slide 46: Delivering on Copper SA's potential
Delivering on Copper SA’s potential An opportunity to expand Copper SA’s production and lower its costs Copper equivalent production1 Copper cost curve2 (kt CuEq) (C1, US$/lb, real) rsonal use only 1,600 6.00 1,400 5.00 1,200 4.00 1,000 3.00 Copper SA future 2.00 1st quartile cost 800 position3 1.00

Slide 47: A growth program that leverages prior learnings
A growth program that leverages prior learnings We are applying the lessons of the past to deliver the next stage of Copper SA’s growth Identified critical enablers and the actions we are taking rsonal use only Copper SA needs a two-stage smelter: Smelter expansion project FID in CY27 Bulk minin

Slide 48: A phased and integrated series of investments
rsonal use only A phased and integrated series of investments Jim McCluskey Copper South Australia General Manager Planning, Technical & Environment Carrapateena

Slide 49: Phase 1: Growing to ~500 ktpa Cu and ~800 ktpa CuEq
Phase 1: Growing to ~500 ktpa Cu and ~800 ktpa CuEq A series of complementary projects which deliver more value than the sum of their parts rsonal use only Phase 1: Unlocking and growing to ~500 ktpa by 20351 Phase 2: Expanding to ~650 ktpa1 Mines and concentrators Smelter and refinery Mines and con

Slide 50: Phase 1: Prominent Hill Expansion (PHOX)
Phase 1: Prominent Hill Expansion (PHOX) PHOX extends mine life by 10 years more than original expansion plan, increases production and provides additional smelter feed optionality Project overview1 rsonal use only • Execution complete. Commissioning in December 2026 • Includes electrical hoisting s

Slide 51: Phase 1: Carrapateena Expansion (CXP)
Phase 1: Carrapateena Expansion (CXP) The blueprint for block caving at BHP, extends life and lowers mining costs Project overview1 rsonal use only • Mining: Block cave ~450 m below existing Sub Level Cave ‒ Completed decline to ~1,400 m extraction level ‒ First drawbell targeted for early FY30; ~3

Slide 52: Phase 1: Olympic Dam Mine & Concentrator Growth (MCG)
Phase 1: Olympic Dam Mine & Concentrator Growth (MCG) Unlocking the full potential of the Mineral Resource through a low-cost mining method Olympic Dam: Mine & Concentrator Growth Project overview1 rsonal use only • Southern Mine Area Decline already in execution Southern Mine Area Decline + Ore-to-

Slide 53: Phase 1: Olympic Dam MCG study options
Phase 1: Olympic Dam Mine & Concentrator Growth (MCG) We are continuing to study the optimal size for the MCG block cave - a preferred alternative is expected to be determined in the next 12 months FY26 results basis1 Current focus of studies1 rsonal use only Production (Mtpa) 10 Up to 15 New Concen

Slide 54: Phase 1: Smelter and Refinery expansion (SRE)
Phase 1: Smelter and Refinery expansion (SRE) Brownfield, modular expansion of the smelter and refinery has been sized to maximise value and lower upfront capital Two-stage smelter sizing Project overview1 (Copper SA concentrate production, ktpa) rsonal use only 2,000 • Build new primary flash smelt

Slide 55: Growing gold, uranium and silver
Growing gold, uranium and silver By-products will increase by ~50% to 300 ktpa CuEq by 2035, improving economics and enhancing margin resilience1 rsonal use only 1 Total by-product copper equivalent production to increase Copper equivalent production2 50% by 2035: (ktpa) 400 ‒ Gold production to inc

Slide 56: Phase 2: Growing to 650 ktpa copper and 1 Mt CuEq
Phase 2: Growing to 650 ktpa copper and 1 Mt CuEq A series of complementary projects which deliver more value than the sum of their parts rsonal use only Phase 1: Unlocking and growing to ~500 ktpa by 20351 Phase 2: Expanding to ~650 ktpa1 Mines and concentrators Smelter and refinery Mines and conce

Slide 57: Phase 2: Growth potential at Olympic Dam
Phase 2: Growth potential at Olympic Dam Potential for multiple cave options leverage the resource to sustain up to 40 Mtpa mine production at Olympic Dam1 Olympic Dam: Indicative Block Cave Development Potential Project overview rsonal use only • Stoping (SLOS) can be sustained at 11 Mtpa until 205

Slide 58: Phase 2: Growth potential at Ankata (formerly Oak Dam)
Phase 2: Growth potential at Ankata (formerly Oak Dam) Ankata provides high grade growth optionality, at depth NEW DRILLING SINCE INITIAL Project overview1 RESOURCE rsonal use only EXISTING DRILLING (CURRENT REPORTED RESOURCE) • 8.8 Mt contained copper Mineral Resource assumes bulk underground EXIST

Slide 59: Phase 2: Creating one of the world's premier copper assets
Phase 2: Creating one of the world’s premier copper assets Our development plan for Copper SA will create an asset of Escondida’s relevance to BHP, and a platform for decades of value Copper equivalent production1 (kt CuEq) rsonal use only 1,600 1,400 1,200 1,000 800 600 400 200 0 Cerro Verde Las Ba

Slide 60: Project execution
rsonal use only Project execution Pedram Ittehadi Copper South Australia Head of Major Projects Prominent Hill

Slide 61: BHP's project execution track record is solid
BHP’s project execution track record is solid… We are building from a solid foundation of project delivery Project delivery track record1 (2016 – 2026) rsonal use only 100% Combined projects capex • BHP’s project delivery track record is strong (US$ bn)2 – 80% of projects on time and on budget since

Slide 62: Improving our delivery of major projects
…and we are improving our delivery of major projects While many issues with Jansen were unique to that project, there are valuable lessons for major project delivery rsonal use only Challenges at Jansen What we are doing differently in South Australia • Ineffective contract management • EPCM model s

Slide 63: We have a strategic plan that we are already executing
We have a strategic plan that we are already executing We have awarded >US$3 bn of major contracts and have a strategy for the known project execution challenges Laying the foundations for Phase 1 Key execution strategies… rsonal use only Carrapateena Crusher 2 Completed Grouping projects by work ty

Slide 64: Grouping projects by work type to extract synergies
Grouping projects by work type to extract synergies We have separated upcoming projects into 3 core work types to improve delivery outcomes 1 Core work types rsonal use only CXP Mines and Concentrators SCM Smelter NPI Enabling projects Block cave, materials handling, EPCM with D&S package and Accomm

Slide 65: Partnering with the best
Partnering with the best Our delivery partners have proven capability across underground, processing, engineering design and delivery 1 Core work types | Project partners rsonal use only CXP Mines and Concentrators SCM Smelter NPI Enabling projects Block cave, materials handling, EPCM with D&S packa

Slide 66: Modularisation and standardisation
Modularisation and standardisation Modularisation, pre-fabrications and replication reduce site labour, interfaces and schedule risk, and enhance safety Design early for delivery Standardise Fabricate offsite Install predictably rsonal use only Use proven module yards, pre-cast, Smaller site crews,

Slide 67: Key takeaways
Key takeaways We have a strategic plan for delivery of the South Australian growth program which we are executing rsonal use only BHP has a strong project execution track record We are embedding lessons from Jansen across our projects portfolio, including in South Australia We have secured tier 1 pa

Slide 68: Summary
rsonal use only Summary

Slide 69: Our strategy to double copper production
Our strategy to double copper production We have a strategy to deliver 500 ktpa Cu (~800 ktpa CuEq)1 by 2035 and ~650 ktpa Cu (~1 Mtpa CuEq) by 20401 Copper South Australia production (ktpa) Phase 1 Growth Program rsonal use only 1,000 Attractive indicative IRR 800 +150 ktpa Cu 14 – 17% Internal rat

Slide 70: Key messages
Key messages A strong plan to double copper production by 2040 through block caving and two-stage smelting rsonal use only Tier 1 resource, 100% owned Copper SA is a more stable and consistent operation, providing a stronger basis for investment We have a strategy to deliver ~500 ktpa copper by 2035

Slide 71: rsonal use only
AjuO SSN feUuosJS

Slide 72: Footnotes
Footnotes Copper and its place within BHP Slide 7 – BHP’s portfolio sits within attractive mining jurisdictions Slide 11 – BHP is already the world’s largest listed copper producer… (1) First production from Jansen Stage 1 is expected to be delivered in mid-CY27. Jansen Stage 2 production is expecte

Slide 73: Footnotes (continued)
Footnotes (continued) Introduction to Copper South Australia Enduring connections Slide 16 – Copper SA: A world class copper, gold and uranium asset Slide 32 – Creating shared value across South Australia (1) Mine life is estimated based on Ore Reserves and Mineral Resources and subject to conversio

Slide 74: Footnotes (continued)
Footnotes (continued) A phased and integrated series of investments Slide 47 – Phase 1: Growing to ~500 ktpa Cu and ~800 ktpa CuEq Slide 55 – Phase 2: Growth potential at Olympic Dam (1) See 'Forward-looking production information: assumptions and copper equivalent methodology' on slide 73. Projects

Slide 75: Forward-looking production information, assumptions and copper equivalent methodology
Footnotes Forward-looking production information, assumptions and copper equivalent methodology Only information expressly identified as production guidance or a production target constitutes BHP production guidance or a production target, as applicable. Unless otherwise stated, information is not i

Slide 76: Abbreviations and Glossary
Abbreviations and Glossary AKO Ankata NPI Non-Process Infrastructure rsonal use only BC Block Cave OEM Original Equipment Manufacturer BOS BHP Operating System OD Olympic Dam Copper SA Copper South Australia ODD Olympic Dam Deeps Cu:S Copper to Sulphur ratio PEA Preliminary Economic Assessment CuEq

Slide 77: Staging our options to maximise value
Staging our options to maximise value Taking a sequenced approach to project delivery with ongoing tollgates to maintain capital discipline We are sequencing our major projects rsonal use only Illustrative timeline Maturity CY26 CY27 CY28 CY29 CY30 CY31 CY32 CY33 CY34 CY35+ Phase 1 Growth Projects ●

Slide 78: Copper SA Phase 1 growth program set to deliver
Copper SA Phase 1 growth program set to deliver An attractive set of options that unlock more of Olympic Dam’s resource and enable growth through bulk mining Estimated Estimated Potential Indicative IRR Potential first rsonal use only capital capital Potential FID production at consensus Maturity pr

Slide 79: Copper SA Phase 2 growth creates enduring value
Copper SA Phase 2 growth creates enduring value Future expansions benefit from installed infrastructure, providing scale at low incremental capital intensities Potential Estimated Estimated Indicative IRR Potential first production rsonal use only capital capital Potential FID at consensus Maturity

Slide 80: Smelter Campaign Maintenance (SCM27)
Smelter Campaign Maintenance (SCM27) SCM27 is a critical bridge to two-stage smelting, supporting both operational reliability and long-term growth Project overview rsonal use only 6 • Major lifecycle maintenance program of the OD Smelter 8 10 • Critical sustaining, maintenance and improvement works

Slide 81: Enabling project: Northern Water Project (NWP)
Enabling project: Northern Water Project (NWP) Multi-user facility project led by government with BHP as major offtaker Proposed NWP pipeline route rsonal use only Project overview • Copper SA currently uses ~60 ML/day with ~35 ML/day sourced from the Great Artesian Basin • The Northern Water Projec

Slide 82: Enabling project: Power supply project (PSP)
Enabling project: Power supply project (PSP) Critical enabler of the Copper SA growth program, designed to ensure sufficient and reliable power to support production at Olympic Dam Project overview rsonal use only • We are nearing electricity transmission capacity (300 MW current capacity of the exi

Slide 83: Uranium Expansion (Hydromet)
Uranium Expansion (Hydromet) Brownfield expansion replicates Olympic Dam uranium flowsheet at low cost; increases uranium production capacity to ~6 ktpa U3O8 Project overview rsonal use only • Brownfield uranium expansion within broader MCG program • Expands leaching tailings stream enabling ~15% gr

Slide 84: Competent Person Statement: Copper Mineral Resources
Competent Person Statement: Copper Mineral Resources Copper Mineral Resources Competent Person Statement The information in this slide relates to Copper Mineral Resources as at 1 September 2026. Mineral Resources are inclusive of Ore Reserves and is based on information compiled by Marcelo Cortes as

Slide 85: Competent Person Statement: Copper Mineral Resources
Competent Person Statement: Copper Mineral Resources Compiled Copper Mineral Resources as at 1 September 2026 Measured Resources Indicated Resources Inferred Resources Total Resources Deposit Material type Contained Metal BHP interest % Mt %Cu Mt %Cu Mt %Cu Mt %Cu (Cu kt) rsonal use only Copper oper

Slide 86: Competent Person Statement: Copper South Australia Mineral Resources
Competent Person Statement: Copper South Australia Mineral Resources Compiled Copper Mineral Resources as at 1 September 2026 Measured Resources Indicated Resources Inferred Resources Total Resources Deposit Material type Contained Metal BHP interest % Mt %Cu Mt %Cu Mt %Cu Mt %Cu (Cu kt) rsonal use
Source: ASX announcement, Nov 23, 2026
More decks from BHP Group Ltd
ESG Presentation (September 2026)31 slides · Sep 16, 2026
ESG Presentation (September 2026)29 slides · Sep 16, 2026
FY2026 Earnings Presentation58 slides · Aug 18, 2026
FY2026 Earnings Presentation56 slides · Aug 18, 2026
FY2026 Earnings Presentation44 slides · Aug 18, 2026
Bank of America Global Metals, Mining & Steel Conference 202617 slides · May 12, 2026