Pure Gold Mining — Investor Presentation (August 2021)
26 slides from Pure Gold Mining's investor presentation, Aug 3, 2021
Slide 1: Canada's Newest High Grade Gold Producer
Canada’s Newest High Grade Gold Producer
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS This Presentation contains forward‐looking statements, including but not limited to statements Alternative performance measures are furnished to provide additional information. These non- Neither this presentation nor any copy hereof may be distributed in any other jurisdi
Slide 3: PureGold is Canada's newest high grade gold producer
PureGold is Canada’s newest high grade gold producer. We’ll be here for a long time.
Slide 4: Welcome to the Heart of Red Lake, Canada's High Grade Gold District
WELCOME TO THE HEART OF RED LAKE CANADA’S HIGH GRADE GOLD DISTRICT LOCATION RED LAKE GOLD DISTRICT >30 M oz +16 g/t Average gold head Historic production grade 100 years +US$50 B A century of gold Total value of gold production mined to date 1 2 3000 m Producing gold Depth of mining mines (we own on
Slide 5: Our Growth Plan: Phased Organic Development Strategy
OUR GROWTH PLAN PHASED ORGANIC DEVELOPMENT STRATEGY Dream Phase 3 ✓ Expansion Big. Phase 2 Target: +200 koz/yr Game-Changing Optimization +1600 tpd Phase 1 Exploration Potential Feasibility Study Target: +100 koz/yr • Expand current mine and mill 800-1000 tpd • Extend known zones vertically • Along
Slide 6: Building an Iconic Canadian Gold Company: Key Building Blocks in Place
BUILDING AN ICONIC CANADIAN GOLD COMPANY KEY BUILDING BLOCKS IN PLACE The PureGold Mine represents a unique combination of world-class exploration potential, low geopolitical risk, derisked operations, expansion potential, and ESG-friendly attributes to ensure long-term viability and sustainability.
Slide 7: The PureGold Mine is now in commercial production
The PureGold Mine is now in commercial production. Our growth story has only just begun.
Slide 8: Commercial Production Achieved: Another Significant Milestone
COMMERCIAL PRODUCTION ACHIEVED ANOTHER SIGNIFICANT MILESTONE PUREGOLD MINE SIGNIFICANT DE-RISKING MILESTONES TO DATE ✓ Excellent grade reconciliation to Mineral Reserves from stopes mined ✓ Successful high-grade production using multiple mining methods ✓ Underground drilling continuing to confirm ne
Slide 9: PureGold Entering Growth Phase: Key Indicators Trending Positively
PUREGOLD ENTERING GROWTH PHASE KEY INDICATORS TRENDING POSITIVELY MAIN RAMP DEVELOPMENT RATE NUMBER OF ACTIVE ORE HEADINGS (END OF PERIOD) 10 20 9.7 # of Headings 8 Metres/Day 8.1 15 17 Main 6 Dev't 10 13 12 East 4 5.2 Stopes 10 4.7 4.5 Total 2 3.4 Total 5 3 5 0 0 Q1 2021 Q2 2021 Q1 2021 Q2 2021 AVE
Slide 10: Mine Positioned Well for Strong H2 2021
MINE POSITIONED WELL FOR STRONG H2 2021 KEY INVESTMENTS TO UNLOCK NEAR-TERM AND LONG-TERM BENEFITS PHASE 2 MINING INITIATIVES TIMING / BENEFITS PLANNED MINE DEVELOPMENT 2021 • Immediately increase stope availability and East Ramp mine planning First High-Grade flexibility Stopes Now Online Active Mi
Slide 11: Mill Positioned Well for Strong H2 2021
MILL POSITIONED WELL FOR STRONG H2 2021 KEY INVESTMENTS TO UNLOCK NEAR-TERM AND LONG-TERM BENEFITS 800 TPD MILLING FACILITY PHASE 2 MILL INITIATIVES TIMING / BENEFITS CIP Tank Interstage Screens • Interstage and trommel screen installation currently underway • Improve overall stability of processing
Slide 12: We control 47 km2 of the most valuable gold real estate in Red Lake
We control 47 km2 of the most valuable gold real estate in Red Lake. And we’ve barely scratched the surface. 12
Slide 13: Near-Mine Discoveries to Fuel Future Growth
NEAR-MINE DISCOVERIES TO FUEL FUTURE GROWTH OVER 1 MILLION OUNCES OUTSIDE CURRENT MINE PLAN CURRENT RESOURCE ESTIMATE SATELLITE DEPOSITS Russet 2.1 Moz 1200m 1100m Indicated Resource 1 800m 0.5 Moz East Inferred Resource 1 Wedge Fork Main Shaft Ramp Ramp Mill Resource Update Expected Q3 2021 (1) Min
Slide 14: Deep Understanding, Proven Exploration Model
DEEP UNDERSTANDING, PROVEN EXPLORATION MODEL SURFACE EXPLORATION TARGETING NEW HIGH GRADE DISCOVERIES ACTIVE SURFACE EXPLORATION TARGETS DERLAK • Targeting depth extension of Main GAP resource supported by detailed • Targeting 8-Zone style blue- seismic grey quartz veins in strongly • Limited drilli
Slide 15: Red Lake Systems Have Deep Roots
RED LAKE SYSTEMS HAVE DEEP ROOTS WE’VE GOT 3000 METRES AND 100 YEARS TO GO 1200 2.1 Moz M&I 1 metre 0.5 Moz Inferred 1 depth 2.5 Moz past production 8 Zone (1) Mineral Resources are inclusive of Mineral Reserves; see Page titled ‘Mineral Reserves & Resources’ for full report tables 15
Slide 16: Red Lake Systems Have Deep Roots
RED LAKE SYSTEMS HAVE DEEP ROOTS WE’VE GOT 3000 METRES AND 100 YEARS TO GO 1200 2.1 Moz M&I 1 metre 0.5 Moz Inferred 1 depth 2.5 Moz past production 1995 8 Zone HGZ Discovery AD-11-01 14.3 g/t Au / 2.0m Evolution’s current mine plan to ~3000 m depth Note: Conceptual mineralization shapes indicated a
Slide 17: High Grade 8-Zone: Our Potential Game Changer
HIGH GRADE 8-ZONE OUR POTENTIAL GAME CHANGER Goldcorp PureGold HGZ Discovery 8-Zone (1995) • Quartz veins in • Quartz veins in Geologic flexure along flexure along 8-Zone Setting mafic-ultramafic mafic-ultramafic contact contact Key Drill • 4.3m at 466 g/t Au • 9 holes averaging 8-Zone Intercepts •
Slide 18: Near-Term Outlook: Key Catalysts in 2021
NEAR-TERM OUTLOOK KEY CATALYSTS IN 2021 Q4 2021 • Continue to optimize mine and mill August 2021 performance and throughput • Interstage screens • Initiate engineering work for mine and and trommel screen Ongoing mill expansion and satellite deposits to be installed in mill • Exploration • Potential
Slide 19: Our growth story has only just begun
Our growth story has only Just Begun.
Slide 20: Positioned to Be an ESG Leader
POSITIONED TO BE AN ESG LEADER The PureGold Mine is well positioned to be a leader in the gold industry with respect to ESG and carbon footprint with many natural advantages. Strong local relationships and Small surface footprint Hydroelectric grid power Landmark First Nations Agreement Opportunity
Slide 21: Landmark First Nations Agreements
LANDMARK FIRST NATIONS AGREEMENTS Our Landmark Project Agreement with respect to the PureGold Mine with the Waubaskang and Lac Seul First Nations establishes a long-term, mutually beneficial partnership between PureGold and the First Nations. OPPORTUNITY CREATION EQUITY PARTICIPATION COOPERATION EDU
Slide 22: You're in Good Company
YOU’RE IN GOOD COMPANY KEY STRATEGIC SHAREHOLDERS Eric Sprott #3 Gold Producer in World $30 Million Investment Cornerstone Investor 22
Slide 23: PureGold Leadership Team
PUREGOLD LEADERSHIP TEAM OVER 135 YEARS OF COMBINED RED LAKE EXPERIENCE Board of Directors Executive Management PureGold Mine Site • Graeme Currie, Chairman • Darin Labrenz, President & CEO • Eric Setchell, Mine General Manager • Mark O’Dea, Director • Sean Tetzlaff, CFO & Corporate Secretary • Davi
Slide 24: Corporate Snapshot
PUREGOLD MINING INC ANALYST COVERAGE CORPORATE SNAPSHOT CAPITAL STRUCTURE 1 Basic Shares Outstanding 413.7 million Warrants 32.4 million Exercise price $0.85, July 18, 2022 expiry ITM Options Outstanding 11.9 million Fully Diluted ITM Shares Outstanding 460.0 million including 1.0M RSUs and 1.1M DSU
Slide 25: Mineral Resources & Reserves: PureGold Mine
MINERAL RESOURCES & RESERVES PUREGOLD MINE MINERAL RESOURCES 1 Indicated Inferred Grade Contained Grade Contained Deposit Tonnes (kt) Deposit Tonnes (kt) (g/t Au) (koz Au) (g/t Au) (koz Au) Madsen 6,429 9.0 1,857 Madsen 889 8.4 241 Fork 203 6.6 43 Fork 331 5.8 61 Russet South 241 7.2 56 Russet South
Slide 26: Thank you
Thank you. Corporate Inquiries Corporate Address TSX.V:PGM , LSE:PUR Darin Labrenz 1900 – 1055 West Hastings Street President & CEO Vancouver, BC OTCMKTS:LRTNF V6E 2E9 www.puregoldmining.ca 604 646 8000 info@puregoldmining.ca
PureGold Mining — Investor Presentation (August 2021) on 6ix