Kennady Diamonds Inc

Kennady Diamonds — Investor Presentation (April 2018)

23 slides from Kennady Diamonds's investor presentation, April 2018

  1. Slide 1: The Kennady North Project – Corporate Presentation H1 2018

    The Kennady North Project Corporate Presentation – H1 2018

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement This presentation may contain “forward-looking statements.” These forward-looking statements are made as of the date of the presentation and Kennady Diamonds Inc. does not intend, and does not assume any obligation, to update these forward-looking statements. Forward-lookin

  3. Slide 3: Kennady Diamonds Inc.

    Kennady Diamonds Inc. • Kennady is a public company listed on the TSX-V under the symbol KDI. • Formed in mid-2012 as a spin-off from Mountain Province Diamonds Inc. • 52.9 million shares outstanding. • Market capitalization ~$155 million. • Sole focus on the Kennady North Project. • Outsourcing mod

  4. Slide 4: The Kennady - Mountain Province Transaction

    The Kennady - Mountain Province Transaction On January 29, 2018 Kennady (KDI) and Mountain Province Diamonds Inc. (MPVD) announced that they had entered into a definitive arrangement agreement pursuant to which MPVD will acquire all of the issued and outstanding shares of Kennady by way of a court-

  5. Slide 5: The Technical Team

    The Technical Team • Aurora Geoscience Ltd., Yellowknife • SRK Consulting, Vancouver • Mineral Services Canada, Vancouver • JDS Energy & Mining Inc., Vancouver Slide|5

  6. Slide 6: Location

    Location The Kennady North Project is located 300 km ENE of Yellowknife, NWT Yukon Territory Northwest Territories Kennady North Project Yellowknife Nunavut British Columbia Alberta Newfoundland Sask. Manitoba Quebec Ontario Slide|6

  7. Slide 7: Location - Regional

    Location - Regional Kennady North is easily accessible from the winter spur road leading to the Gahcho Kué Mine. Slide|7

  8. Slide 8: Kennady North Project

    Kennady North Project The Kelvin-Faraday Corridor “KFC” is a NE-SW structural feature that includes the Faraday and Kelvin kimberlites, and continues to the SW to include the Gahcho Kué kimberlites. • Property consists of 22 mining leases and 58 mineral claims totaling 67,164 ha. • 100% owned by Ken

  9. Slide 9: Kelvin – Faraday Corridor

    Kelvin – Faraday Corridor Slide|9

  10. Slide 10: Kelvin Pipe Morphology

    Kelvin Pipe Morphology • In plan view the body exhibits a sub- horizontal “L” shaped morphology. • The upper contact is inclined 12-15 degrees to the NNW • Strike length is 750 m • Vertical thickness ranges from 75 m in the SE limb to 200 m in the north limb • Horizontal width is 30 to 60 m • Remain

  11. Slide 11: Kelvin Geological Model

    Kelvin Geological Model View looking W KIMB1 KIMB2A Zone A KIMB2B KIMB3A and KIMB5 Zone B KIMB3B KIMB3C Zone Bx KIMB6 KIMB4 and KIMB7 Zone C S l i d e | 11

  12. Slide 12: Kelvin – Bulk Sample Results

    Kelvin – Bulk Sample Results Kelvin 2015 (South Limb) Kelvin 2016 (North Limb) Sample Sample Sample Sample Weight Grade Weight Grade (tonnes) +0.85mm (c/t) (tonnes) + 0.85mm (c/t) Zone A 143.35 2.85 184.2 2.87 Zone B 119.13 2.46 200.2 2.57 Zone Bx 143.04 0.82 183.5 0.84 Zone C 37.02 1.98 44.0 1.81 T

  13. Slide 13: Kelvin Resource

    Kelvin Resource • Indicated Resource of 13.62 million carats announced December 12, 2016. • 8.5 million tonnes of kimberlite grading 1.6 carats per tonne and an average value of US$63/carat (1mm cutoff). • High-value population of white gems present in the larger size fractions (D-colour potential).

  14. Slide 14: Kelvin Sheet Complex

    Kelvin Sheet Complex • Lesser-explored sheet complex N Hobbes adjacent to Kelvin kimberlite body • The sheet complex strikes SSW and dips WNW • Strike length of 1 km • Thickness ranges from 0.5 up to 17 m • Predominantly diamondiferous hypabyssal kimberlite • Volcaniclastic kimberlite has been Kelvi

  15. Slide 15: Faraday 2 Geological Model

    Faraday 2 Geological Model View Looking North • Inclined, non-traditional pipe • 450 m long, open to the NW • Variable width between 20-50 m Faraday 2 Kimberlite • Vertical thickness ranges from 30-80 m • Multiple emplacement events • Kimberley-type pyroclastic kimberlite (KPK) • Hypabyssal kimberli

  16. Slide 16: Faraday 1-3 Geological Model

    Faraday 1-3 Geological Model • Non-traditional pipe plunging to the NW View Looking SE • Faraday 1: 200 m long by 50 m wide and 20 m thick • Faraday 3: 375 m long by 80 m wide by 30m thick • Multiple emplacement events • Main pipe infill is Kimberley-type pyroclastic kimberlite (KPK) • Hypabyssal ki

  17. Slide 17: 2017 Faraday Bulk Sampling

    2017 Faraday Bulk Sampling Faraday 1 Objective - advance Faraday 2 & 3 to inferred resource status and acquire a mini-bulk sample from Faraday 1. Faraday 2 Faraday 3 Faraday 1 Holes 29 43 4 Faraday 3 Start Date 20-Jan 01-Mar 08-Apr Finish Date 28-Feb 08-Apr 11-Apr Meters Total 3,471 m 4,256 m 303 m

  18. Slide 18: Bulk Sample Drilling

    Bulk Sample Drilling S l i d e | 18

  19. Slide 19: 2017 Bulk Sample Diamond Results

    2017 Bulk Sample Diamond Results The quality of the Faraday diamonds is better than Kelvin in all value parameters. Avg. Grade Avg. Value Kimberlite Tonnes # Stones Carats (ct/t) (US$/ct) Faraday #1 26.4 1,184 76.8 2.91 $144 Faraday #2 262.2 14,310 737.6 2.81 $75 Faraday #3 276.4 7,519 460.5 1.67 $1

  20. Slide 20: Faraday – Unsorted Lots

    Faraday – Unsorted Lots Faraday #2 Faraday #3 S l i d e | 20

  21. Slide 21: Faraday Resource

    Faraday Resource • Inferred Resource of 5.02 Million Carats (3.27 Mt @ 1.54 c.p.t. and US$98/ct (1mm cutoff). • Faraday 2 = 3.13 Million Carats (1.39 Mt @ 2.24 c.p.t. and US$112/ct). • Faraday 3 = 1.90 Million Carats (1.87 Mt @ 1.01 c.p.t. and US$75/ct). • Target for Further Exploration (TFFE): Fara

  22. Slide 22: Priorities and Objectives for H1 2018

    Priorities and Objectives for H1 2018 • Winter program consisting of ~10,500 m of diamond drilling (60% exploration and 40% delineation & geotechnical). • Grassroots exploration drilling to discover new kimberlites initially focused in the Kelvin-Faraday Corridor. • New targets, immediately southwes

  23. Slide 23: Corporate Information

    Corporate Information TSX-V: KDI Vancouver Office 999 West Hastings Street, Suite 900 • 52.9 M shares outstanding. Vancouver, B.C. • Market capitalization ~$155M. V5J 2S1 Head Office Tel: (604) 558-6238 1145 Midland Avenue, rmoore@kennadydiamonds.com Scarborough, ON, M1K 4H2. Tel: (416) 640-1111 www

Kennady Diamonds — Investor Presentation (April 2018) on 6ix