Slide 1: High Grade Copper & Heavy Mineral Sands Developer
High Grade Copper & Heavy Mineral Sands Developer Corporate Presentation l February 2016 AIM:SAV

Slide 2: Disclaimer
Disclaimer 2 These presentation slides (“the Slides”) do not comprise an admission document, listing particulars or a prospectus relating to Savannah Resources plc (“the Company”), or any subsidiary of the Company, do not constitute an offer or invitation to purchase or subscribe for any securities

Slide 3: Savannah at a glance
Savannah at a glance… 3 Prospective multi-commodity portfolio: KEY DATA • Blocks 4, 5 and 6, Oman – 1,270 km² brownfields copper MARKET AIM portfolio of advanced development projects with additional gold upside targeting first concentrate TICKER SAV production in late 2017 SHARE PRICE* 2.02p • Mutam

Slide 4: Investment highlights: Near term copper
Investment highlights: 4 Near term copper Oman • Uniquely attractive copper development project poised to deliver into stronger copper prices in 2017 • Fast-track Mahab/Block 4 mines for late 2017 copper concentrate production with gold credits • JORC Mineral Resource from Exploration Target of 10.7

Slide 5: Board and management team
Board and management team 5 Experienced and successful team delivering a number of copper and gold mines Matthew King A graduate in law from Durham University, Matthew is currently a Senior Advisor to The Operational Risk Practice Pte Ltd, a Singapore- Chairman based risk management consultancy and

Slide 6: Oman: three highly prospective blocks
7 Oman Targeting a resource Three highly prospective blocks covering 1,270 km²: inventory to support high margin, low cost, Aarja* copper/gold operations to Zuha* old copper mines (collectively commence commercial BLOCK 4 Lasail produced over 212,000t copper) 408km² Bayda production in late 2017 Sal

Slide 7: Oman: an outstanding location
Oman: an outstanding location 8 Oman offers a compelling investment opportunity, offering low CAPEX and OPEX mine development options Outstanding geology VMS Clusters of 1Mt -15Mt - Oman hosts one of the largest concentrations of VMS deposits in the world Metallurgically simple ores Medium t

Slide 8: Lasail Copper Smelter
Lasail Copper Smelter 9

Slide 9: Oman Ownership Structure
Oman Ownership Structure 10 Earning 65% 100% Earning 70% 65% Interest Interest 100% 100% Savannah 40% can go to 75 by completing BFS

Slide 10: Blocks 4 & 5: Comprehensive Database
Blocks 4 & 5: Comprehensive Database 11 • Database containing ~100,000m of drilling data compiled Summary of Drilling over Key Prospects over a series of potential resources across Blocks 4 and 5 in November 2015 Deposit Number of Drill Metres Holes Drilled • Results demonstrate potential to define

Slide 11: Block 4: Near Mine Copper Targets
Block 4: Near Mine Copper Targets 12 AARJA DRILLING ZUHA DRILLING LASAIL BAYDA • Commercially mined in the 1980s – produced over 190,000t copper • No near mine exploration since the early 1990s • Significant opportunity to fast track to production • 3,700km VTEM survey completed H1 2015 • Most of th

Slide 12: Block 4: Near Mine Cu/Au Targets
Block 4: Near Mine Cu/Au Targets 13 AARJA DRILLING ZUHA DRILLING LASAIL BAYDA • Drilling commenced Q4 2015 – 7 holes to test 3 targets, identified from historical drill results, which include: o Aarja Main – 18.58m at 4.7% copper from 143m (hole 10-23) o Dog's Bone – 33.8m at 3.35% copper from 153.1

Slide 13: Aarja Mine – Exploration Target
Aarja Mine – Exploration Target 14 Source: Company data It is important to note that the above table is a summary of Exploration Targets and the potential quantity and grade is conceptual in nature, there has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further

Slide 14: Block 4: Near Mine Copper Targets
Block 4: Near Mine Copper Targets 15 AARJA DRILLING ZUHA DRILLING LASAIL BAYDA • Lasail 84 known drill holes, 84 located and entered into database • Resource model constructed, underground workings required to determine what part of the orebody has been mined • Check drilling now required prior to a

Slide 15: Block 4: Near Mine Copper Targets
Block 4: Near Mine Copper Targets 16 AARJA DRILLING ZUHA DRILLING LASAIL BAYDA Source: Company data It is important to note that the above table is a summary of Exploration Targets and the potential quantity and grade is conceptual in nature, there has been insufficient exploration to estimate a Min

Slide 16: Block 4: Near Mine Copper Targets
Block 4: Near Mine Copper Targets 17 AARJA DRILLING ZUHA DRILLING LASAIL BAYDA Source: Company data It is important to note that the above table is a summary of Exploration Targets and the potential quantity and grade is conceptual in nature, there has been insufficient exploration to estimate a Min

Slide 17: Block 4: Near Mine Copper Targets
Block 4: Near Mine Copper Targets 18 AARJA DRILLING ZUHA DRILLING LASAIL BAYDA • Three Priority 1 and seven Priority 2 anomalies identified • Highly prospective geology and copper float found on a number of the targets • Drilling commenced Q4 2015 to test high priority VTEM targets for VMS mineralis

Slide 18: Block 4 – Additional Gold Upside
Block 4 – Additional Gold Upside 19 GADDAMAH DRILLING • Drill testing at the Gaddamah West Gossan commenced Q4 2015 • Drilling to follow up encouraging trenching results including 7.7m at 11.35g/t gold, 1.45% zinc and 0.40% copper in GDT01 • Two 30m holes to test down dip extensions of surface sampl

Slide 19: Block 5 – Established Resource
Block 5 – Established Resource 20 MAHAB 4 DRILLING • Current Indicated and Inferred Mineral Resource of 1.5Mt at 2.1% copper at the Mahab 4 prospect in Block 5 • Hole GRB5D035: 54.19m at 4.97% copper - broad zones of high grade copper mineralisation identified From To Au_ppm Cu_% 50 51 0.453 4.26 51

Slide 20: Block 5 – Significant Resource Upside
Block 5 –Significant Resource Upside 21 MAHAB 4 DRILLING • Deposit remains open along strike to north and both up and down dip • Drill programme commenced November 2015 to expand Mineral Resource – targeting strike extensions of high grade copper (>5% copper) • Historical results include: o 54.86m a

Slide 21: Oman: Development Timetable
Oman: 22 Development Timetable • Resource drilling programme • Scoping Studies • Environmental Studies and licencing 2016 • Reserve drilling and Feasibility Studies Development • Option/Purchase Copper Float plant • Feasibility study finalised Production • Negotiate offtake contract • Mining lease a

Slide 22: Mozambique: JV with Rio Tinto
23 Mozambique JV with Rio Tinto M U TA M B A / J A N G A M O Inferred Mineral Resource of 65Mt at 4.2% total heavy minerals (from Savannah’s Jangamo asset) Exploration Target of between 7.0 and 12.0Bt at a grade ranging from 3 to 4.5% total heavy minerals (from Rio Tinto’s assets) THM

Slide 23: East Africa – An Excellent Address
East Africa – An Excellent Address 24 • Favourable source rocks and trap sites • Large operating mines to the north, south and east • Strong evidence of high unit-value mineral assemblages • Major operations in the region demonstrate infrastructure solutions Mutamba and established markets

Slide 24: Mutamba/Jangamo Joint Venture
Mutamba /Jangamo Joint Venture 29 • Transformational Joint Venture agreement in June 2015 with Rio Tinto to develop a large-scale commercial heavy minerals sands mining project • SAV combined Jangamo project with Rio’s adjacent Mutamba and Dongane deposits, and Chilubane deposit • Maiden JORC compli

Slide 25: JV Earn-in Terms
JV Earn-in Terms 26 • Phase 1: Scoping Study - Savannah 20% participating interest on completion o Initial reconnaissance exploration programme to detect zones of high grade HMS o Follow-up scout RC drilling focusing on coherent zones of high grade HMS o Six month (approx) Scoping Study on the viabi

Slide 26: Mutamba/Jangamo: Resource Potential
Mutamba/Jangamo: Resource Potential 27 Resource Table (2.5% Cutoff) % Ilmenite % Ilmenite % Rutile in % Zircon Ilmenite Zones Category Sand (Mt) % THM HM (Mt) Rutile (Mt) Zircon (Mt) in HM in sand sand in sand (Mt) Jangamo Inferred 65 4.2 60 2.5 0.083 0.15 2.7 1.6 0.054 0.10 Exploration Target Tonna

Slide 27: Mutamba/Jangamo: Infrastructure
Mutamba/Jangamo: Infrastructure 28 • Located ~450km northeast of the capital • Proven local workforce city of Maputo and ~40km from the ports of Inhambane and Maxixie • Established camp facilities, including accommodation and ablution blocks and site clinic • Lindela substation located 5km away • On

Slide 28: Mutamba/Jangamo: Development Timetable
Mutamba/Jangamo: 29 Development Timetable •Auger Drilling •Indicated and Inferred Mineral Resource Update •Complete scoping study •Pilot plant test work commences 2016 •Marketing studies •Pre-feasibility study •Order long lead time items Development •Feasibility study •Negotiate offtake contract •Mi

Slide 29: Investment Case
Investment Case 30 Focussed on commencing commercial copper production company in Oman in 2017, with additional gold upside Active growth strategy in place to build a multi-commodity, geographically diverse development and production company Completed significant value accretive milestones on time a

Slide 30: Contact us
Contact us 31 CEO David Archer Savannah Resources Plc E: info@savannahresources.com
Source: Internet Archive copy of savannahresources.com
More decks from Savannah Resources PLC
Investor Presentation (October 2026)48 slides · October 2026
Investor Presentation (September 2026)37 slides · September 2026
Investor Presentation (November 2025)31 slides · November 2025
Investor Presentation (January 2025)19 slides · January 2025
Investor Presentation (October 2024)23 slides · Oct 11, 2024
Investor Meet Company (June 2024)17 slides · June 2024