  1. Slide 1: Global Uranium Conference November 2023

    ASX: AGE For personal use only Global Uranium Conference November 2023

  2. Slide 2: Disclaimer

    Disclaimer Disclaimer This presentation contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current For personal use only expectations involving

  3. Slide 3: Project Pipeline

    Project Pipeline EARLY-STAGE PROSPECTIVE DEVELOPMENT For personal use only CONCEPTUAL GREENFIELD GREENFIELD POTENTIAL BIG LAKE NABARLEK TIN CAMP SAMPHIRE Analogous to NORTH CREEK Blackbush Hydro-carbon Basins - U40 Nearology Caramal Resource 18.1 Mlb ISR Kazak & Wyoming Amenable Resource STRATEGIC P

  4. Slide 4: Project - Overview

    Samphire Uranium Project - Overview • 20km south of Whyalla For personal use only • Previously the focus of work by UraniumSA between 2009 and 2012 – drilled over 500 drillholes. AGE acquired the project in late 2020. • One uranium deposit (Blackbush,18.1Mlbs U3O8(1)) and historical prospect (Plumbu

  5. Slide 5: Geology

    For personal use only Samphire Uranium Project - Geology 5 Corporate Presentation | November 2023 | ASX:AGE

  6. Slide 6: Project: Mineral Resource Estimates

    Samphire Uranium Project: Mineral Resource Estimates • Initial ISR Mineral Resource Estimate (August 2022) for the Blackbush Deposit of 14.8 Mlbs (combined Inferred and Indicated) for a cut-off grade of 250ppm U3O8. For personal use only • Increased to 18.1 Mlbs U3O8 (March 2023) following additiona

  7. Slide 7: Project – Resource Growth at Blackbush

    Samphire Uranium Project – Resource Growth at Blackbush • Coherent multi-level high-grade zones with cumulative strike length of >2,700m and width For personal use only between 300-450m. 7 Corporate Presentation | November 2023 | ASX:AGE

  8. Slide 8: Project – Field Recovery Trial

    Samphire Uranium Project – Field Recovery Trial Field Recovery Trial for 1H of 2024* to confirm parameters to be used in a full feasibility study during 2024. * On receipt of all regulatory approvals For personal use only • FRT will finalise in-situ chemistry, hydrogeology, uranium recovery, environ

  9. Slide 9: Scoping Study: Key Metrics

    For personal use only Samphire Uranium Project Scoping Study: Key Metrics A$129.3 m 3.5 years 29% A$152.0 m US$30.20 /lb US$17.9 /lb CAPEX Payback IRR* NPV8* AISC Cash Costs (including contingency) (post-tax, real, ungeared) (post-tax, real, ungeared) (A$ 43.2 /lb) (A$25.6 /lb) *Calculated using US$

  10. Slide 10: Project – Exploration

    Samphire Uranium Project – Exploration Local and district-scale resource growth potential For personal use only • Plumbush Deposit not adequately tested nor is its relationship to Blackbush Deposit known. • High-resolution ground gravity acquired (Sept 2022) to improve palaeochannel resolution. • Re

  11. Slide 11: Project: Next steps

    Samphire Uranium Project: Next steps Intention to rapidly progress next steps DECEMBER 2023 For personal use only FABRICATION OF CONTAINERISED PILOT PLANT COMPLETE COMMENCE FIELD Q4 2024 Q1 2025 NOVEMBER 2023 RECOVERY TRIAL (FRT) FURTHER RESOURCE INITIAL CONDITIONAL SCOPING STUDY UPDATE (Subject to

  12. Slide 12: For personal use only

    For personal use only ASX: AGE Dr Andrea Marsland-Smith COO +61 (0) 7 3839 3904 ams@alligatorenergy.com.au www.alligatorenergy.com.au