Golden Share Resources Corp

Golden Share Resources — PDAC 2012

24 slides from Golden Share Resources's conference presentation, March 2012

  1. Slide 1: March 2012 - PDAC Technical presentation: Shebandowan Gold Project

    Slide 1: March 2012 - PDAC Technical presentation: Shebandowan Gold Project

    March 2012 - PDAC Technical presentation Shebandowan Gold Project This presentation contains forward-looking information on future production and project start-ups. Actual results could differ materially due to change in project schedules, operating performance, demand for gold, commercial negotiati

  2. Slide 2: LSG - GSH transaction – 2011 history

    Slide 2: LSG - GSH transaction – 2011 history

    TSX-V : GSH LSG - GSH transaction – 2011 history • Lake Shore Gold Corp. (LSG) holds a strategic 27.2% interest in Golden Share (GSH) through the ownership of a total of 21.69 million common shares of GSH representing 19.9 % of the outstanding shares, as well as warrants to acquire an additional 10,

  3. Slide 3: LSG - GSH transaction – details

    Slide 3: LSG - GSH transaction – details

    TSX-V : GSH LSG - GSH transaction – details • So long as LSG’s ownership interest is above 9.9%, LSG has the right to participate in GSH’s future financings in proportion to LSG’s pro rata share for a period of five years, so as to maintain the percentage interest in GSH. In the event LSG’s ownershi

  4. Slide 4: Shebandowan Project

    Slide 4: Shebandowan Project

    TSX-V : GSH SHEBANDOWAN PROJECT PISTOL LAKE, CONACHER AND BAND ORE PROPERTIES • 100% GSH option / ownership on 25 kms of strike along Shebandowan belt • 70 km west of Thunder Bay, accessible by road PISTOL LAKE • 5,240 hectares or 52 km² under 100% GSH option • JF West Zone : 150,699 oz Au Inferred

  5. Slide 5: Shebandowan Project – 2011 statistics

    Slide 5: Shebandowan Project – 2011 statistics

    SHEBANDOWAN PROJECT – 2011 statistics May 2011 = logistics for project start-up • Fully functional year-round 20 man camp on Trans-Canada highway • Establishment of integrated data management with ArcGis / Geotic data base systems June 2011 = initiation of surface mapping and prospecting program • 5

  6. Slide 6: Properties – Location

    Slide 6: Properties – Location

    PROPERTIES – Location TSX-V : GSH

  7. Slide 7: Ontario Shebandowan - Atikokan - Rainy River Gold Camps

    Slide 7: Ontario Shebandowan - Atikokan - Rainy River Gold Camps

    ONTARIO TSX-V : GSH SHEBANDOWAN - ATIKOKAN - RAINY RIVER GOLD CAMPS

  8. Slide 8: Shebandowan Belt – GSH Gold Play

    Slide 8: Shebandowan Belt – GSH Gold Play

    SHEBANDOWAN BELT – GSH GOLD PLAY TSX-V : GSH

  9. Slide 9: Historical MNDMF Airborne Mag

    Slide 9: Historical MNDMF Airborne Mag

    HISTORICAL MNDMF AIRBORNE MAG TSX-V : GSH

  10. Slide 10: 2011 Outcrops

    Slide 10: 2011 Outcrops

    2011 OUTCROPS TSX-V : GSH

  11. Slide 11: 2011 Grab Samples

    Slide 11: 2011 Grab Samples

    2011 GRAB SAMPLES TSX-V : GSH

  12. Slide 12: 2011 Surface Structural Measurements

    Slide 12: 2011 Surface Structural Measurements

    2011 SURFACE STRUCTURAL MEASUREMENTS TSX-V : GSH

  13. Slide 13: 2011 Surface Gold Values > 0.3 g/t Au

    Slide 13: 2011 Surface Gold Values > 0.3 g/t Au

    2011 SURFACE GOLD VALUES > 0.3 G/T AU TSX-V : GSH

  14. Slide 14: 2011 Trench Locations

    Slide 14: 2011 Trench Locations

    2011 TRENCH LOCATIONS TSX-V : GSH

  15. Slide 15: 2011 Ground Geophysics

    Slide 15: 2011 Ground Geophysics

    2011 GROUND GEOPHYSICS TSX-V : GSH

  16. Slide 16: 2011 Ground Resistivity

    Slide 16: 2011 Ground Resistivity

    2011 GROUND RESISTIVITY TSX-V : GSH

  17. Slide 17: 2011 Ground Chargeability

    Slide 17: 2011 Ground Chargeability

    2011 GROUND CHARGEABILITY TSX-V : GSH

  18. Slide 18: Historical DDH (ArcGIS / Geotic Compilation)

    Slide 18: Historical DDH (ArcGIS / Geotic Compilation)

    HISTORICAL DDH (ARCGIS / GEOTIC COMPILATION)

  19. Slide 19: 2011 GSH DDH

    Slide 19: 2011 GSH DDH

    (anatysed‘36 elements) : illigg 3075 meters 34 les on-2908 meters 435 QAQC samples)

  20. Slide 20: 2012 "Band Ore Main" Model

    Slide 20: 2012 "Band Ore Main" Model

    2012 “BAND ORE MAIN” MODEL TSX-V : GSH

  21. Slide 21: Shebandowan Gold Project – Mapping

    Slide 21: Shebandowan Gold Project – Mapping

    SHEBANDOWAN GOLD PROJECT – Mapping TSX-V : GSH

  22. Slide 22: Shebandowan Gold Project – Trenching

    Slide 22: Shebandowan Gold Project – Trenching

    SHEBANDOWAN GOLD PROJECT – Trenching TSX-V : GSH

  23. Slide 23: Shebandowan Gold Project – Drilling

    Slide 23: Shebandowan Gold Project – Drilling

    SHEBANDOWAN GOLD PROJECT – Drilling TSX-V : GSH

  24. Slide 24: Contacts

    Slide 24: Contacts

    TSX-V : GSH CONTACTS Philippe Giaro Laurence Huss President and CEO Vice-president Exploration T +32 473 52 30 29 T +1 450 405 8014 phgiaro@skynet.be laurencehuss@hotmail.com Golden Share Mining Corporation 349 Contrecoeur Street Montreal, Quebec Canada H1L 3Y4 Tel. : (514) 866-4224 Fax. : (514) 866

Source: Internet Archive copy of goldenshare.ca