  1. Slide 1: Over 20 years in Southern Africa

     Over 20 years in Southern Africa.  3 advanced, unique projects.  Positioned to realize urbanization’s resource opportunities with minerals to help build a better world.

  2. Slide 2: CITIC Metal strategic equity investment completed

    KAMOA-KAKULA August 16, 2019: Ivanhoe Mines completes strategic equity investment of C$612 million (US$459 million) from China-based CITIC Metal, bringing CITIC’s investment in Ivanhoe to more than US$1 billion. Additional C$67 million (US$50 million) received from Zijin Mining through the exercise

  3. Slide 3: Kamoa-Kakula: Exploration & mine development

    KAMOA-KAKULA Exploration & mine development Democratic Republic of Congo Our world’s best copper discovery Hole DD1571, which intersected 18.0% copper over 18.86 metres

  4. Slide 4: Kakula Mine's first stage grade and cash costs

    KAMOA-KAKULA The Kakula Mine’s first stage will average 6.8% copper over the first 5 years, with mine-site cash costs of US$0.43/lb copper

  5. Slide 5: Independent pre-feasibility study for Kakula copper mine

    KAMOA-KAKULA Independent pre-feasibility study (PFS) for the Kakula copper mine announced on February 6, 2019 The stage one, 6 Mtpa operation at Kakula, with estimated development capital of US$1.1 billion, yields an after-tax NPV8% of US$5.4 billion and an IRR of 47% over a 25-year mine life

  6. Slide 6: PEA staged expansions and smelter economics

    KAMOA-KAKULA The PEA envisions the staged mine expansions and smelter will be funded from internal cash flows and yields an after-tax NPV8% of US$10.0 billion and an IRR of 41%

  7. Slide 7: Projected world's second largest copper mine

    KAMOA-KAKULA Once the expanded PEA production rate of 18 Mtpa is achieved, Kamoa-Kakula is projected to become the world’s second largest copper mine, with peak annual production of more than 700,000 tonnes of copper

  8. Slide 8: Highest-grade intersection ever drilled at Kamoa-Kakula

    KAMOA-KAKULA August 18: Drilling intersects the highest-grade intersection ever drilled at the Kamoa-Kakula Project, with an estimated grade of 18.0% copper over 18.86 metres, at a 2% cut off

  9. Slide 9: Kamoa North newly defined high-grade corridors

    KAMOA-KAKULA DD1450 2 newly defined corridors Kamoa North − containing high-grade copper zones two new high-grade corridors trending onto Ivanhoe’s 100%-owned ground

  10. Slide 10: Plan view of Kamoa North Bonanza Zone

    KAMOA-KAKULA Plan view of Kamoa North Bonanza Zone drill-holes and interpreted high-grade corridor

  11. Slide 11: North-south section through Kamoa North Bonanza Zone

    KAMOA-KAKULA North-south section view through the Kamoa North Bonanza Zone

  12. Slide 12: Copper replacing pyrite in KPS bonanza zone

    KAMOA-KAKULA Schematic on how the copper replaced pyrite in the KPS bonanza copper zone in DD1450 Super high grade due to replacement of pyrite in the mineralised zone Diamictite Cpy Bn Bn Kamoa Pyritic Siltstone Cpy A Bn Diamictite +/- siltstone Normal mineralised zone

  13. Slide 13: Kamoa North DD1450: 22.3 metres of 13.05% copper

    KAMOA-KAKULA Kamoa North DD1450: 22.3 metres of 13.05% copper in shallow, flat-lying discovery hole

  14. Slide 14: Mineralization profiles of recent Kamoa North holes

    KAMOA-KAKULA Mineralization profiles of recent holes across the Kamoa North Bonanza Zone

  15. Slide 15: Comparative grade profiles from Kansoko, Kakula, Kamoa North

    KAMOA-KAKULA Comparative grade profiles from Kansoko, Kakula and Kamoa North discoveries

  16. Slide 16: Core from the Kamoa North Bonanza Zone

    KAMOA-KAKULA Core from the Kamoa North Bonanza Zone DD1520 sample from a downhole depth of 197 metres, containing predominantly massive chalcocite, bornite and some copper oxide (CuO). The grade of the sample is 46% copper. DD1522 sample from a downhole depth of 212.1 metres, containing finely disse

  17. Slide 17: Drilling extends Kamoa Far North discovery

    KAMOA-KAKULA Drilling extends 10-km Kamoa Far North discovery on to Ivanhoe’s 100%-owned Western Foreland exploration licences

  18. Slide 18: Largest high-grade copper deposit in the world

    KAMOA-KAKULA Kamoa-Kakula is the largest high-grade copper deposit in the world 45 40 5.9 Measured & Indicated Resource Inferred Resource Contained Copper (Mt) 35 30 25 11.7 20 36.6 15 6.4 10 16.9 4.8 0.0 0.4 5 10.2 0.4 0.1 0.0 0.0 0.3 4.6 1.4 0.9 0.7 0.5 0.3 0.4 0.3 - Source: Wood Mackenzie *Note:

  19. Slide 19: Largest copper discovery ever made in Africa

    KAMOA-KAKULA Kamoa-Kakula is the largest copper discovery ever made on the African continent 45 40 Measured & Indicated Resource Inferred Resource Historical Production Contained Copper (Mt) 35 30 25 20 15 10 5 - Source: Wood Mackenzie and USGS

  20. Slide 20: Extent of Kakula / Kakula West Discovery

    KAMOA-KAKULA Extent of Kakula / Kakula West Discovery Kakula West discovery extends known mineralization to more than 13 km − and remains open.

  21. Slide 21: Kakula and Kakula West resource block grades

    KAMOA-KAKULA Kakula and Kakula West discovery areas showing grades of Indicated and Inferred Mineral Resource blocks at a 3% copper cut-off

  22. Slide 22: Underground development at Kakula approaching 10% copper

    KAMOA-KAKULA July 2019: Underground development at Kakula approaching 10% copper!

  23. Slide 23: Electrical substation construction at Kakula

    KAMOA-KAKULA Construction continues at Kakula for an electrical substation for the decline conveyor system

  24. Slide 24: New 34-kilometre highway to Kolwezi airport

    KAMOA-KAKULA Ongoing construction of the new 34-kilometre highway directly linking the Kamoa-Kakula Copper Project to the Kolwezi airport, located southeast of the city of Kolwezi. The new highway is expected to be fully operational by the end of 2019.

  25. Slide 25: DRC regional infrastructure

    KAMOA-KAKULA DRC regional infrastructure Power line supplying Kolwezi Nzilo 1 hydroelectric power plant Mwadingusha dam  DRC power lines are 10 km (6 miles) from Kamoa.  Agreement with government to upgrade three existing hydroelectric power plants – Koni, Mwadingusha and Nzilo 1.

  26. Slide 26: Operational railway to Lobito port

    KAMOA-KAKULA Operational railway linking DRC mines with Angola’s Atlantic port of Lobito Sources: Railwaysafrica.com, enr.com, Stratfor & Grindrod

  27. Slide 27: Road linking Kamoa-Kakula to Kolwezi airport

    KAMOA-KAKULA Map showing road linking the Kamoa- Kakula Project to Kolwezi airport, and planned road to Solwezi, Zambia

  28. Slide 28: National railways linking DRC mines with seaports

    KAMOA-KAKULA National railways linking DRC mines with international seaports

  29. Slide 29: Sustainable Livelihoods Project community maize field

    KAMOA-KAKULA Farmers at a local community maize field – an initiative of the Kamoa-Kakula Sustainable Livelihoods Project

  30. Slide 30: New secondary school near Kamoa-Kakula

    KAMOA-KAKULA A new secondary school has been built in Kaponda, a small village near the Kamoa-Kakula Project, as part of the project's community relations program. Classes will begin soon at another school nearing completion at Muvunda village.

  31. Slide 31: Western Foreland

    Western Foreland A drill rig in action on the Makoko exploration area on a portion of Ivanhoe's 100%-owned Western Foreland licences. Makoko is approximately 20 kilometres west of the Kakula copper discovery.

  32. Slide 32: Western Foreland exploration drilling

    WESTERN FORELAND Ongoing exploration drilling on other targets identified in the Western Foreland area to test for high-grade copper

  33. Slide 33: Kipushi: Mine development & upgrading

    KIPUSHI Mine development & upgrading for a new era Democratic Republic of Congo

  34. Slide 34: World's highest grade zinc-copper-silver-germanium mine

    KIPUSHI Kipushi: world’s highest grade zinc-copper-silver-germanium mine in southeast DRC on the Zambian border Kamoa-Kakula Kipushi

  35. Slide 35: The birth of a spectacularly high-grade mine

    KIPUSHI The birth of a spectacularly high-grade mine In 1924, Kipushi began mining 18% copper from a surface open pit, before transitioning to Africa’s richest underground copper, zinc and germanium mine. Mining continued until 1993. 1928

  36. Slide 36: Kipushi pre-feasibility study

    KIPUSHI December 13, 2017: Ivanhoe announced a pre-feasibility study for the rebirth of the historic Kipushi zinc-copper-silver-germanium mine The planned return to production would establish Kipushi as the world’s highest-grade major zinc mine.

  37. Slide 37: Big Zinc ready to mine

    KIPUSHI  +35% Big Zinc (circled in red): READY TO MINE…

  38. Slide 38: New lighting at 1,200-metre level

    KIPUSHI New lighting installed at 1,200-metre level

  39. Slide 39: Control room operators at Shaft 5

    KIPUSHI Control room operators at Kipushi’s Shaft 5

  40. Slide 40: Upgraded 1,150-metre-level ore conveyor belt

    KIPUSHI Upgraded 1,150-metre-level ore conveyor belt at the historic, high-grade Kipushi zinc-copper-lead-germanium mine

  41. Slide 41: New underground mining equipment fleet

    KIPUSHI A scooptram loader and haul truck, part of the fleet of new underground mining equipment

  42. Slide 42: Shaft 5 main pumping station

    KIPUSHI Shaft 5 main pumping station at the 1,200-metre level

  43. Slide 43: Shaft 5 rock-hoisting winder

    KIPUSHI Fully-operational Shaft 5 rock-hoisting winder

  44. Slide 44: Community adult literacy program at Kipushi

    KIPUSHI Community adult literacy program at Kipushi, sponsored by Ivanhoe Mines and implemented in partnership with AlfaCongo

  45. Slide 45: Kipushi geology team at drill core shed

    KIPUSHI Members of Kipushi’s geology team at the drill core shed

  46. Slide 46: Core from hole KPU040

    KIPUSHI Core from hole KPU040 showing massive copper sulphides with high silver values

  47. Slide 47: Core from hole KPU008 in Serie Recurrente zone

    KIPUSHI Core from hole KPU008 in the Serie Recurrente zone – 11 metres of 17% copper and 89.6 g/t silver

  48. Slide 48: World's best drill hole?

    KIPUSHI World’s best drill hole? Our geology team holding hands and showing Big Zinc intersection of 44.8% zinc over 340 metres

  49. Slide 49: Platreef: Discovery & mine development

    PLATREEF Discovery & mine development South Africa

  50. Slide 50: Revenue per tonne of ore at Platreef at 3-year high

    PLATREEF Revenue per tonne of ore at the Platreef Project now at 3-year high Total Cash Cost (Mine Site + Realization) Source: Bloomberg. Based on historical weekly commodity prices at the end of each week.

  51. Slide 51: Bushveld Complex produces ~70% of global platinum

    PLATREEF The Bushveld Complex produces ~70% of global platinum Waterberg Discovery “The opening up of the Northern Limb may be the most significant Mogalakwena Mine PLATREEF change in the economics of any Mokopane DISCOVERY commodity since the introduction of bulk mining techniques of the USA’s copp

  52. Slide 52: Shaft 1 stations to access Flatreef orebody

    PLATREEF 750-metre, 850-metre and 950-metre stations on Shaft 1 will provide access to the high-grade Flatreef orebody

  53. Slide 53: First underground mining intersection of Platreef

    PLATREEF September 26, 2018: First underground mining intersection of the Platreef mineralized belt on the Northern Limb of South Africa’s Bushveld Complex The first ore from the underground mine development was delivered to a surface stockpile for metallurgical sampling.

  54. Slide 54: Platreef Shaft 2 box cut

    PLATREEF Platreef’s Shaft 2 box cut, with the 11.5-metre shaft ring set-up for the 10-metre internal diameter shaft

  55. Slide 55: Shaft 2 headframe foundation completed

    PLATREEF Construction of the Shaft 2 headframe foundation was successfully completed in July 2019

  56. Slide 56: Testing ventilation at Shaft 1 750-metre station

    PLATREEF Testing the ventilation at Shaft 1’s 750-metre-level station. The shaft bottom currently is more than 900 metres below surface and completion of the shaft to a depth of 982 metres below surface is planned for early 2020.

  57. Slide 57: Platreef Shaft 2 largest hoisting capacity

    PLATREEF PLATREEF SHAFT 2 LARGEST HOISTING CAPACITY PRODUCTION SHAFT IN THE PRECIOUS METALS INDUSTRY Illustration shows two cut-away perspectives of Shaft 2’s 103-metre-tall concrete headframe and internal permanent hoisting facilities.

  58. Slide 58: Schematic section of the Platreef Mine

    PLATREEF Schematic section of the Platreef Mine

  59. Slide 59: Platreef licences on Northern Limb

    PLATREEF Platreef licences on Northern Limb  Platreef horizon dips west.  Platreef PGE-Au-Ni-Cu mineralization has thicknesses up to hundreds of metres. Key Platreef Amplats’ Mines Ivanhoe Mines Ivanhoe Mines JV Rietfontein City Turfspruit JV Anglo Platinum Lonmin Fault Macalacaskop Platreef Prope

  60. Slide 60: Looming platinum supply cliff

    PLATREEF The looming platinum “supply cliff” for Southern Africa’s existing producing mines (’000 oz.) Southern Africa's projected plunge in platinum production  Existing shafts alone will barely maintain current production to 2021.  Then, closures of mined-out shafts will help trigger a long prod

  61. Slide 61: New production provides only short-lived platinum lift

    PLATREEF Even new production now under development likely to provide only short-lived lift in platinum output (’000 oz.) Southern Africa’s projected platinum production plunge  Ivanhoe’s Platreef is among new projects whose ramp-up outputs will slightly lift regional supply until 2021 – 2022: EXPEC

  62. Slide 62: Thank You

    HOS Ralsz,CeNEs 3 74

Ivanhoe Mines — Investor Presentation (August 2019) on 6ix