12 slides from Alligator Energy's conference presentation, Nov 15, 2023
Slide 1: Global Uranium Conference November 2023
ASX: AGE For personal use only Global Uranium Conference November 2023
Slide 2: Disclaimer
Disclaimer Disclaimer This presentation contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current For personal use only expectations involving
Slide 3: Project Pipeline
Project Pipeline EARLY-STAGE PROSPECTIVE DEVELOPMENT For personal use only CONCEPTUAL GREENFIELD GREENFIELD POTENTIAL BIG LAKE NABARLEK TIN CAMP SAMPHIRE Analogous to NORTH CREEK Blackbush Hydro-carbon Basins - U40 Nearology Caramal Resource 18.1 Mlb ISR Kazak & Wyoming Amenable Resource STRATEGIC P
Slide 4: Project - Overview
Samphire Uranium Project - Overview • 20km south of Whyalla For personal use only • Previously the focus of work by UraniumSA between 2009 and 2012 – drilled over 500 drillholes. AGE acquired the project in late 2020. • One uranium deposit (Blackbush,18.1Mlbs U3O8(1)) and historical prospect (Plumbu
Slide 5: Geology
For personal use only Samphire Uranium Project - Geology 5 Corporate Presentation | November 2023 | ASX:AGE
Slide 6: Project: Mineral Resource Estimates
Samphire Uranium Project: Mineral Resource Estimates • Initial ISR Mineral Resource Estimate (August 2022) for the Blackbush Deposit of 14.8 Mlbs (combined Inferred and Indicated) for a cut-off grade of 250ppm U3O8. For personal use only • Increased to 18.1 Mlbs U3O8 (March 2023) following additiona
Slide 7: Project – Resource Growth at Blackbush
Samphire Uranium Project – Resource Growth at Blackbush • Coherent multi-level high-grade zones with cumulative strike length of >2,700m and width For personal use only between 300-450m. 7 Corporate Presentation | November 2023 | ASX:AGE
Slide 8: Project – Field Recovery Trial
Samphire Uranium Project – Field Recovery Trial Field Recovery Trial for 1H of 2024* to confirm parameters to be used in a full feasibility study during 2024. * On receipt of all regulatory approvals For personal use only • FRT will finalise in-situ chemistry, hydrogeology, uranium recovery, environ
Slide 9: Scoping Study: Key Metrics
For personal use only Samphire Uranium Project Scoping Study: Key Metrics A$129.3 m 3.5 years 29% A$152.0 m US$30.20 /lb US$17.9 /lb CAPEX Payback IRR* NPV8* AISC Cash Costs (including contingency) (post-tax, real, ungeared) (post-tax, real, ungeared) (A$ 43.2 /lb) (A$25.6 /lb) *Calculated using US$
Slide 10: Project – Exploration
Samphire Uranium Project – Exploration Local and district-scale resource growth potential For personal use only • Plumbush Deposit not adequately tested nor is its relationship to Blackbush Deposit known. • High-resolution ground gravity acquired (Sept 2022) to improve palaeochannel resolution. • Re
Slide 11: Project: Next steps
Samphire Uranium Project: Next steps Intention to rapidly progress next steps DECEMBER 2023 For personal use only FABRICATION OF CONTAINERISED PILOT PLANT COMPLETE COMMENCE FIELD Q4 2024 Q1 2025 NOVEMBER 2023 RECOVERY TRIAL (FRT) FURTHER RESOURCE INITIAL CONDITIONAL SCOPING STUDY UPDATE (Subject to