Itm Power Plc · LSE:ITM

Itm Power — FY2022 Earnings Presentation

28 slides from Itm Power's earnings presentation, Sep 15, 2022

  1. Slide 1: Results Presentation: Full Year to April 30th 2022

    Results Presentation F u l l Ye a r t o A p r i l 3 0 th 2 0 2 2 1 4 th S e p t e m b e r 2 0 2 2 Graham Cooley, CEO | ITM Power PLC Andy Allen, CFO | ITM Power PLC

  2. Slide 2: Contents

    Results Presentation Contents Bessemer Park | June 2022 An important year: ▪ Macro Picture ▪ Product Roadmap ▪ Production Roadmap ▪ Finances & Guidance ▪ Summary Market leader | Strong momentum | Global markets | Strong partnerships

  3. Slide 3: Macro picture driven by Geopolitics

    Results Presentation Macro picture driven by Geopolitics Time for Green Hydrogen: ▪ Geopolitics | Gas price | Cost parity ▪ Green hydrogen at cost parity with Industrial H2 Grey H2 @ $10.65/kg ▪ A market of 70mtpa equivalent to 600GW of Electrolysis ▪ Energy security plans Grey H2 @ $4.27/kg ▪ First

  4. Slide 4: Macro picture driven by Geopolitics

    Results Presentation Macro picture driven by Geopolitics Grey H2 @ $10.65/kg Grey H2 @ $4.27/kg Cost parity | Low volatility | Energy security | Zero carbon

  5. Slide 5: Backlog and WIP

    Results Presentation Backlog Backlog and WIP ▪ Total: 755MW ▪ Contracted: 77MW | Negotiation: 340MW | Preferred supplier: 338MW ▪ Negotiation unchanged since October 2021 ▪ Delays outside our control: Policy, a risk-off world and FIDs ▪ Delays within our control: New product introduction Market lead

  6. Slide 6: We've been cracking on

    Results Presentation We ’ v e b e e n c r a c k i n g o n We’ve been cracking on ▪ Starting serial manufacture ▪ FOAK product developed ▪ Strong Linde relationship ▪ Running Refhyne at full load ▪ First hydrogen at Leuna during SAT of a module ▪ Investing in skills ▪ Developing a new manufacturing s

  7. Slide 7: Product Roadmap

    (°) ITM POWER Product Roadmap

  8. Slide 8: Product Roadmap

    Results Presentation Product Roadmap MEP 1.0 (2MW) Improved: MEP 2.0 (2MW) Improved: 10MW Module • Pressure: 20bar Pressure • Pressure: 30bar up 50% Scale • Announced on 7th July • Reference Plant: Refhyne Efficiency • Reference Plant: Leuna Manufacturing • Flexible platform • Status: Demonstrated O

  9. Slide 9: Stack Performance: MEP 1.0 on-site vs. targets

    Results Presentation MEP 1.0 | On site Stack Performance vs. targets Stack Performance 60 58 FCH-JU SoA 2017 Stack Efficiency (kWh/kg) 56 FCH-JU Target 2020 54 Reducing OPEX 52 FCH-JU Target 2024 50 MEP 1.0 (Refhyne) 48 46 44 42 40 0 0.5 1 1.5 2 2.5 3 3.5 Current Density (A/cm2) Reducing CAPEX

  10. Slide 10: Stack Performance: Competitive Landscape

    Results Presentation Competitive Landscape Stack Performance 60 58 Stack Efficiency (kWh/kg) 56 FCH-JU Target 2024 54 Reducing OPEX 52 PEM 50 Average MEP 1.0 (Refhyne) 48 46 MEP 2.0 (Leuna) 44 Continuous Improvement 42 40 0 0.5 1 1.5 2 2.5 3 3.5 Current Density (A/cm2) Reducing CAPEX

  11. Slide 11: Leuna

    Results Presentation Leuna Market leader | Strong momentum | Global markets | Strong partnerships

  12. Slide 12: Production Roadmap

    (°) ITM POWER Production Roadmap

  13. Slide 13: Five Year Plan: Manufacturing Roadmap

    Five Year Plan Manufacturing Roadmap Oct 2021 Plan International Roll Out in GW 5.0 UK Gigafactory 2.0 in GW Bessemer Park Gigafactory in GW 2.5 2.5 1.0 1.5 1.5 1.0 1.0 1.0 5.0 3.5 1.0 1.5 1.5 1.5 New Plan 1.0 Nameplate capacity Planned UK expansion Demand led international expansion ▪ Semi automate

  14. Slide 14: Five Year Plan: Facilities Plan

    Five Year Plan Fa c i l i t i e s P l a n Bessemer Park: Europa Drive: Testing Site Scope: Kurt Strasse: 134,000 sqft 18,000 sqft Outdoor capacity 17,000 sqft 1.5GW pa capacity 5MW platform dev. 15 - 25MW power Spares holding Head Office Engineering dev. FAT testing Control centre Technology Centre

  15. Slide 15: Current Facilities | Bessemer Park

    Five Year Plan Current Facilities | Bessemer Park Remodelling Bessemer: ▪ Committed installed capacity ▪ Optional additional capacity (8 months notice) ▪ 1.5GW by 2024 ▪ Based on MEP30 skids and stacks Market leader | Strong momentum | Global markets | Strong partnerships

  16. Slide 16: Testing Site Scope

    Five Year Plan Te s t i n g S i t e S c o p e Testing Site Scope: ▪ Outdoor testing capacity and product storage ▪ FAT and validation testing ▪ 15MW - 25MW power ▪ Renewables direct coupling desirable Market leader | Strong momentum | Global markets | Strong partnerships

  17. Slide 17: Finances & Guidance

    (°) ITM POWER Finances & Guidance

  18. Slide 18: Annual Results: Themes of delivery and positioning

    Results Presentation Annual Results Themes of delivery and positioning: ▪ Shell Refhyne I commissioning ▪ Overcoming Leuna delays | supply chain, manufacturing & testing ▪ Building key resource for delivery ▪ Investment for future products and manufacturing ▪ Building to WIP ▪ Motive joint venture M

  19. Slide 19: Annual Results: Financial Snapshot

    Results Presentation Annual Results Financial Snapshot: Income Statement: ▪ Sales revenue: £5.6m (2021: £4.3m) up 30% ▪ Adjusted EBITDA Loss* of £39.7m, (£21.7m), increased by 83% Picture of Annual Report ▪ Gross losses £23.5m (2021: £6.5m), increase by 261% Balance sheet: ▪ Cash balance (excluding

  20. Slide 20: Annual Results – Revenue

    Results Presentation Annual Results – Revenue Product Revenue Appearing in current financial year (22-23)

  21. Slide 21: Annual Results – Gross margin

    Results Presentation Annual Results –Gross margin First-of-a-kind Contract Provision Delivery Warranty Manufacturing, Testing, Refhyne commitment to Provision activities ref | EPC projects – staff 1% Utilised costs

  22. Slide 22: Annual Results – Losses

    Results Presentation Annual Results – Losses Workforce Optimisation R&D costs Operations Improvement of £4.2m

  23. Slide 23: Annual Results – Cash

    Results Presentation Annual Results – Cash Losses Building WIP Investments for growth: Improving payment terms Sales channels & partnerships Provision movement Products & Manufacturing

  24. Slide 24: Key Hires

    Results Presentation Key Hires Team Development: ▪ Tim Calver, Commercial Director ▪ Denise Cockrem, NED ▪ Vicky Williams, CoSec Market leader | Strong momentum | Global markets | Strong partnerships

  25. Slide 25: Resources: Investment in People

    Results Presentation Resources Investment in People: ▪ Strengthening the Board & Management Team ▪ New Starters focused on delivery ▪ Apprentices and early school leavers programme Market leader | Strong momentum | Global markets | Strong partnerships

  26. Slide 26: Guidance

    Results Presentation Guidance Current Year Guidance: ▪ Product revenue in the range of £23-28m ▪ MW delivered in the range 48-65 MW ▪ Adjusted EBITDA loss of £45-50m with increased focus on overheads ▪ Capital expenditure of £30-40 million, with a focus on development costs ▪ Working capital of £40-

  27. Slide 27: Summary: An important year

    Results Presentation Summary An important year: ▪ Cost parity with Industrial hydrogen (market size 70mtpa) ▪ Driving adoption in ammonia and refining ▪ FIDs pending policy ▪ Strong operational progress ▪ Leuna deployment with Linde Engineering an important learning curve ▪ Ensuring capex efficiency

  28. Slide 28: Results Presentation

    Results Presentation F u l l Ye a r t o A p r i l 3 0 th 2 0 2 2 1 4 th S e p t e m b e r 2 0 2 2 Graham Cooley, CEO | ITM Power PLC Andy Allen, CFO | ITM Power PLC