Slide 1: 2005 1. 2. 2005 3. 2006 4. 5. 6. 1. 2.
2005 7 11 1 1. 2. 2005 3. 2006 4. 5. 6. 1. 2. 2 1
Slide 2: 1.
1. 3 4 2
Slide 3: 17.9% 2000 HV
5 17.9% 76 80 85 90 95 2000 HV 6 3
Slide 4: 2005 results
7 2. 2005 29 1. 4. 2. 5. 3. 6. 8 4
Slide 5:
9 10 5
Slide 6:
11 12 6
Slide 7:
13 14 7
Slide 8: FY2006 plan
15 3. 2006 5 30 16 8
Slide 9: 17
17 18 9
Slide 10: 4.
19 4. 1 2 3 20 10
Slide 11: ITS, HDD, EMS
21 ITS •HDD • • • • 2005 • EMS • • • • 22 11
Slide 12: EMS
1 • GPS • • • • • • AT • • • • • • LED 23 2 • EMS • • • AT • ASV 24 12
Slide 13: ITS and HDD
3 GPS 2004 2007 03 07 5,562 8,880 16.1 5,951 7,337 7.7 3,382 3,735 3.1 15,366 20,915 10.6 190,606 235,331 9.0 2004 5 20 25 4 ITS HDD 2004 9 SUV ITS CPU 2004 6 2004 IGBT 26 13
Slide 14: M.A.Technology EMS
1 M.A.Technology EMS EMS EMS 27 2 M.A.Technology,Inc. M.A.Technology,Inc. 28 14
Slide 15: FA, MIU, Card, ESEC
3 FA MIU Card 29 4 ESEC 2005 6 29 7 1 30 15
Slide 16: LED
1 LED 31 2 LED LED EL 32 16
Slide 17: Ca CL
\ “) ‘ A Ca CL COMPANY UMETED \ 2 a TRA me ? a Hot our. ave at mM 33 34 17
Slide 18: 6.
6. 35 36 18
Slide 19: 2001
2001 5 37 19