Bayswater Uranium — Investor Presentation (January 2007)
38 slides from Bayswater Uranium's investor presentation, Jan 15, 2007
Slide 1: Bayswater Uranium
ZN BAYSWATER CHO REO RA. ELON TSX.V: BAY FWB: B2V
Slide 2: Corporate Overview
Corporate Overview • Canadian based exploration company • Listed on TSX-V (BAY) and Frankfurt (B2V) Shares Outstanding: 71,442,408 Significant Shareholders Fully Diluted: 96,242,221 Management: 5.0 million Cash position: $11,000,000 Longview Capital: 4.0 million Cash position, FD: $18,370,000 Instit
Slide 3: Property Portfolio
Property Portfolio Uranium Projects – Underexplored Properties in Key Uranium Belts • Central Mineral Belt, Labrador 1,041,000 acres (4215 km2) • Athabasca Basin, Saskatchewan 1,508,000 acres (6100 km2) • North Thelon Basin, Nunavut ..853,000 acres (3455 km2) • South Thelon Basin, NWT 2,810,000 acre
Slide 4: Central Mineral Belt Uranium Project, Labrador
Central Mineral Belt Uranium Project, Labrador • 4215 km2 land holding • Olympic Dam and Rossing type targets • Known Olympic Dam type deposits and prospects – i.e. • Michelin - Resources: 22.2 million pounds U3O8 in M&I 13.4 million pounds U3O8 Inferred 2. Moran Lake - Resources: 688,000 pounds U3O
Slide 5: Geology and Uranium Deposits and Prospects - CMB
Geology and Uranium Deposits and Prospects - CMB 1. IOCG/structural Targets (Historic U belt) • Favorable geological and structural extensions to known IOCG deposits and prospects 2. Rossing Targets (Northern Claim Blocks) • Favourable intrusive bodies • Favourable structural setting
Slide 6: Anomalies in Lake Sediment Samples - CMB
Anomalies in Lake Sediment Samples - CMB • Association of U in lake sediments with geologic structure • Extensive lake sediment U-Cu-Ag-Fe anomalies • Anomalous samples (BAY claims only) Range ~# Samples U 10-141ppm 174 Cu 50-230ppm 57 Ag 0.3-0.9ppm 71 Fe 5.0-14.2% 55
Slide 7: Results of 2006 Radiometric Survey & Prospecting - CMB
Results of 2006 Radiometric Survey & Prospecting - CMB • 13 U and/or REE prospects/ targets discovered, including: • 6 U mineralized zones in bedrock (Rossing type:Kanairiktok/Dandy) (Fault controlled: Stipec River) • 1 light REE mineralized pegmatite area in bedrock with five samples 0.12 to 1.4% (
Slide 8: Results of 2006 Magnetic Survey - CMB
Results of 2006 Magnetic Survey - CMB Historic Uranium District (IOCG/Structural Model) • Indicates favorable fault structures (Ghost Lake/ Stipec River) • Linear highs, reflecting lithology, associated with some U prospects (Anna Lake) North Claim Blocks • Patterns reflect favorable granite-gneiss
Slide 9: Anna Lake U Prospects - CMB
A BAYSWATER Uranium CORPORATION Airborne U Radiometric: Bayswater: 7 boulders Best Assays: 0.357% U308, 0.261% U308, 0.132% U308 © Brinco: >2000 boulders W Best 8 Assays: 1.0% to 2.43% U308 0.04% U308 / 7.5m 0.118% U308 / 1.5m pea] ODH ANS1-4 0.10% U308 / 2.0m —_- Bayswater: 7 boulders Best Assays:
Slide 10: Stipec River U Prospects – CMB (Structural Type)
Stipec River U Prospects – CMB (Structural Type)
Slide 11: Dandy – Kanairiktok Bay U Prospects – CMB
Dandy – Kanairiktok Bay U Prospects – CMB
Slide 12: Work Program and Budget
Central Mineral Belt Uranium Project, Labrador Work Program and Budget - 2006 - • NI 43-101 completed Mar. 20th • NI 43-101 updated Sept. 8th • Data Compilation Apr. – Aug. • Airborne Mag/Radiometrics (41,000 km) Jul. 1st – Sept. 5th • Follow-up Prospecting Jul. 1st – Oct. 15th • Budget: $3.5 millio
Slide 13: Athabasca Basin Uranium Project
Athabasca Basin Uranium Project • Premier region in the world for large high-grade unconformity-type U deposits: MacArthur River (proven reserve grade @ 24.38%) Cigar Lake (proven reserve grade @20.67%) • Basin produces 32% of global U supply
Slide 14: Athabasca Basin Uranium Project
Athabasca Basin Uranium Project • 1,700,000 acres in three blocks • Unconformity-type targets • Major basement fault structures • Favorable basement conductors known to northeast on Strathmore ground • Close proximity to major U deposits and prospects
Slide 15: Athabasca Basin Uranium Project
Athabasca Basin Uranium Project • Cluff Lake Mine - produced 62.5 million pounds U308 • Shea Creek deposits- high grade drill results: up to 12.6% U308 over 11.9m • Depth to basement comparable to near-by U properties (400- 1000m) • Regional low magnetics • NW-SE cross faulting
Slide 16: Work Program and Budget
Athabasca Basin Uranium Project Work Program and Budget - 2006 - • Data Compilation Oct. 2006 • Analysis of published geophysics Oct. 2006 • Budget: $30,000 - 2006 to 2007 - • Airborne VTEM survey Jan • Ground follow-up geophysics Spring • Drilling Fall • Budget: $4.5 million
Slide 17: Thelon Basin Uranium Projects
Thelon Basin Uranium Projects • Aggregate of 3,663,000 acres • Unconformity-type targets North • Major sandstone basin Kiggavik Trend with analogous characteristics to prolific South Athabasca Basin • Highly under-explored • Cogema’s Kiggavik Trend unconformity deposits contain approx. 131 million p
Slide 18: North Thelon Basin Uranium Project
North Thelon Basin Uranium Project • 853,000 acres in 7 blocks • Favourable Kiggavik trend and Amer Group • Major structures • Known U North Thelon Project occurrences in region South Thelon Project • Radioactive 0 kilometres 100 boulder trains Kiggavik Trend
Slide 19: North Thelon Basin Uranium Project – Airborne Surveys
North Thelon Basin Uranium Project – Airborne Surveys
Slide 20: Kigg Airborne Survey – N. Thelon
Kigg Airborne Survey – N. Thelon
Slide 21: Permit 1 Airborne Survey – N. Thelon
Permit 1. Airborne Survey – N. Thelon
Slide 22: Itza/Permit 2 Airborne Survey – N. Thelon
Itza/Permit 2 Airborne Survey – N. Thelon
Slide 23: Amer Airborne Survey – N. Thelon
Amer Airborne Survey – N. Thelon
Slide 24: Work Program and Budget
North Thelon Basin Uranium Project Work Program and Budget - 2006 - • Data Compilation May – Jul. • 21,000 line km Airborne Mag/Radiometrics Survey Jul. 15th – Sept. 10th • Preliminary follow-up prospecting Sept. 18th • Analysis of published geophysics November • Budget: $550,000 - 2007 - • Prospect
Slide 25: South Thelon Basin Uranium Project
South Thelon Basin Uranium Project • 2,810,057 acres in two blocks Northwest Block – Northwest Block (377,048 acres) Southeast Block – Southeast Block (2,433,009 acres) • Favourable Boomerang trend and Amer Group • Major basement structures • High grade U prospects on properties • Boulder trains ind
Slide 26: 2006 Airborne Magnetics (TC) – South Thelon
2006 Airborne Magnetics (TC) – South Thelon
Slide 27: Work Program and Budget
South Thelon Basin Uranium Project Work Program and Budget - 2006 - • Data Compilation May • MegaTem Survey (8,000 line km) Jul. – Aug. • Analysis of published geophysics Nov. • Budget: $2.0 million - 2007 - Basin Margin Claims: • Airborne mag/radiometrics survey and follow-up detailed prospecting,
Slide 28: Hermitage Uranium Project, NFLD
Hermitage Uranium Project, NFLD • 418,000 acre property • Stratiform sandstone Hermitage Uranium Property, NFLD targets • Prospective for large open-pit style uranium deposits • Under-explored • Known U occurrences in belt, including up to 2.79% U308 in boulders • Good infrastructure Uranium Prospec
Slide 29: Hermitage Uranium Project, NFLD
Hermitage Uranium Project, NFLD Hermitage West Hermitage Property Airborne Radiometrics Uranium Hermitage East • 8 Zones delineated containing 460 Priority Targets • Ground follow-up on-going
Slide 30: Work Program and Budget
Hermitage Uranium Project, NFLD Work Program and Budget - 2006 - • Airborne Rad/Mag/E.M. Survey June – Jul. • Geological mapping and prospecting Aug. – Oct. • Budget: $800,000 - 2007 - • Airborne survey of balance of landholdings, follow-up prospecting, mapping and ground geophysics and drilling Sum
Slide 31: Niger Uranium Project
Niger Uranium Project • Third largest U producer Arlit – Cominak Mine Area • Fourth largest U reserves • 30 years of stable production Concession Application Areas
Slide 32: Niger Uranium Project Tim Mersoi Basin
Niger Uranium Project Tim Mersoi Basin Tikikitene • Up to 6,000 km2 land applications • Favourable structural Uranium Deposits and stratigraphic settings Eghizi • Near Cogema-Onarem Arlit & Cominak mines • Sandstone targets Anwala
Slide 33: Work Program and Budget
Niger Uranium Project Work Program and Budget - 2006 - • Concessions granted Oct. – Dec. • Compilation Oct. – Dec. • Budget: $250,000 - 2007 - • Airborne mag/radiometrics Spring • Follow-up prospecting Summer • Budget: $1.8 million
Slide 34: Avoca Mine Base Metal Project, Ireland
Avoca Mine Base Metal Project, Ireland • VMS system with high grade intersections in several holes: – 4 to 8 metres of 10-16% zinc, 5-7% lead, 64- 284 g/t silver and 0.15-4.5 g/t gold • Laterally-zoned Cu-to-Zn/Pb, both ±Au/Ag • 16 million tonnes mined near surface, with estimated – 700 m lbs Zn – 2
Slide 35: Work Program and Budget
Avoca Mine Base Metal Project, Ireland Work Program and Budget - 2006 – • Ground I.P. Survey May • Budget: $500,000 - 2007 - • Spin off asset into related company • Drill testing of deep and shallow targets by related company • Budget for Bayswater Nil
Slide 36: Exploration Summary
Exploration Summary Project Summary 2006 Budget 2007 Budget Labrador 4215 km2 $3,500,000 $5,600,000 Athabasca 6100 km2 $30,000 $4,500,000 North Thelon 3455 km2 $550,000 $1,300,000 South Thelon 11,370 km2 $2,000,000 $6,800,000 Hermitage 1690 km2 $800,000 $500,000 Niger 4000 to 8000 km2 $250,000 $1,80
Slide 37: Strategies/Summary
Strategies/Summary ¾ Acquire high impact uranium exploration projects ¾ Aggressive exploration campaigns ¾ Aggressive/opportunistic M&A activities ¾ Largest landholder in 3 of 4 of the most prospective/highest producing uranium areas in Canada - the #1 U producer in the world ¾ Experienced, world cl
Slide 38: Bayswater
ZN BAYSWATER CHO REO RA. ELON TSX.V: BAY FWB: B2V
Bayswater Uranium — Investor Presentation (January 2007) on 6ix