  1. Slide 1: A growing, low-cost gold producer in the Philippines

    For personal use only A growing, low-cost gold producer in the Philippines Resources Rising Stars – 24-25 May 2016 Mark Williams, Managing Director ASX Code: RED 1

  2. Slide 2: Presentation Overview: 5 Key Pillars

    Presentation Overview: 5 Key Pillars ASX-listed gold producer operating in the Philippines For personal use only 1. Low-cost production from open pit operations at Siana – Open pit forecast to produce 181,000oz at AISC of US$740-790/oz from July 2015 to FY2018 – Expected to achieve higher end of FY2

  3. Slide 3: Corporate Snapshot

    Corporate Snapshot Unhedged and debt-free ASX-listed gold producer operating in the Philippines For personal use only ASX Code RED Directors and Management Share price (as at 19 May 2016) A$0.088 Kevin Dundo – Chairman Issued shares 761.9M Mark Williams – Managing Director Market capitalisation (at

  4. Slide 4: Siana Gold Project – Location

    Siana Gold Project – Location Located in a highly prospective and well-established mining region For personal use only 4

  5. Slide 5: Open Pit Mining Schedule and Production Guidance

    Open Pit Mining Schedule and Production Guidance Financial year forecast production profile For personal use only 1. 2015/16 financial year forecast production profile: Low cost open pit Quarter Estimated Au oz production recovered 2. September 2015 quarter (Actual) 17,737 FY2016 Underground potenti

  6. Slide 6: Siana Gold Project – Revised Mining Strategy

    Siana Gold Project – Revised Mining Strategy Detailed hydrological and geotechnical review underpins revised open pit mine schedule For personal use only 1.  Pit design based on independent Low cost open pit geotechnical review: production – Staged cut-back of the East and West pit 2. walls, Stages

  7. Slide 7: Siana – Underground Feasibility Study

    Siana – Underground Feasibility Study A blueprint to deliver future growth at Siana For personal use only 1. Low cost  Updated Feasibility Study currently being open pit production completed by underground mining consultants Mining One Pty Ltd 2. Underground potential  Represents a comprehensive u

  8. Slide 8: Siana – Underground Resources

    Siana – Underground Resources Underpins plan to extend the life of the Siana Project well beyond current open pit For personal use only Siana Underground deposit: 1. Low cost open pit production  JORC 2012 Indicated and Inferred Mineral Resource of 2. Underground 3.8Mt @ 5.8g/t Au for potential 704

  9. Slide 9: Siana – Proposed Underground Mining Method

    Siana – Proposed Underground Mining Method A blueprint to deliver future growth at Siana For personal use only 1. Low cost  JORC 2012 Ore Reserve to be announced as part of updated open pit production Feasibility Study 2. Underground potential  Detailed review of proposed underground mining method

  10. Slide 10: The Future – Exploration and Growth

    The Future – Exploration and Growth Surigao del Norte – one of the most mineralised provinces in one of the most mineralised countries globally For personal use only 1.  Exploration targets identified Low cost open pit production  Increase in near-mine and regional exploration activities 2. Underg

  11. Slide 11: Mapawa Project

    Mapawa Project Maiden resource paves the way for Scoping Study; longer term exploration upside For personal use only 1. Low cost  20km north of Siana open pit production  JORC 2012 Indicated and Inferred Mineral Resource for LSY deposit of 2. Underground 8.8Mt @ 1.0g/t Au for 289,000oz potential 

  12. Slide 12: Mapawa Project

    Mapawa Project Scoping Study paves the way for engineering studies; longer term exploration upside For personal use only 1. Low cost  Successful 2016 Scoping Study indicates open pit potential to develop an initial open pit production operation based on the Mapawa LSY 2. deposit, with ore delivered

  13. Slide 13: Processing Plant

    Processing Plant Only modern operating gold plant in a highly endowed world-class mining region For personal use only Modern 1.1Mtpa gravity and carbon-in-leach (CIL) 1. Low cost  open pit production processing facility  Constructed in 2011 2. Underground potential  Heart of the plant is an Outot

  14. Slide 14: Management Track Record – Recent Achievements

    Management Track Record – Recent Achievements Realising our potential at Siana and beyond For personal use only  Gold production on track to achieve higher end of 1. Low cost open pit FY2016 guidance at 57-60,000oz production 2.  Operational improvements completed – upgrade Underground potential o

  15. Slide 15: Summary: Key Investment Takeaways

    Summary: Key Investment Takeaways ASX-listed gold producer operating in the Philippines For personal use only 1. Low-cost production from open pit operations at Siana – Open pit forecast to produce 181,000oz at AISC of US$740-790/oz from July Red 5 has a clear 2015 to FY2018 strategy to build – Oper

  16. Slide 16: Disclaimer and Competent Person’s Statement

    Disclaimer and Competent Person’s Statement For personal use only Competent Person’s Statement for JORC 2012 Mineral Resource and Ore Reserve The information in this report that relates to Mineral Resources and Ore Reserves for the Siana Open Pit is extracted from the report titled Siana Open Pit Mi

  17. Slide 17: Thank you.

    For personal use only Thank you. Mark Williams (Managing Director) Australia Kevin Dundo (Chairman) Red 5 Limited Level 2, 35 Ventnor Avenue Web: www.red5limited.com West Perth, Western Australia 6005 E-mail: info@red5limited.com Ph: + 61 8 9322 4455 17