  1. Slide 1: Sacramento River Joint Intake and Fish Screen Project

    Finalist in Clair A. Hill Agency Award for Excellence Sacramento River Joint Intake and Fish Screen Project Reclamation District 2035/ Woodland-Davis Clean Water Agency RD2035 Yolo County, CA

  2. Slide 2: The project success was due to the collaboration of all parties involved

    The project success was due to the collaboration of all parties involved RD2035

  3. Slide 3: Project partners

    6) Stantec RD2035 © \ Sy NATIONAL 6, Ce, pO ATMOSPHe, “ A <s Noiws\s\ BS iseaiwaier Agency |ENT OF THE DEPART INTER alii a 20 Réay oF ecu auntO RD2035

  4. Slide 4: The new facility replaced one of the largest unscreened intakes on the Sacramento River

    The new facility replaced one of the largest unscreened intakes on the Sacramento River which dates back to 1919 New Facility Old Intake RD2035

  5. Slide 5: Restoring the ecosystem while building a more secure and sustainable water supply

    Restoring the ecosystem while building a more secure and sustainable water supply RD2035

  6. Slide 6: The new facility is a cubic-feet-per-second screened diversion of river water

    The new facility is a 400 cubic-feet-per-second screened diversion of river water RD2035

  7. Slide 7: Stainless Steel Profile Screen, 1.75 mm openings

    Stainless Steel Profile Screen, 1.75 mm openings RD2035

  8. Slide 8: Flow regulating baffles for fish screens and automated traveling brush cleaner

    Flow regulating baffles for fish screens and automated traveling brush cleaner RD2035

  9. Slide 9: High pressure sediment control system to remove sediment from wetwell

    High pressure sediment control system to remove sediment from wetwell RD2035

  10. Slide 10: Refugia between each fish screen panel to protect juvenile salmonids

    Refugia between each fish screen panel to protect juvenile salmonids from predator fish RD2035

  11. Slide 11: RD2035 and WDCWA pumps

    RD2035 and WDCWA pumps RD2035

  12. Slide 12: Siphon assist system for energy savings

    Siphon assist system for energy savings RD2035

  13. Slide 13: Electrical switch gear and control panel

    Electrical switch gear and control panel RD2035

  14. Slide 14: Outlet piping to deliver water to agricultural and urban communities

    Outlet piping to deliver water to agricultural and urban communities RD2035

  15. Slide 15: The new joint intake and fish screen facility provides significant benefits to the environment

    The new joint intake and fish screen facility provides significant benefits to the environment, and supports the goals of protecting endangered fishery species RD2035

  16. Slide 16: The new facility provides a continued reliable water source

    The new joint intake and fish screen facility provides a continued reliable water source for both agricultural and urban communities RD2035

  17. Slide 17: A significant milestone for the Anadromous Fish Screen Program

    “A significant milestone for the Anadromous Fish Screen Program, it represents completion of the screening of one of the last major large previously unscreened diversions on the Sacramento River.” Rick Woodley, the Bureau of Reclamation’s Regional Resources Manager RD2035

  18. Slide 18: The project incorporates the very latest in fish screening design and technology

    “The project incorporates the very latest in fish screening design and technology, resulting in the highest levels of fish protection while still reliably providing water to farms, cities and wildlife habitats.” Dan Meier, Retired Program Manager for the U.S. Fish and Wildlife Service’s Anadromous F