  1. Slide 1: ASX Release: Investor Presentation

    SOUTHERN CROSS ELECTRICAL ENGINEERING LIMITED For personal use only ASX RELEASE 26 May 2008 Manager Company Announcement Office Australian Stock Exchange Level 4, 20 Bridge Street SYDNEY NSW 2000 Investor Presentation Southern Cross Electrical Engineering Limited (ASX:SXE) will be presenting the fol

  2. Slide 2: Southern Cross Electrical Engineering Limited Investor Presentation May 2008

    For personal use only Southern Cross Electrical Engineering Limited Investor Presentation May 2008

  3. Slide 3: Who We Are

    Who We Are For personal use only • Established 30 years ago, listed in November 2007 • Approximately 460 staff in Australia and overseas • Specialise in electrical, control and instrumentation installation and testing services • Remote locations specialist • Have won many industry awards for quality

  4. Slide 4: Where We Have Worked

    Where We Have Worked For personal use only Completed project locations

  5. Slide 5: Our Current Markets

    Our Current Markets For personal use only ¾ 170 Gold treatment plants ¾ Port upgrades ¾ Material handling facilities (electrical engineering world ¾ Harbour container cranes ¾ Food processing plants record) ¾ Power generating facilities ¾ Refinery shutdowns ¾ Underground mine and ¾ Overhead lines an

  6. Slide 6: The Participants

    The Participants For personal use only SCEE differentiates itself from its competitors by: • having a proven track record with blue-chip customers and suppliers; • deeply experienced and loyal team; • reputation for ethical behaviour; • proven ability to work in remote locations; and Source: Managem

  7. Slide 7: Current Trends

    Current Trends For personal use only Net Profit After Tax • Earnings growth has been driven by 14 12 investment in the mining industry 10 • Approximately 80% of SCEE m $ 8 revenue comes from the Pilbara, 6 the balance from overseas 4 2 • Typical electrical component in a 0 mining construction projec

  8. Slide 8: The Metrics

    The Metrics For personal use only Measure Note Value Market capitalisation 1 $141.6m Net cash 2 $23.4m Enterprise Value $118.2m • Strong balance Proforma EBITDA 3 $18.5m sheet • Low capital Proforma NPAT 3 $12.2m requirement EV/EBITDA 6.4x • Prospectus PER 9.7x earnings on track Return on shareholde

  9. Slide 9: The Outlook: Upcoming Mining Projects

    The Outlook Upcoming Mining Projects For personal use only Project Est. Start Est. Cost Date Hope Downs Stage 2 Jun 08 $401m Worsley Alumina Jun 08 $1,500m Balla Balla Jun 08 $603m Karara Iron Ore Jul 08 $1,700m Balmoral South Aug 08 $2,600m Sino Iron Project Sep 08 $5,200m Southdown Iron Ore Nov 08

  10. Slide 10: FY09 SCEE Outlook

    FY09 SCEE Outlook For personal use only FY09 revenue under contract ~ $55m FY09 tenders in Strong FY09 progress > $120m earnings growth Strong pipeline to be tendered

  11. Slide 11: FY09 Challenges

    FY09 Challenges For personal use only The Challenge The Impact The Solution Access to quality Creates revenue Overseas operations tradesmen capacity constraints + loyal crew Competition is Potential to impact Large pipeline = increasing margins capacity constraints Tenders awarded at Potential to de

  12. Slide 12: The Future

    For personal use only The Future

  13. Slide 13: Oil & Gas

    Oil & Gas For personal use only • Previous O & G experience Oil & Gas • Key staff recruited • Accreditation process in progress • Attended Offshore Technology Conference in Houston • Discussions with potential clients commenced • Facilities under construction • Targeting small FY09 contribution

  14. Slide 14: Summary

    Summary For personal use only SCEE: • Has 30 years experience in the electrical construction business • Has a strong reputation for safety and quality • Has a proven track record for winning work in Australia and overseas • Has a strong team with long tenure • Has confirmed it is on track to meet pr