Pacific Drilling — Investor Presentation (February 2013)
27 slides from Pacific Drilling's investor presentation, Feb 4, 2013
Slide 1: Investor Presentation
Investor Presentation February 4, 2013 Exhibit 99.1
Slide 2: Forward-looking statements
Certain statements and information in this presentation may constitute “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. Forward-looking statements include words or phrases such as “believe,” “expect,” “anticipate,” “plan,” “intend,” “foresee,”
Slide 3: Company Profile
Company Profile Committed to being the Preferred Ultra-Deepwater Drilling Contractor • Most modern floater fleet • Exclusively focused on ultra-deepwater • NYSE: PACD • Market Cap: $2.3 Billion (1) • Employees: >1,000 • Contract Backlog: $3.3 Billion • Fleet: 8 ultra-deepwater drillships • 4 Operati
Slide 4: Becoming the Preferred Ultra-Deepwater Drilling Contractor
1Q2011 1Q2012 1Q2013 Becoming the Preferred Ultra-Deepwater Drilling Contractor 100% of Enterprise Value Invested from - Number of Rigs Number of Drilling Contracts Contract Backlog (billion) Aggregate Capital Raised (billion) Number of Employees Stock Listing $1.5 $2.1 $3.3 $3.9 $4.2 $4.7 (2) ~500
Slide 5: Performance Excellence
| Performance Excellence Growth Capital Management Pacific Drilling yin
Slide 6: Performance Excellence Starts with Sustainable Differentiation
Strong Team • Transparency • Delivering on promises • Experience Asset Quality • Right sized fleet • Consistency • Technology Functional Excellence • Right resources • Performance management • Processes Targeted Approach • Clients • Geographies Performance Excellence Starts with Sustainable Differen
Slide 7: Newest and Most Capable UDW Fleet in the Industry
Noble Transocean Seadrill Ensco Newest and Most Capable UDW Fleet in the Industry Area of bubble represents total enterprise value, including committed capital expenditures. Average Floater Fleet Depth and Age (3) More Modern Deeper Water Average Water Depth (Ft.) Diamond Offshore North Atlantic Dri
Slide 8: Newer Rigs Enjoy Higher Utilization Rates Throughout Cycle
Newer Rigs Enjoy Higher Utilization Rates Throughout Cycle Floater Utilization Since 2008 by Build Cycle (4) 2007-Current 1998-2006 1971-1978 1979-1997 Utilization %
Slide 9: Dual Gradient Drilling: Game-Changing Technology
Dual Gradient Drilling: Game-Changing Technology Value to Operators Graphic source: May 2011 BOEMRE Report “Risk Profile of Dual Gradient Drilling” Offshore Magazine (May 1 st , 2010) “It’s easier, safer, better for the environment, less expensive, the risks decrease, and the outcomes are more predi
Slide 10: Performance Excellence Delivers Enhanced Margins
Performance Excellence Delivers Enhanced Margins Maximize Revenues + Control Costs • Standardized equipment and procedures • Application of best practices • Enhanced relationships with clients and potential clients • Better retention of key personnel • Optimize levels of fleet spares and inventory /
Slide 11: Contracting Success Maximizes Revenue Potential
Contracting Success Maximizes Revenue Potential Daily contract revenue does not include mobilization, demobilization, contract preparation and client contract upgrade revenues. Pacific Drilling Contract Dayrate (6) ($K) Range of Contract Dayrates by Term and Year Signed for 5 th Gen and Later Ultra-
Slide 12: $3.3 Billion Backlog with Blue Chip Operators
Chevron Nigeria, $475k/d 3 year contract Petrobras Brazil, $458k/ 3 year contract Chevron Gulf of Guinea, $660k/d Option for 1 year 2 year contract of additional term d Daily contract revenue does not include mobilization, demobilization, contract preparation and client contract upgrade revenues. $3
Slide 13: Focus on Uptime Optimizes Revenue Capture
Exceeding 95% Target Post Ramp-up Focus on Uptime Optimizes Revenue Capture Cumulative Revenue Efficiency by Period Revenue efficiency is defined as actual contractual dayrate revenue (excludes mobilization fees, upgrade reimbursements and other revenue sources) divided by the maximum amount of cont
Slide 14: Exceptional Safety Performance
Exceptional Safety Performance LTIF is defined as Lost Time Incidents (LTI) per million manhours. IADC LTIF through October 31, 2012. • No lost time incidents (LTIs) during construction (approximately 775,000 man hours) • Pacific Bora just achieved 2 years without an LTI • Pacific Scirocco and Pacif
Slide 15: Pacific Drilling Active in All Core Ultra-Deepwater Areas
A Global Growth Market Pacific Drilling Active in All Core Ultra-Deepwater Areas • Significant exploration success in ultra- deepwater and remote areas • USGoM, Brazil and West Africa continue to be major markets driving demand • Development drilling expected to increase globally Areas With Active U
Slide 16: UDW Demand Expected to Exceed Supply Beyond 2015
UDW Demand Expected to Exceed Supply Beyond 2015 Supply and Demand Forecast (7) For rigs with water depth capability of 7,500 ft or greater. Includes only announced newbuild orders. Supply Demand Supply Demand Supply Demand
Slide 17: Advanced Drillships Deliver on Industry Requirements
38% 10% Advanced Drillships Deliver on Industry Requirements Industry Trends Over 48% of Floaters Greater than 10 Years Old 1. Challenges of remote drilling sites 2. Drilling deeper and with longer offsets 3. Greater drilling efficiency to reduce total well costs 4. Advances in well construction tec
Slide 18: Dayrates Have Responded to the Tightening Market
Dayrates Have Responded to the Tightening Market All-in Contract Costs and Term for 5 th Gen and Later Ultra-Deepwater Floaters (9) Accounts for dayrate cost as well as mobilization and upgrades to arrive at a total projected backlog cost to the operator, where available. Blue data points denote Pac
Slide 19: Targeted Rig Fleet Disciplined Growth and Risk Mitigation
Targeted 12 Rig Fleet Disciplined Growth and Risk Mitigation • Long term market view • Financing costs • Maximum 2 uncommitted newbuilds • Turnkey shipyard contracts • Proven rig designs built by world class shipyard • Construction quality oversight • Mature delivery and startup processes • Manageme
Slide 20: Consensus Forecasts: PACD Offers Superior Growth
Consensus Forecasts PACD Offers Superior Growth Source: Thomson Reuters consensus mean as of 30 January 2013; analysis by Pacific Drilling. PACD Consensus Projected CAGR = 44% ORIG PACD RDC VTG NE DO ESV SDRL RIG Projected EBITDA Growth
Slide 21: UDW Contract Economics Create Significant Value
Total value created over the first 5 years equals 94% of estimated total project cost, including 2 nd BOP UDW Contract Economics Create Significant Value Source: Internal PACD Projection Assumptions: Revenue includes adjustment for revenue efficiency and 80% capture of cost inflation; daily opex of
Slide 22: Rapid Deleveraging of Existing Fleet Increases Shareholder Value
Rapid Deleveraging of Existing Fleet Increases Shareholder Value Forecast for 2013-2015 by Pacific Drilling. Assumes fleet size of 8 rigs; closing of $1B secured senior credit facility used to finance remaining capex for Pacific Sharav and Pacific Meltem ; contemplated debt financing for Pacific TBN
Slide 23: Strong Profitability and Cash Flow Enables Growth and Dividends
Strong Profitability and Cash Flow Enables Growth and Dividends ROE is defined as net income divided by shareholders’ equity. Forecast for 2013-2015 by Pacific Drilling. Assumes fleet size of 8 rigs; closing of $1B secured senior credit facility used to finance remaining capex for Pacific Sharav and
Slide 24: Pacific Drilling
——_—_—_—_—_————, Pacific Drilling
Slide 25: Investor Contact
Investor Contact Pacific Drilling Amy Roddy Director, Investor Relations 3050 Post Oak Blvd #1500 Houston, Texas USA Phone: +1 832-255-0502 Email: Investor@pacificdrilling.com www.pacificdrilling.com
Slide 26: Footnotes
Footnotes 1. Closing stock price of $10.64 as of February 1, 2013 and 216.9 MM shares outstanding. 2. Excludes $1B debt financing for the Pacific Sharav and Pacific Meltem expected to close in 1Q2013. 3. Enterprise value data from Thomson Reuters as of January 29, 2013. Average water depth and avera
Slide 27: Appendix: Maintaining Flexibility in Financing
Amortizing Balloon Total Maturity Amortizing Balloon Total Maturity Appendix: Maintaining Flexibility in Financing Debt Outstanding as of December 31, 2012 ($MM) $2.2B of equity raised • ~$1.6B from main sponsor • $600MM from private placement April 2011 • $57MM from IPO November 2011 First seven ri
Pacific Drilling — Investor Presentation (February 2013) on 6ix