Mandrake Resources Ltd · ASX:MAN

Mandrake Resources — Investor Presentation (April 2022)

12 slides from Mandrake Resources's investor presentation, April 2022

  1. Slide 1: April 2022 Presentation

    April 2022 Presentation ASX: MAN www.mandrakeresources.com.au

  2. Slide 2: Disclaimers and Disclosures

    Disclaimers and Disclosures This presentation has been prepared by Mandrake Resources Limited (MAN). This Presentation is provided on the basis that neither the Company nor its representatives make any warranty (express or implied) as to the accuracy, reliability, relevance or completeness of the ma

  3. Slide 3: Corporate Snapshot

    Corporate Snapshot Key Metrics Shareholders ASX Code MAN BNP Paribas Nominees Pty 8.6% Shares on issue 493m Sandhurst Trustees Ltd 4.0% Unlisted options 41m (3c exercise) Citicorp Nominees Pty Ltd 3.2% Share price $0.06 Martini 29 Pty Ltd 2.4% Market Capitalisation $29.6m Loktor Holdings Pty Ltd 2.3

  4. Slide 4: Board of Directors

    Board of Directors James Allchurch Lloyd Flint Roger Fitzhardinge Managing Director Non-Executive Chairman Non-Executive Director Mr Allchurch is a geologist with over 20 years’ Mr Flint, BAcc, FINSIA and MBA Mr Fitzhardinge is a geologist with more than experience in mineral exploration, geotechnic

  5. Slide 5: Delfin Copper Project

    Delfin Copper Project • Large 84km2 tenure in the world’s most prolific copper producing region – located less than 100km from world’s largest Cu mine • Includes three identified prospects with Delfin 1, the most advanced, containing a host of spectacular high-grade intercepts such as 86m @ 4.83% Cu

  6. Slide 6: Delfin 1 Prospect

    Delfin 1 Prospect • 15,000m of historical drilling - 90% of drilling concentrated on a 300 x 100m area • 80% of historical drilling is shallower than 140m • Historical drilling has been sporadic, resulting in a poor understanding of mineralisation controls Interval Cu Total From Depth Drill hole (m)

  7. Slide 7: Delfin Copper Project

    Delfin Copper Project • Mineralisation at Delfin 1 reflects structurally-controlled 166.5m, 10.56% Cu magmatic-hydrothermal processes • Porphyry vein-style and high-grade vein replacement/breccia 171.6m, 5.68% Cu style mineralisation identified • Drill core and RC chips are properly stored and avail

  8. Slide 8: Delfin Strong Near-Term News Flow

    Delfin Strong Near-Term News Flow 03 02 Detailed Soil Geochemical Sampling 01 Modern Induced Polartisation (IP) Programme Completed Geophysical Survey Data Secured • Broad multi-element soil geochemical Detailed Rock Chip Sampling and Geological Mapping Completed • Raw data secured from a dipole-dip

  9. Slide 9: Delfin – Deal Terms

    Delfin – Deal Terms* Mandrake has executed a binding Terms Sheet to acquire 100% of Atacamoz Pty Ltd (conditional upon 12-week due diligence and regulatory approvals). The consideration to acquire Atacamoz is: i. 80M fully paid ordinary shares in MAN (50% escrowed for 6 months); and ii. $1,000,000 f

  10. Slide 10: Jimperding PGE-Ni-Cu Project

    Jimperding PGE-Ni-Cu Project • Granted 142km2 EL - 100% owned by Mandrake • Located 30km east of Chalice’s exciting Julimar PGE-Ni-Cu discovery • Identified and pegged on its compelling PGE-Ni-Cu potential prior to the Julimar discovery in March 2020 Regional Aeromagnetics – • Newleyine Prospect has

  11. Slide 11: Berinka Au-Ag-Cu Project – Northern Territory

    Berinka Au-Ag-Cu Project – Northern Territory • 100%-owned Berinka Pine Creek Project is a highly prospective frontier high grade Au-Ag-Cu prospect that has received little modern exploration • Work conducted in the 1980s when RC drilling at Terry’s Prospect by Carpentaria Exploration returned best

  12. Slide 12: For further information:

    For further information: James Allchurch Managing Director Registered Office First Floor, 10 Outram Street, WEST PERTH WA 6005 (08) 9200 3743 (08) 9200 3742 admin@mandrakeresources.com.au April 2022 Presentation | ASX: MAN 12

Mandrake Resources — Investor Presentation (April 2022) on 6ix