Yancoal Australia Ltd. · ASX:YAL

Yancoal Australia — Corporate Update (May 2019)

19 slides from Yancoal Australia's corporate update, May 10, 2019

  1. Slide 1: Stratford Coal CCC Meeting Presentation – Company Report & Overview of Activities

    Stratford Coal CCC Meeting Presentation – Company Report & Overview of Activities May 2019 Michael Plain Environment & Community Superintendent

  2. Slide 2: Table of Contents

    Table of Contents 1. Agenda Item 7a (Progress at the Mine) 2. Agenda Item 7b (Environmental Reporting) 3. Agenda Item 7c (Environmental Management Plans and Monitoring) 4. Agenda Item 7d (Community Complaints) 5. Agenda Item 7e (Community Programs) 2

  3. Slide 3: 1. Progress at the Mine

    1. Progress at the Mine Mining 1st Quarter 2019  Waste BCM 1,761,000 BCM  Stratford ROM Coal 123,600 tonnes (Includes Codam)  Total CHPP product 57,100 tonnes *Mining in BRN continued during the quarter. Dayshift only. *Mining in Avon North continued during the quarter. Day and evening shift. *Re

  4. Slide 4: 2. Environmental Reporting & Regulators

    2. Environmental Reporting & Regulators Management Area Project Status Reporting • Stratford Mining Complex • The Stratford Mining Complex 2018 Annual Review has been prepared and Annual Review 2018 submitted to DP&E and other relevant agencies. Copies will be made available to the CCC and on the we

  5. Slide 5: 3. Environmental Management Plans & Monitoring

    3. Environmental Management Plans & Monitoring a) Air Quality Management b) Blast Management c) Noise Management d) Water Management e) Rehabilitation Management f) Biodiversity Management 5

  6. Slide 6: 3a. Air Quality Management

    3a. Air Quality Management Management Area Project Status Air quality monitoring • Real-time air quality • The TEOM monitors in Stratford and Craven villages continue to operate. monitoring • SCPL has established alarming and a response protocol for the real-time dust monitoring system. • During the

  7. Slide 7: 3a. Air Quality Management

    3a. Air Quality Management Stratford Dust Deposition - Annual Rolling Average Stratford HVAS Monitoring - Particulate Matter (PM10) 12 Months to April 2019 12 Months to April 2019 5.0 80 Dust (g/m2/month) 70 PM10 (µg/m³) 4.0 60 3.0 50 2.0 40 30 1.0 20 0.0 10 Apr-18 Jul-18 Oct-18 Jan-19 0 D5 Straford

  8. Slide 8: 3b. Blast Management

    3b. Blast Management Management Area Project Status Blasting • Blast Monitoring • Blasting activities continued in both the Avon North and BRN open cuts. • Blast Results • One blast exceeded 115dB(L) and no blasts exceeded 5mm/s during the quarter. For the annual reporting period two blasts have exc

  9. Slide 9: 3b. Blast Management

    3b. Blast Management Clarke (B5) Overpressure Overpressure Monitor Isaac (B1) Ex-Judge (B2) Atkins (B6) (Mine-owned) Fume Location Date Time Site "Cumulative ed 7432 7441 7434 7433 1 1 1 Rating Exceedance Exceedance" Blasts 24hr mm/s dBL mm/s dBL mm/s dBL mm/s dBL % Avon North Friday, 1 February 201

  10. Slide 10: 3c. Noise Management

    3c. Noise Management Management Area Project Status Monitoring • Monthly Noise Survey • Monthly attended noise monitoring was undertaken during Q1 2019. • No non-compliant results were recorded during the surveys. Reports will be made available on the Stratford Coal website. The next monitoring is s

  11. Slide 11: 3d. Water Management

    3d. Water Management Management Area Project Status Site Water • Site Water Balance • The 2018 annual site water balance review has been completed. A summary is included Management in the Annual Review. • Flood Modelling • Avon North eastern clean water drain construction commenced in February 2019.

  12. Slide 12: 3d. Water Management

    3d. Water Management Stratford Monthly Rainfall pH - Avon River & Avondale Creek 9.00 12 Months to April 2019 300 200 8.00 Rainfall (mm) pH 100 7.00 0 6.00 2019 5.00 2018 16-Mar-18 24-Jun-18 2-Oct-18 10-Jan-19 20-Apr-19 2017 Month Average 1908-2007 W1 W2 W3A W4 W5 W6 EC - Avon River & Avondale Creek

  13. Slide 13: 3d. Water Management

    3d. Water Management Stratford Main Pit Water Quality 12 months to April 2019 EC (uS/cm) , Sulphate 5000 10.0 4000 9.0 8.0 (mg/L) 3000 7.0 pH 2000 6.0 1000 5.0 0 4.0 10-Apr-18 30-May-18 19-Jul-18 07-Sep-18 27-Oct-18 16-Dec-18 04-Feb-19 26-Mar-19 15-May-19 EC (uS/cm) Sulphate (mg/L) pH Stratford Main

  14. Slide 14: 3e. Rehabilitation Management

    3e. Rehabilitation Management Management Area Project Status Rehabilitated Waste • Avon North waste • Bulk shaping of the Avon North waste emplacement has continued focusing on Emplacements emplacement areas with offsite visual impact. Planting is proposed in spring 2019 with native vegetation. Reha

  15. Slide 15: 3f. Biodiversity Management

    3f. Biodiversity Management Management Area Project Status Biodiversity • Long-term security • SCPL is required to secure the biodiversity offset lands in perpetuity. Public Positive Management Plan Covenants and Restrictions on the Use of Land were prepared and submitted to DPE in December 2018. •

  16. Slide 16: 3f. Biodiversity Management

    3f. Biodiversity Management Management Area Project Status Biodiversity Offset • Revegetation • In 2019 SCPL is planning for the planting of approximately 60,000 trees over 150 hectares Area Works along the Glen Road area. • Tubestock planting in the biodiversity offset area commenced in April 2019.

  17. Slide 17: 3f. Biodiversity Management

    3f. Biodiversity Management Management Area Project Status Squirrel Glider • Squirrel Glider Colony • Squirrel Glider colony surveys were completed in December 2018. Squirrel Gliders were Management Surveys identified in 5 separate locations. • Squirrel Glider Home • Squirrel Glider home range monit

  18. Slide 18: 4. Community Complaints - Summary

    4. Community Complaints - Summary Stratford Complaint Summary Period: 1/2/2019 - 30/4/2019 Period: 3 Months Total No. of Complaints: 2 Total No. of Complainants: 1 Date/Time of Method of Nature of Complaint Complainant Location Complaint Complaint Investigation/Outcome 8/02/2019 13:00hrs Approx. 2.5

  19. Slide 19: 5. Community Programs

    5. Community Programs Management Area Project Status Support Programs Stratford Coal • SCPL received a very good response from many community organisations in 2019. Community Support • A presentation for the recipients of the 2019 Stratford Coal Community Support Program was Program held at the Buck

Yancoal Australia — Corporate Update (May 2019) on 6ix