Slide 1: European Metals - The Cinovec Project
EUROPEAN METALS The Cinovec Project Powering sustainable European e-mobility Mines and Money March 2021

Slide 2: Disclaimer & Cautionary Statement
DISCLAIMER & CAUTIONARY STATEMENT DISCLAIMER This presentation has been prepared by European Metals Limited (“European Metals” or the “Company”). It is not a disclosure document and should not be considered as an offer or invitation to subscribe for, or purchase any securities in the Company or as a

Slide 3: European Metals Holdings
EUROPEAN METALS HOLDINGS Keith Coughlan Executive Chairman (Australia) POWERING SUSTAINABLE EUROPEAN E-MOBILITY Richard Pavlik Executive Director (Czech Republic) Kiran Morzaria Non-Executive Director (UK) Integrated mine & lithium processing plant Lincoln Bloomfield Non-Executive Director (USA) Lar

Slide 4: EU Auto Regulations Support Significant EV Uptake
EU AUTO REGULATIONS SUPPORT SIGNIFICANT EV UPTAKE EU spends big on Just Transition Fund climate change €40 billion fund to €550 billion to be transition fossil fuels to spent on green energy climate over 2021-27 EU EU self sufficiency EU CO2 targets tighten Targeting 80% lithium €billions potential

Slide 5: European EV Sales Booming
EUROPEAN EV SALES BOOMING Other Other Fuels 0.5% Fuels 1% EV EV Diesel EV 11.9 % 20.5% 19.2% Diesel 24.3% Diesel 26.5% 23.4% Hybrids Hybrids (plugless) (plugless) 13.6% 14.2% Hybrids (plugless) 20.6 % Petrol 44.1 % Petrol Petrol 40.4% 39.6% New car sales New car sales New car sales Germany France De

Slide 6: Europe Driving Exponential Global EV Sales Growth
EUROPE DRIVING EXPONENTIAL GLOBAL EV SALES GROWTH 39M Tesla Berlin Largest battery VW goal gigafactory in the world 22 million EVs in 10 years (2021 Completion) 13M 3.2M 2020 2025 2030 Source RK Equity

Slide 7: Battery Grade Hydroxide Undersupply
BATTERY GRADE HYDROXIDE UNDERSUPPLY LITHIUM “The irreplaceable element for the DEMAND / SUPPLY electric era” VW HYDROXIDE For high energy, long range batteries UNDERSUPPLY CHINA RELIANCE 83% global hydroxide production EUROPE Source: RK Equity 80% self sufficiency target by 2025

Slide 8: Cinovec Largest Hard Rock Project in EU
CINOVEC LARGEST HARD ROCK PROJECT IN EU 8 7.22 Rest of Bigger than all other hard rock the EU projects in the EU combined 6 Cinovec 65.5% 4 2 1.68 0.76 0.71 0.38 0.27 European Infinity Zinnwald Savannah Keliber European Metals Lithium Lithium Resources Lithium

Slide 9: Proximity to End Users
PROXIMITY TO END USERS Poland Localized hydroxide close to key cathode, battery & auto makers. 500 km from Cinovec Critical for EU’s 80% Germany Cinovec Czech Republic supply security target Slovakia Austria Hungary

Slide 10: The Czech Republic
THE CZECH REPUBLIC In heart of Europe Over 90% of its exports are to European countries with 32% to Germany alone Business friendly Stable political and economic environment. Member of the European Union and low corporate income tax rate of 19% World Class Infrastructure Road and rail services avail

Slide 11: High Quality Infrastructure
HIGH QUALITY INFRASTRUCTURE Fast low cost transportation of lithium concentrate to chemical MINE plant CHEMICAL PLANT Adjacent to road and rail lines connecting Cinovec to European ROAD customers RAIL 22 KV transmission lines close by mine and processing site along with established water supply POWE

Slide 12: Positive ESG Profile
POSITIVE ESG PROFILE Recycled Short, localized water/reagents supply chain Electric mining fleet proposed Single roast low- Benign reagents heat

Slide 13: Strategic Partnerships
STRATEGIC PARTNERSHIPS ● Czech national power ● Principal facilitator and ● Leading German owned company organiser of European specialist in plant construction Battery Alliance and engineering for ● Invested EUR 29m at project technology metals. level ● Support offtake, construction finance and ulti

Slide 14: PFS Highlights
PFS HIGHLIGHTS Annual production 25,267 tpa battery grade LiOH.H2O $1.1 7.22 Mt LCE Total JORC resource 4.08 Mt LCE indicated 3.14 Mt LCE inferred Billion NPV Construction Capital costs $482.6 million (8%, after tax) Operating costs $4,876/t LiOH.H2O (without credits) Operating costs $3,435/t LiOH.H

Slide 15: Catalysts to Drive Shareholder Wealth
CATALYSTS TO DRIVE SHAREHOLDER WEALTH Key Accomplishments Appointment of lead engineer Partnership agreement with EU body Strategic partnership with CEZ – project fully funded to FID Completion of PFS demonstrating strong economics and low cost of production Production of battery grade lithium hydro

Slide 16: Construction & Production
CONSTRUCTION & PRODUCTION 2021 2022 2023 2024 2025 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Definitive Feasibility Study Commercial samples sent to potential customers Lithium Hydroxide offtake Agreements Construction Production start

Slide 17: Board & Management Team
BOARD & MANAGEMENT TEAM KEITH COUGHLAN RICHARD PAVLIK KIRAN MORZARIA LINCOLN BLOOMFIELD (AUS) (CZ) (GB) (USA) MANAGING DIRECTOR EXECUTIVE DIRECTOR NON EXECUTIVE DIRECTOR NON EXECUTIVE DIRECTOR CEO & Director of EMH’s largest Former US Ambassador & official specialising 30 years stockbroking & funds

Slide 18: European Metals Holdings
EUROPEAN METALS HOLDINGS ASX : EMH LON : EMH NASDAQ : ERPNF Frankfurt : E861.F Keith Coughlan Executive Chairman +61 419 996 333 keith@europeanmet.com www.europeanmet.com March 2021

Slide 19: Project Summary
PROJECT SUMMARY • Large 1.68mtpa underground mining operation. • Underground crushing and conveyor to surface milling. • Slurry pipeline to beneficiation plant. • Wet magnetic separation of lithium concentrate. • Production of lithium hydroxide or carbonate via gypsum & sodium sulphate roast, water

Slide 20: Underground Mine
UNDERGROUND MINE Historic underground mine for high-grade tin/tungsten veins, closed in 1993. Over 83,000m historic diamond drilling, 21.5km historic drive development. EMH confirmation drilling 9,477m, further drilling commenced in October 2018. The upper portion of a Resource Category Mt Li(%) Li2

Slide 21: Cinovec - Long Section
CINOVEC - LONG SECTION 900 N S 800 700 600 500 Hole From To Width Li2O% Hole From To Width Li2O% CIW-25 9.5 373 361.5 0.43 CN-17 22 224 202 0.62 CIW-26 173.75 410 236.25 0.49 CIW-22 123 387.5 264.5 0.54 CN-86 81.8 230.9 149.1 0.48 CN-81 1 224 223 0.52

Slide 22: Process Flowsheet
PROCESS FLOWSHEET LIMESTONE GYPSUM MICA WATER CONCENTRATE RESIDUE TO TAILINGS ROAST LEACH FILTER SODIUM SULPHATE SODIUM SULPHATE RECYCLE IMPURITY REMOVAL REMOVAL EVAPORATION SODIUM CARBONATE LITHIUM CARBONATE BATTERY GRADE LITHIUM CARBONATE PRECIPITATION POTASSIUM SULPHATE GLASERITE DECOMPOSITION CR
Source: Internet Archive copy of europeanmet.com
More decks from European Metals Holdings Ltd
Investor Presentation (January 2026)32 slides · January 2026
Future Facing Commodities Conference 202318 slides · Apr 6, 2023
Future Facing Commodities Conference 202317 slides · April 2023
ShareCafe Small Cap "Hidden Gems" Webinar 202225 slides · Nov 11, 2022
Investor Presentation (November 2022)25 slides · Nov 8, 2022
Investor Presentation (November 2022)24 slides · Nov 8, 2022