  1. Slide 1: Critical Mineral Processing Hubs

    CRITICAL MINERAL PROCESSING HUBS what OPTIMIZING ASSETS FOR U.S. MINERAL INDEPENDENCE COUNTERING CHINA COMPETITION SEPTEMBER 2025 Page 1

  2. Slide 2: Message from Our CEO

    USGS IDENTIFIED TAILING SITES ACROSS THE UNITED STATES MESSAGE FROM OUR CEO CHARTING A COURSE FOR U.S. STRATEGIC MINERAL INDEPENDENCE The United States faces a dual national security and energy emergency driven by dependence on foreign nations for critical minerals—materials essential to defense, cl

  3. Slide 3: Forward Looking Statement

    FORWARD LOOKING STATEMENT THE FINE PRINT This document contains forward-looking statements within the scope of the safe harbor provisions as established by the U.S. Private Securities Litigation Reform Act of 1995. These forward-looking statements, excluding historical facts, represent the American

  4. Slide 4: Millers Site - Phase 1

    MILLERS SITE - PHASE 1 NEVADA WILL ESTABLISH OUR HUB MODEL STEP 1 Identify additional legacy tailing deposits encircling the geographic Hub location and secure access to the revenue-proven deposits STEP 2 Connect for power = 200-ton-per-day mill Finalize power enhancements/connections on the propert

  5. Slide 5: Millers Site Defined

    MILLERS SITE DEFINED SCOPE & RAW MATERIALS PROPERTY 16 km (10 miles) west of Tonopah in west central Nevada, spans 495 hectares (1,223 acres) and is surrounded by land administered by the federal Bureau of Land Management. SOURCE The tailings at Millers were sourced entirely from the Tonopah mining

  6. Slide 6: Site Strategic Advantages

    SITE STRATEGIC ADVANTAGES LOGISTICS, AQUIFER ACCESS, POWER HWY 95 HAWTHORN GATEWAY TO GEOTHERMAL AMERICA’S RAILWAY GREENLINK WEST RESERVOIR LITHIUM HUB Our location is not just about the tangible assets we hold, but also about the strategic advantages that position us uniquely in the market. Millers

  7. Slide 7: Millers Survey

    MILLERS SURVEY MILLERS TAILING PROJECT This slide presents a certified surveyor’s map of our property, offering a detailed view of our extensive physical assets and their strategic layout, which forms the backbone of our operational capabilities. Page 7

  8. Slide 8: Nevada - ACRG Economic Model

    CURRENT ECONOMIC REALITY NEVADA - ACRG ECONOMIC MODEL Fewer than 1,000 residents Poverty rates are nearing 20% MILLERS HUB, ESMERALDA COUNTY, NV Each Hub will transform mine-scarred rural lands into productive industrial Aging population economic development zones while breaking U.S. dependence on f

  9. Slide 9: Millers Site - Permitting

    MILLERS SITE - PERMITTING TAILINGS PROCESSING PERMITTING ANALYSIS NEXUS 7 ELEMENTS FORMED EARLY AGENCY COORDINATION EFFORTS BASELINE ENVIRONMENTAL STUDIES NDEP PERMIT APPLICATIONS, FEDERAL STAKEHOLDER ENGAGEMENT COMPLIANCE COMPLETE, FINANCIAL TECHNICAL PREPARATION ASSURANCE NDEP Reclamation Permit N

  10. Slide 10: ACRG Capital / Cost Share Model

    ACRG CAPITAL / COST SHARE MODEL PROJECTED FINANCIALS - REVENUE & NET INCOME MILLERS SITE - FINANCIAL PROJECTIONS - 5 YEAR ANALYSIS REVENUES 2026 2027 2028 2029 2030 2031 Tailings Processing - 200 Tons Per Day $5,475,000 $7,446,000 $7,594,920 $7,746,818 $7,901,755 $8,059,790 Tailings Processing - 1,0

  11. Slide 11: Doré Offtakers - Target Sectors

    ROYALTY, STREAMING, DORÉ OFFTAKERS - 3 TARGET SECTORS TRADING As a reliable producer of critical mineral, ACRG will integrate into domestic supply chains that FRANCO-NEVADA CORP activate the government's desire to enhance critical mineral independence. Through multiple World’s largest gold-focused r

  12. Slide 12: Nexus Elements

    NEXUS 7 ELEMENTS ACRG & ENERG4'S JOINT VENTURE- DEC 2025 The joint venture combines ACRG’s feedstocks and operational expertise with Energ4's patented Clean Mineral Processing – CHIPS™ (Chemelectrosonication Ionization Precipitation System) technology for extracting rare earth elements from existing

  13. Slide 13: The Plan - Phase 2

    THE PLAN - PHASE 2 CRITICAL MINERAL PROCESSING HUBS ACRG will establish Critical Mineral Processing Hubs across additional states with concentrations of legacy mine waste and strategic minerals, beginning with Arizona, Colorado, Utah, and New Mexico. This will create a connected national network of

  14. Slide 14: Phase 2 Economic Plan by State

    PHASE 2 ECONOMIC PLAN BY STATE ARIZONA, COLORADO, UTAH, NEW MEXICO - CRITICAL MINERAL PROCESSING HUBS ARIZONA Arizona's history in copper and critical mineral production, along with its involvement in clean energy and defense industries, positions it as a prime candidate for ACRG's Critical Mineral

  15. Slide 15: Supporting Executive Orders

    SUPPORTING EXECUTIVE ORDERS EO 14154-“Unleashing American Energy” Remove Energy Barriers Boost Domestic Processing Relieve EV & Environmental Review Target the Social Cost of Carbon Agency Guidance and Implementation EO 14156-“Declaring a National Energy Emergency/Critical Minerals Emphasis” Federal

  16. Slide 16: Supporting Executive Orders

    SUPPORTING EXECUTIVE ORDERS EO 14261-“Coal Designated as a Mineral” Expedited Permitting Identify Coal on Federal Lands and Remove Barriers to Production Advance Coal Emerging Industries and Technologies Expand Coal Support Through Financial Tools EO 14272-“National Security & Economic Resilience Th

  17. Slide 17: Supporting Executive Orders

    SUPPORTING EXECUTIVE ORDERS CONGRESS P.L. 118-233 - “Importance of Critical Minerals in Healthcare” Interior Secretary to Consult Alongside Agriculture Designating Critical Minerals Integrates Healthcare Considerations Into Strategic Mineral Designation Policy CONGRESS P.L. 119-21 - “One Big Beautif

  18. Slide 18: Contact Us

    CONTACT US +1.720.458.1124 ir@acrgincorp.com 12567 West Cedar Drive, Lakewood,CO 80228 USA Page 18