Slide 1: 2018-19 Exploration Programme Overview and Update – August
2018-19 Exploration Programme Overview and Update – August ASX Code : AZY www.antipaminerals.com.au
Slide 2: Important Notice/Disclaimer
Important Notice/Disclaimer Nature of this document: The purpose of this document is to provide general information about Antipa Minerals Limited (the ‘Company’). Unless otherwise stated herein, the information in this document is based on the Company’s own information and estimates. In viewing this
Slide 3: 2018-19 Exploration Programme
2018-19 Exploration Programme Focus • 100% owned projects • Minyari Dome, Chicken Ranch and Tim’s Dome, all within 40km of the Telfer Gold Mine and 35km of each other • Regional exploration (including El Paso Corridor) Programme • Up to 50,000m reverse circulation (RC) and air core (AC) drilling cam
Slide 4: 2018-19 Exploration Programme
2018-19 Exploration Programme AEM Survey Area Rio Tinto funded Citadel Exploration Programme AEM Survey Area 155 km AEM Survey Area Minyari Dome RC ± AC Drilling Tim’s Dome IP Survey Chicken Ranch Tim’s Dome AC AC + RC Drilling + RC Drilling 1 Note: All references to ‘Rio Tinto’ in this document are
Slide 5: Minyari Dome
Minyari Dome Components • 7,400m RC drilling programme • 1,000 - 2,000m AC drilling programme Objectives • Drill test ~2.5km of targets close to existing Minyari and WACA resources • Increase the Minyari and WACA high-grade gold- copper-cobalt resources Timing and Results • RC drilling component com
Slide 6: Chicken Ranch
Chicken Ranch Components • 10,000m AC drilling programme • 5,000 - 10,000m RC drilling programme Objectives • Evaluate and extend existing corridors of high-grade gold mineralisation • Discover additional gold mineralisation corridors • Generate maiden resource Timing and Results • AC drilling compo
Slide 7: Tim's Dome
Tim’s Dome • Considered one of the Company’s most prospective exploration targets • Tim’s Dome is located approximately 12km from the Telfer mine, is on the same geological structure and shares the same host rock sequence and mineralisation characteristics as the world-class Telfer gold-copper depos
Slide 8: Tim's Dome
Tim’s Dome Components • 7,000 - 10,000m RC drilling programme • 5,000 - 7,000m AC drilling programme • IP survey, which will assist to identify drill targets beneath the thin desert sand cover present at Tim’s Dome East Objectives • Evaluate and extend known Tim’s Dome West corridors of high- grade
Slide 9: Regional Exploration
Regional Exploration Components • Expansive aerial electromagnetic (AEM) survey covering in excess of 975km2 of prospective tenure • Several discoveries have been made in the Paterson Province from targets generated using AEM techniques • 3,000 - 5,000m RC drilling programme • 2,000 - 5,000m AC dril
Slide 10: 2018-19 Exploration Programme Indicative Timetable
2018-19 Exploration Programme Indicative Timetable Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Antipa 100% Projects: Reverse Circulation Minyari Dome & Chicken Ranch & Tim’s Test New Targets1 Chicken Ranch1 Dome1 Drilling Programmes1 Air Core Drilling Chicken Tim’s Ranch & Test New Targets1 Prog
Slide 11: Notes: Competent Persons Statement
Notes: Competent Persons Statement Competent Persons Statement – Exploration Results The information in this report that relates to the Exploration Results is extracted from the following: Reports entitled various relating to Citadel Project and North Telfer Project created between 7 September 2011
Slide 12: Notes: Competent Persons Statement
Notes: Competent Persons Statement Continued from previous page: • Report entitled “Minyari Dome Phase 1 Final Assay Results – Further Drilling Commencing September” created on 31 August 2017; • Report entitled “Citadel Project Exploration Update” created on 2 October 2017; • Report entitled “North