Pure Gold Mining — Investor Presentation (August 2022)
25 slides from Pure Gold Mining's investor presentation, Aug 10, 2022
Slide 1: The Heart of Red Lake. PureGold.
The Heart of Red Lake. PureGold. August 2022
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS This Presentation contains forward‐looking statements, including but not limited to statements Alternative performance measures are furnished to provide additional information. These non- Neither this presentation nor any copy hereof may be distributed in any other jurisdi
Slide 3: The PureGold Mine, The Next Chapter in Red Lake History
The PureGold Mine, The Next Chapter in Red Lake History 3 3
Slide 4: A Canadian Gold Mine with Tier-One Potential
A CANADIAN GOLD MINE WITH TIER-ONE POTENTIAL PUREGOLD MINING INC. ✓ Positioned to Deliver Value: Operating gold mine with tier- Strategic 47 km2 land package in one potential in heart of Red Lake District the Heart of Red Lake District ✓ Updated Studies Underpin Growth Plan: Updated Mineral Resource
Slide 5: Multi-Million Ounce, High Grade Deposit
MULTI-MILLION OUNCE, HIGH GRADE DEPOSIT UPDATED MINERAL RESOURCE ESTIMATE AUGUST 2022 1.65 million ounces Long Section of 2022 of gold at SRK Block Model 7.4 g/t within 6.9 million tonnes in the Indicated category 0.37 million ounces of gold at 6.4 g/t within 1.8 million tonnes in the Inferred categ
Slide 6: A Strong Foundation for Future Growth
A STRONG FOUNDATION FOR FUTURE GROWTH UPDATED MINERAL RESOURCE ESTIMATE AUGUST 2022 ✓ Third-party review and ✓ 77 new sub-domain comprehensive update by SRK wireframes constructed to capture deeper ✓ Robust estimate that aligns understanding of mineralized closely with mining to date lenses Updated
Slide 7: Transitioning to Austin & South Austin
TRANSITIONING TO AUSTIN & SOUTH AUSTIN UPDATED MINERAL RESOURCE ESTIMATE AUGUST 2022 Rotated Plan View of 2022 SRK Geological Domain Models McVeigh Austin & South Austin • 5% of Indicated ounces in • 89% of Indicated ounces in Madsen Deposit Madsen Deposit • Majority of mining to date • Accounts for
Slide 8: Updated Pre-Feasibility on Track for Q4 2022 Release
UPDATED PRE-FEASIBILITY ON TRACK FOR Q4 2022 RELEASE SRK PRE-FEASIBILITY STUDY Project Timeline Study Team SRK • Paul Dagenais, Project Manager • Wayne Barnett, Geology • Cliff Revering, Resource • Gary Macsporran, Mining • Neil Winkelman, Optimization/Modelling • Mark Liskowich, Permitting • Adrian
Slide 9: Great gold mines aren't found. They're built.
Great gold mines aren’t found. They’re built. 9
Slide 10: Improving the Existing Business: Operations Chronology Year to Date
IMPROVING THE EXISTING BUSINESS OPERATIONS CHRONOLOGY YEAR TO DATE Jan/Feb March April May June Jul/Aug Phase 1 of cost savings initiatives New mine Reorganized planning leadership process Resumed full team - Mill on 2x2 established mill schedule, - Reduced definition headcount by 75 - Turnaround -
Slide 11: Significant Changes Made to Mine Planning Process
SIGNIFICANT CHANGES MADE TO MINE PLANNING PROCESS MINE PLANNING PROCESS (MARCH 2022) Progress: • Major focus on revamping Deswik setup, for use in monthly planning process • Defined MSO settings • Generated first 3mo plan Issues: • Inadequate geology review of mine designs within plan • Disconnect b
Slide 12: A New System Designed for Success
A NEW SYSTEM DESIGNED FOR SUCCESS MINE PLANNING PROCESS (MAY/JUNE 2022) Progress: • Current process used to develop latest 3mo plan including a weekly 7+21 rolling forecast • Testing and refining of the process will continue until a robust process is in place 12
Slide 13: Data, Planning & Execution Roadmap
DATA, PLANNING & EXECUTION ROADMAP IMPROVING THE EXISTING BUSINESS Value Chain 13
Slide 14: Red Lake is home to some of the richest gold deposits in the world.
Red Lake is home to some of the richest gold deposits in the world. At PureGold, we’ve barely scratched the surface. 14
Slide 15: Deep Discovery Potential
DEEP DISCOVERY POTENTIAL PUREGOLD MINE ✓ The PureGold Mine has significant exploration potential with numerous targets suggesting more high-grade mineralization at depth, along strike and down-dip Current Ramp Depth: 600 metres In 2021, two new pierce points intersected 90+ metres of intense mine-st
Slide 16: Unlocking Long Term Value: The High Grade 8-Zone
UNLOCKING LONG TERM VALUE THE HIGH GRADE 8-ZONE Goldcorp PureGold HGZ Discovery 8-Zone (1995)2 • Quartz veins in • Quartz veins in Geologic flexure along flexure along 8-Zone Setting mafic-ultramafic mafic-ultramafic contact contact Key Drill • 4.3m at 466 g/t Au • 9 holes averaging Intercepts • 5.5
Slide 17: Unlocking Long Term Value: Deep Discovery Potential
UNLOCKING LONG TERM VALUE DEEP DISCOVERY POTENTIAL 1200 metre depth 8 Zone 2 1) The PureGold Mine has a 1.65 million-ounce Indicated Resource (6.9Mt at 7.44 g/t gold) and a 0.366 million-ounce Inferred Resource (1.8Mt at 6.26 g/t gold). The Mineral Resource Estimate has an effective date of December
Slide 18: Unlocking Long Term Value: Deep Discovery Potential
UNLOCKING LONG TERM VALUE DEEP DISCOVERY POTENTIAL 1200 metre depth 1995 8 Zone HGZ Discovery AD-11-01 14.3 g/t Au / 2.0m Evolution’s current mine plan to ~3000 m depth Note: Conceptual mineralization shapes indicated are conceptual only and have been interpreted from very limited drilling data incl
Slide 19: Deep Value Opportunity
DEEP VALUE OPPORTUNITY PUREGOLD MINING INC. Market Capitalization (C$ millions) 1, 2 Junior Gold Producers (<300 kozpa) Canadian Gold Developers $2,500 $2,133 $1,990 $2,000 Market Cap (C$M) $1,500 $1,404 $1,409 $1,376 $1,257 Avg. = $1.3 bn $997 $929 $964 $1,000 $843 $767 Avg. = $826 M $707 $721 $664
Slide 20: Infrastructure and Investment Underpins Value
INFRASTRUCTURE AND INVESTMENT UNDERPINS VALUE PUREGOLD MINING INC. • Over C$350 million has been invested in the PureGold Mine to date • The PureGold Mine has in place several key building blocks which underpin the mine’s future growth potential and path to becoming a +200,000 ounce per year produce
Slide 21: Our growth story has only just begun.
Our growth story has only Just Begun. 21
Slide 22: New Leadership Team Focused on Operational Excellence
NEW LEADERSHIP TEAM FOCUSED ON OPERATIONAL EXCELLENCE Mark O’Dea Terry Smith Interim President & CEO, Director Chief Operating Officer • Ph.D, P.Geo, Mining Entrepreneur • Mining Engineer • +30 years’ experience • +20 years’ experience • Co-Founder and CEO of Fronteer Gold, Founder & Exec. Chair of
Slide 23: Corporate Snapshot
PUREGOLD MINING INC CORPORATE SNAPSHOT ANALYST COVERAGE CAPITAL STRUCTURE 1 Basic Shares Outstanding 728.9 million Warrants 11.0M at $1.36, March 28, 2023 expiry 1.7M at $1.36, April 25, 2023 expiry 240.7 million 185M at $0.18, November 25, 2022 expiry 43M at $0.18, November 27, 2022 expiry Options
Slide 24: Mineral Reserves & Resources
MINERAL RESERVES & RESOURCES PUREGOLD MINING INC. Gold Grade Gold Troy Classification Deposit - Zone Tonnes (g/t) Ounces Madsen – Austin 4,147,000 6.9 914,200 Indicated Resource – Ounces by Zone Indicated Resource – Grade by Zones Madsen – South Russet 20.0 1,696,000 8.7 474,600 1% McVeigh Austin 18
Slide 25: Thank you.
Thank you. Corporate Inquiries Corporate Address TSX.V:PGM , LSE:PUR Adrian O’Brien 1900 – 1055 West Hastings Street Director IR & Communications Vancouver, BC OTCMKTS:LRTNF V6E 2E9 www.puregoldmining.ca 604 809 6890 aobrien@puregoldmining.ca
PureGold Mining — Investor Presentation (August 2022) on 6ix