Tellurian Inc

Tellurian — Investor Presentation (October 2018)

40 slides from Tellurian's investor presentation, Oct 25, 2018

  1. Slide 1: Corporate presentation October 2018

    Corporate presentation October 2018 Exhibit 99.1

  2. Slide 2: Cautionary statements

    Cautionary statements Forward-looking statements ” within the meaning of Section 278 ites Act of 1933, ded the projects Act of 1934, os omende ingly the nature statements. Lal aa a assume, fi “torecast.” “nol” "intend “model: would.” fs Construction ' recoveries, Projected from retum, . 1417.1 parti

  3. Slide 3: Recent updates

    Recent updates Recent Updates

  4. Slide 4: Driftwood financing update

    Driftwood financing update Recent updates Introducing levered structure Provides Partners with lower equity investment and non-consolidated debt Reduces equity investment to $500 per tonne Driftwood to deliver LNG to Partners for ~$3.00/mmBtu operating cost plus ~$1.50/mmBtu pass through of debt ser

  5. Slide 5: Driftwood Holdings' levered structure

    Driftwood Holdings’ levered structure Recent updates Notes:(1) In Equity structure case, debt service is shown net of revenue from third-party pipeline shippers. (2) FOB cost reflects $1.50/mmBtu debt service cost in Levered structure. (3) Based on assumed U.S. Gulf Coast margin of $3.32/mmBtu, TELL

  6. Slide 6: Driftwood Holdings' financing

    Debt(5) Equity contribution IDC(6) Pre-COD cash flows(7) Lique- faction(1) Owner’s costs(2) Driftwood Holdings’ financing Recent updates Equity structure (previous) $ billions Levered structure (current) $ billions Notes:(1) Based on engineering, procurement, and construction agreements executed wit

  7. Slide 7: Core presentation

    Core presentation Core presentation

  8. Slide 8: Global call on U.S. natural gas

    Global call on U.S. natural gas Fundamentals U.S. supply push… …and global demand pull Source: Wood Mackenzie, Tellurian Research. Notes:(1) Includes the Permian, Haynesville, Utica, Marcellus, Anadarko, and Eagle Ford. (2) Based on an annual demand growth estimate of 4.5% post-2020 for low case and

  9. Slide 9: Global commodity requires low-cost solutions

    Sources:Kpler, Maran Gas, IHS, Wood Mackenzie. Notes: LNG storage assumes half of fleet is in ballast, 2.9 Bcf capacity per vessel. Average cargo size ~2.9 Bcf, assuming 150,000 m3 ship. In 2017, approximately a third of all LNG cargoes are estimated to be spot volumes. Based on line of sight supply

  10. Slide 10: Integrated to manage three risks

    Basin 11,620 Haynesville acres 1.4 Tcf of resource Intend to acquire 15 Tcf Basis ~$7 billion of pipeline projects, providing access to Haynesville, Permian, & Appalachia supply Integrated to manage three risks Business model Construction ~$15 billion liquefaction project in Louisiana

  11. Slide 11: Driftwood LNG terminal

    Driftwood LNG terminal Note:(1)Based on engineering, procurement, and construction agreements executed with Bechtel. Driftwood LNG terminal Land ~1,000 acres near Lake Charles, LA Capacity ~27.6 mtpa Trains Up to 20 trains of ~1.38 mtpa each Chart heat exchangers GE LM6000 PF+ compressors Storage 3

  12. Slide 12: Pipeline network

    Pipeline network Note: (1)Included in Driftwood Holdings at full development; commercial and regulatory processes in progress and financial structuring under review. Pipeline network Driftwood Pipeline(1) Capacity (Bcf/d) 4.0 Cost ($ billions) $2.2 Length (miles) 96 Diameter (inches) 48 Compression

  13. Slide 13: >100 Tcf available resources in Haynesville

    >100 Tcf available resources in Haynesville Upstream resource Sources: IHS Enerdeq; 1Derrick; investor presentations; Tellurian research. Note: (1)Estimated resources based on acreage. Driftwood Holdings plans to fund and purchase 15 Tcf Potential acquisition targets: Range of resources per target (

  14. Slide 14: Expecting to eliminate HH price risk

    Expecting to eliminate HH price risk Business model Source:CME via MarketView. Buy Henry Hub gas when prices are lower than $2.25 (curtail Haynesville drilling) Acquire lower priced gas in other supply basins via Tellurian pipeline network 2010 2011 2012 2013 2014 2015 2016 2017 2018 Henry Hub gas p

  15. Slide 15: Integrated model

    Integrated model Production Company, Pipeline Network, LNG Terminal Variable and operating costs expected to be $3.00/mmBtu FOB Financing ~$8 billion in Partners’ capital through investment of $500 per tonne of LNG ~$20 billion in project finance debt equates to $1.50/mmBtu with interest and amortiz

  16. Slide 16: Driftwood Holdings' financing

    Driftwood Holdings’ financing Business model Full Development Capacity (mtpa) 27.6 Capital investment ($ billions) Liquefaction terminal(1) $ 15.2 Owners’ cost & contingency(2) $ 1.9 Driftwood pipeline(3) $ 2.2 HGAP $ 1.4 PGAP $ 3.7 Upstream $ 2.2 Fees(4) $ 0.9 Interest during construction $ 7.5 Tot

  17. Slide 17: Driftwood Holdings' operating costs

    Driftwood Holdings’ operating costs Business model Sources: Wood Mackenzie, Tellurian Research. Notes: (1)Drilling and completion based on well cost of $10.2 million, 15.5 Bcf EUR, and 75.00% net revenue interest (“NRI”) (8/8ths). (2)Gathering processing and transportation includes transportation co

  18. Slide 18: Margins and price signals

    Margins and price signals Business model Netback prices to the Gulf Coast(1) Sources: Platts, CME, Tellurian Research. Notes: (1) Forward prices for 2018 assuming $2.91/mmBtu shipping cost from USGC to East Asia using Platts JKM. (2) Platts Gulf Coast Marker. 2018 JKM forward strip up $2.33 since No

  19. Slide 19: Returns to Driftwood Holdings' partners

    Returns to Driftwood Holdings’ partners Business model U.S. Gulf Coast netback price ($/mmBtu) $6.00 $8.00 $10.00 $15.00 Driftwood LNG, FOB U.S. Gulf Coast ($/mmBtu) $(4.50) $(4.50) $(4.50) $(4.50) Margin ($/mmBtu) 1.50 3.50 5.50 10.50 Annual partner cash flow(1) ($ millions per tonne) 80 180 290 55

  20. Slide 20: Value to Tellurian Inc.

    USGC netback ($/mmBtu) Margin(1) ($/mmBtu) 2 Plants 5 Plants Annual cash flows(2) ($ millions) Cash flow per share(3) ($/share) Annual cash flows(2) ($/millions) Cash flow per share(3) ($/share) $ 6.00 $ 1.50 $ 235 $ 0.95 $ 905 $ 3.66 $ 8.00 $ 3.50 $ 545 $ 2.21 $2,110 $ 8.55 $10.00 $ 5.50 $ 860 $ 3.

  21. Slide 21: Marketing process – Driftwood Holdings

    Marketing process – Driftwood Holdings Marketing process Activity 2018 Q1 Q2 Q3 Q4 Launch marketing Narrow candidates Negotiate agreements ~35 customers/partners in data room Feb 15 Commercialization by Q4 2018

  22. Slide 22: Tellurian differentiated to provide value

    Tellurian differentiated to provide value Conclusion Management track record at Cheniere and BG Group 43% of Tellurian owned by founders and management Guaranteed lump sum turnkey contract with Bechtel $15.2 billion for 27.6 mtpa capacity FERC scheduling notice indicates final EIS will be received b

  23. Slide 23: Contact us

    Social media Contact us Amit Marwaha Director, Investor Relations & Finance +1 832 485 2004 amit.marwaha@tellurianinc.com Joi Lecznar SVP, Public Affairs & Communication +1 832 962 4044 joi.lecznar@tellurianinc.com Contacts @TellurianLNG

  24. Slide 24: Additional detail

    Additional detail Additional detail

  25. Slide 25: Demand pull

    Demand pull Additional detail Demand outlook Sources: Wood Mackenzie, Tellurian Research. Notes:(1) Assumes 85% utilization rate. (2) Based on assumption that LNG demand grows at 4.5%-9.6% p.a. post-2020. 107-259 mtpa of new liquefaction capacity required by 2025(1) mtpa Under construction In operat

  26. Slide 26: Owning pipeline infrastructure mitigates basis risk

    Owning pipeline infrastructure mitigates basis risk Additional detail Tolling model SPA model Equity model Customer incurs risk Competition between customers for pipeline access leads to hidden costs and higher cost of LNG on the water Developer incurs risk Developer consolidates pipeline transport,

  27. Slide 27: Building a low-cost global gas business

    Building a low-cost global gas business Additional detail June Raise approximately $115 million in public equity March Bechtel invests $50 million in Tellurian Feb/March Announce open seasons for Haynesville Global Access Pipeline and Permian Global Access Pipeline December Raise approximately $100

  28. Slide 28: Funding and ownership

    Funding and ownership Sources (1) ($ millions) Notes:(1) As of August 1, 2018. (2) Excludes 6.1 million preferred shares outstanding. Ownership(1)(2) (%) $576 million 241 million shares Additional detail

  29. Slide 29: Driftwood vs. competitors – cost per tonne

    Driftwood vs. competitors – cost per tonne Sources:Wood Mackenzie, The World Bank, Tellurian Research. Note:(1) Based on Full Development of Driftwood Holdings, inclusive of debt service cost. (2) LNG Canada’s cost per tonne is inclusive of TransCanada’s capex estimate for Coastal GasLink . (3) The

  30. Slide 30: Integrated model prevalent internationally

    Integrated model prevalent internationally Source:IHS. Projects include: Australasia APLNG, Darwin, GLNG, Gorgon, Ichthys, NWS, Pluto, Northwest Shelf, QCLNG, Wheatstone, PNG LNG, Tangguh, Brunei LNG, Donggi-Senoro, MLNG, Yamal LNG Mideast/Africa Angola LNG, EG LNG, Damietta, ELNG, Yemen LNG, Mozamb

  31. Slide 31: Site characteristics determine long-run costs

    Site characteristics determine long-run costs Additional detail Access to power and water Berth over 45’ depth with access to high seas Support from local communities Access to pipeline infrastructure Site size over 1,000 acres Insulated from surge, wind, and local populations Artist rendition

  32. Slide 32: Key terms of EPC agreements with Bechtel

    Key terms of EPC agreements with Bechtel Additional detail Trains 8 4 4 4 20 Storage facilities 2 0 1 0 3 Berths 1 1 1 0 3 Phase 1 Phase 2 Phase 3 Phase 4 Total 11.0 5.5 5.5 5.5 27.6 Capacity

  33. Slide 33: Construction budget breakdown

    Construction budget breakdown Additional detail Notes:Based on Driftwood LNG full development. (1) Includes additional contingency by developer and staffing prior to commencement of operations. (2) Provisional sum includes escalation factor for inflation, insurance, foreign exchange, and other costs

  34. Slide 34: Driftwood Holdings' financing

    Driftwood Holdings’ financing Additional detail 2-Plant Case 3-Plant Case Full Development Capacity (mtpa) 11.0 16.6 27.6 Capital investment ($ billions) Liquefaction terminal(1) $ 7.6 $ 10.3 $ 15.2 Owners’ cost & contingency(2) $ 1.1 $ 1.5 $ 1.9 Driftwood pipeline(3) $ 1.1 $ 1.5 $ 2.2 HGAP(3) $ - $

  35. Slide 35: Corpus Christi LNG and Driftwood LNG examples

    Corpus Christi LNG and Driftwood LNG examples Additional detail Sources:Cheniere Analyst Day presentation (2018) and Tellurian analysis. Notes:(1) Includes approximately $0.4 billion in costs for additional compression on Driftwood pipeline in 3-plant case. (2) For Corpus Christi LNG, combined owner

  36. Slide 36: LNG projects require supply optionality

    LNG projects require supply optionality Additional detail Sources:IHS, DrillingInfo, EIA, Tellurian analysis. 10 mtpa plant with 1.5 bcf/d feedgas requirement stresses basin supply

  37. Slide 37: Production Company strategy

    Production Company strategy Acquire and develop long-life, low-cost natural gas resources Low geological risk Scalable position Production of ~1.5 Bcf/d starting in 2022 Total resources of ~15 Tcf for Phase 1 Operatorship Low operating costs Flexible development Initially focused on Haynesville basi

  38. Slide 38: Haynesville type curve comparison

    Haynesville type curve comparison Comparative type curve statistics Cumulative production normalized to 7,500’(3) Source:Company investor presentations. Notes:(1) Assumes 75.00% net revenue interest (“NRI”) (8/8ths). (2) Assumes gas prices of $3.00/mcf based on NRI and returns published specific to

  39. Slide 39: U.S. natural gas needs global market access

    13 Bcf/d 4 4 7 1 3 U.S. natural gas needs global market access Additional detail 13 Bcf/d of incremental production; associated gas at risk of flaring without infrastructure investment Sources: EIA; ARI; Tellurian analysis. Note:(1) $1,000 per tonne average. LNG export capacity required: At least 10

  40. Slide 40: PGAP connects constrained gas to SWLA

    PGAP connects constrained gas to SWLA Additional detail Takeaway constraints in the Permian Southwest Louisiana demand Sources:Company data, Goldman Sachs, Wells Fargo Equity Research, RBN Energy, Tellurian estimates. Notes:(1) LNG demand based on ambient capacity (2) Includes Driftwood LNG, Sabine

Tellurian — Investor Presentation (October 2018) on 6ix