Santos Limited · ASX:STO

Santos — Non-Deal Roadshow (June 2014)

38 slides from Santos's roadshow presentation, June 2014

  1. Slide 1: Investor Roadshow

    Investor Roadshow Santos June 2014 We have the energy.

  2. Slide 2: Disclaimer and important notice

    Disclaimer and important notice This presentation contains forward looking statements that are subject to risk factors associated with the oil and gas industry. It is believed that the expectations reflected in these statements are reasonable, but they may be affected by a range of variables which c

  3. Slide 3: Santos overview

    Santos overview A leading energy company in Australia and Asia Australia’s leading domestic gas producer 2013 production 140,000 boe/d (70% gas/30% liquids) Bay of Bengal Top-20 Australian Securities Phu Khanh Exchange listed company Nam Con Son Market capitalisation West Natuna $14 billion (May 201

  4. Slide 4: Our strategy

    Our strategy Strong LNG project delivery positions Santos to achieve 80 to 90 mmboe of production by 2020 AUSTRALIA LNG ASIA Growing Cooper Basin gas First LNG production from PNG Peluang project delivered in capacity to meet higher LNG in April 2014, ahead of March 2014 on budget and demand and cap

  5. Slide 5: Eastern Australia gas market transformation

    Eastern Australia gas Additional supply is required to meet increased market transformation demand and Santos well placed to benefit Eastern Australia gas demand (PJ) Tripling of gas demand creating market tightness 2,500 Recent east coast gas contracts >$8/GJ 2,000 APLNG 1,500 GLNG New sources of g

  6. Slide 6: Increasing Cooper Basin gas production

    Increasing Cooper Basin Targeting three key areas during 2014-16 gas production enabling cost efficiencies from increased scale 2 rig, pad development focus Santos acreage Gas field Moomba Oil field High deliverability Gas pipeline Big Lake Oil pipeline ~70 wells Ballera Jackson Extending infrastruc

  7. Slide 7: Australian shale

    Australian shale Cooper and McArthur Basins have some key technical attributes comparable to successful US shale basins Organic matter Hydrocarbon Mineralogy TOC wt% content Non-clay content McArthur Basin mmboe/km2 % Darwin Cooper Tennant Creek Mount Isa McArthur Alice Springs Gladstone Wallumbilla

  8. Slide 8: Cooper Basin unconventional exploration program

    Cooper Basin Building knowledge and technological capacity to unconventional ‘crack the code’; two shale wells now producing exploration program Confirmed prospective resource through coring, logs and other analysis Moomba 192 Proved the Basin Centre Gas accumulation in the Nappamerri Trough; over 1

  9. Slide 9: Santos' LNG portfolio

    Santos’ LNG portfolio Strong project delivery and performance supportive of backfill and expansion opportunities Producing Darwin LNG PNG LNG 11.5% equity 13.5% equity 3.7 mtpa plant capacity 6.9 mtpa plant capacity Fully contracted to 2022 6.6 mtpa contracted to 2034 Under construction GLNG 30% equ

  10. Slide 10: Strong Asian demand for LNG

    Strong Asian demand for Large opportunity exists for new projects to supply LNG into the Asian market Asian LNG supply and demand mtpa Asia leads global LNG demand with LNG forecast to meet over 50% of 400 Asia’s gas needs 350 − Asian LNG demand grows at CAGR of 5.4% 300 − By 2030, over 70% of globa

  11. Slide 11: Global LNG demand vs US LNG in 2025

    Global LNG demand US LNG alone will not fill the gap vs US LNG in 2025 mtpa 500 Constraints on US LNG exports 400 Contestable ─ Buyer appetite for ~100 mtpa 160 market diversity of supply US LNG ─ Not all US LNG projects 300 will secure financing ~40-60 mtpa ─ LNG plant constructions and labour cons

  12. Slide 12: US LNG pricing

    US LNG pricing Portfolio players and trading houses dominate US LNG off-take with higher pricing Sabine Pass LNG pricing - 2012 Portfolio player pricing terms for resale - 2013 US$/mmBtu US$/mmBtu 16 16 Spot $14.6/mmBtu 14 $13.5/mmBtu 14 6.5 3 12 12 10 3 10 8 8 1 1.6 6 6 1.6 6-7 6-7 4 4 2 2 0 0 2020

  13. Slide 13: First LNG from PNG LNG

    First LNG from PNG LNG 2 trains producing and first cargoes of LNG shipped ahead of schedule Location Papua New Guinea Project Santos 13.5%, partners ExxonMobil, Oil Search, NPCP, JX Nippon, MRDC, and Petromin PNG LNG plant 6.9 mtpa, sold to: capacity CPC (1.2 mtpa), Osaka Gas (1.5 mtpa), Sinopec (2

  14. Slide 14: PNG LNG potential expansion

    PNG LNG potential Existing infrastructure can support potential future expansion expansion. As an owner of the foundation project infrastructure, Santos is well placed SW Hides Deep NE Hides 3P potential within base project Hides Deep to be spudded in Koi lange late-2014 ─ Exploration prospect below

  15. Slide 15: GLNG project summary

    GLNG project summary The GLNG project is over 80% complete and on track for first LNG in 2015 Location Queensland, Australia Project Santos (30% and operator), PETRONAS, Total partners and KOGAS LNG plant 7.8 mtpa of LNG; 7.2 mtpa has been sold to capacity PETRONAS and KOGAS Gross capital US$18.5 bi

  16. Slide 16: Fairview well performance

    Fairview well performance Performance of Fairview wells continues to exceed expectations – average gas capacity of 2.2 TJ/day per well Reservoir performance better Fairview well performance as at 31 May 2014 183 wells connected than expected Optimum gas Optimum water Total gross field well capacity

  17. Slide 17: Roma well performance

    Roma well performance Roma wells online and dewatering, supporting individual well capacity of 0.5 TJ/day 52 development wells online: Roma well performance as at 31 May 2014 − 22 development wells that are dewatering into the Roma Hub 2 Optimum gas Optimum water capacity (TJ/day) capacity (bbl/day)

  18. Slide 18: Drilling and completions

    Drilling and completions Continuing to drive down well costs Over 560 wells drilled since FID Over 30% reduction in drilling and completion costs per well since FID ─ Average 2013 D&C cost of $1.35 million per development well (30% wells drilled in Fairview, 70% drilled in Roma) Current fleet of 6 d

  19. Slide 19: Upstream construction

    Upstream construction Hub construction is nearing completion Fairview Hub 5 160 TJ/day gross gas capacity 4 ML/day water handling facilities Commissioning is underway Fairview Hub 4 250 TJ/day gross gas capacity 20 ML/day water handling facilities Hub construction >98% complete and commissioning wil

  20. Slide 20: Capital expenditure and opex guidance

    Capital expenditure and US$18.5 billion1 capex from FID to the end of 2015 opex guidance 2016-20 average capex estimate A$1 billion pa Vast majority of 2016-20 expenditure is the upstream, and Capital expenditure estimate includes: FID to end of ─ Drilling and completion of new wells (~200–300 per a

  21. Slide 21: Third party gas supply

    Third party gas supply Third party gas generates significant value for the project Attractive oil-linked Supplier Quantity TJ/day Starts Term Delivery point Price basis gross margins Santos portfolio 750 PJ 140 2015 15 years Wallumbilla Oil-linked ‘Horizon’ Provides operational Origin 365 PJ 100 201

  22. Slide 22: Gas transmission pipeline

    Gas transmission pipeline Hydrotesting and de-watering complete, final drying in progress 42 inch diameter 420-kilometre pipeline Strong progress as pipeline draws to completion: ─ All of the 420-kilometre pipeline is in the ground, hydrotested and de- watered ─ Marine crossing tunnel is complete ─

  23. Slide 23: GLNG plant site, Curtis Island

    GLNG plant site, Curtis Two-train LNG plant with a nameplate capacity of Island 7.8 mtpa GLNG plant site, May 2014 Utilities Area Includes Central Control Camp Building Accommodation 1,680 beds Gas Inlet and Refrigerant Storage Material Offloading Facility Train 2 3.9 mtpa nameplate capacity Flare T

  24. Slide 24: LNG trains

    LNG trains All 82 Train 1 modules set; 11 of 29 Train 2 modules set, 7 modules in transit to site and 11 under assembly in Batangas, Philippines LNG trains, May 2014. 24 | INVESTOR ROADSHOW - JUNE 2014

  25. Slide 25: LNG jetty

    LNG jetty Over 95% complete with the installation of quick release mooring hooks, capstans, fenders, vessel access gangway tower and loading arms complete LNG jetty, 360 metres long and suitable for ships with capacity up to 220,000m3, May 2014 25 | INVESTOR ROADSHOW - JUNE 2014

  26. Slide 26: Curtis Island, May 2014

    Curtis Island, 31 May 2014 APLNG QCLNG GLNG 26 | INVESTOR ROADSHOW - JUNE 2014

  27. Slide 27: Bayu-Undan / Darwin LNG

    Bayu-Undan / Darwin LNG Strong production in 2014. Progress on Phase 3 offshore expansion. Multiple feed gas options for backfill and expansion emerging Maintain high margin asset Site for new ─ track record of reliable delivery LNG trains (400+ cargoes since 2006; above contract production) Site fo

  28. Slide 28: Asian growth

    Asian growth Peluang project delivered on schedule and budget; Dua on track for first oil in mid-2014. Peluang, Indonesia (Santos 67.5%) ─ Project delivered in March 2014, on budget and ahead of schedule ─ Expected gross production rate of 25 mmscf/day Dua, Vietnam (Santos 31.875%) ─ On track for fi

  29. Slide 29: Browse Basin

    Browse Basin Material resource build to support multiple commercialisation options including collaboration with adjacent resource owners for brownfield expansion Significant resource build across Grand prospect Bassett West the basin discovery ─ Increase in Crown resource confidence through integrat

  30. Slide 30: Strong business outlook

    Strong business outlook Operating cash flow is expected to double by 2016, providing the foundation for further growth and increased shareholder returns Clear production growth outlook Growing margins Robust funding position provides the capacity to fund execution of strategy Committed to increasing

  31. Slide 31: Appendix

    Appendix June 2014 We have the energy.

  32. Slide 32: 2013 Full-year financial result

    2013 Full-year Growth in sales revenue, EBITDAX and EBIT. financial result Net profit after tax of $516 million in line with 2012 2013 Change Full-year on 2012 Production 51 mmboe -2% Sales revenue $3,602 million +12% EBITDAX $1,992 million +7% EBIT $886 million +6% Net profit after tax $516 million

  33. Slide 33: Strong funding position

    Strong funding position $3.4 billion in balance sheet capacity to fund execution of business strategy and minimise financing risk. Minimal debt maturities to 2016 Available liquidity Debt maturity profile Notes mature in 2070, with A$billion A$million Santos option to redeem in 2017 4 2,000 0.4 1,60

  34. Slide 34: Capital expenditure

    Capital expenditure 2013 was peak year for capex. 2014 guidance unchanged at $3.5 billion Capital expenditure 2014 guidance of $3.5 billion (excludes capitalised interest) (excluding capitalised interest) A$billion ─ GLNG $1.4 billion 4 3.5 ─ PNG LNG $0.3 billion 4.1 3 3.2 ─ Eastern Australia $1.1 b

  35. Slide 35: GLNG capex US$18.5 billion

    GLNG capex US$18.5 billion GLNG gross capital cost estimate unchanged FID to Dec 2013 Capex estimate from FID 2013 capex capex until the end of 2015 $billion A$1 A$1 US$2 A$3 LNG project capex (100%) 5.7 13.7 18.5 20.7 Santos 30% share 1.7 4.1 5.6 6.2 Non-LNG project capex (Santos 30% share) SIB cap

  36. Slide 36: 2014 guidance

    2014 guidance Item 2014 guidance Production 52-57 mmboe Production costs $820-880 million DD&A expense $18.50/boe Royalty related taxation expense1 (after tax) $60 million Capital expenditure (including exploration & evaluation)2 $3.5 billion 1 Royalty related taxation expense guidance based on an a

  37. Slide 37: 2014 exploration schedule

    2014 exploration schedule Delivers on our exploration strategy across super basins, frontier basins and unconventional basins Santos Well Name Basin / Area Target Timing Interest % Manta-1 PNG Gas 301 C&S, pending testing South Sumatra CSG wells Sumatra CSG 102 1H 2014 Gas discovery, Mt Kitty-1 Amad

  38. Slide 38: Contact information

    Contact information Head Office Adelaide Andrew Nairn Ground Floor, Santos Centre Group Executive Investor Relations 60 Flinders Street Direct: + 61 8 8116 5314 Adelaide, South Australia 5000 Email: andrew.nairn@santos.com GPO Box 2455 Andrew Hay Adelaide, South Australia 5001 Telephone: +61 8 8116