  1. Slide 1: Annual General Meeting

    Slide 1 For personal use only Kingsrose Mining Limited Annual General Meeting Perth 26th November 2009

  2. Slide 2: Kingsrose Mining Limited: Objective and Projects

    Slide 2 Kingsrose Mining Limited For personal use only OBJECTIVE “Aggressively develop into a significant gold producer based on our proven in-house expertise in underground mining and exploration.” FOCUSSED APPROACH “Acquisition and development of production and near production projects evaluated a

  3. Slide 3: Board and Executive Management

    Slide 3 Board and Executive Management For personal use only Mr John Morris Executive Chairman Mr Timothy Spencer Chief Financial Officer Mr Bill Phillips Non-Executive Director Dr Mike Andrews Non-Executive Director Mrs Jeannette Smith Joint Company Secretary Miss Tanya Ashley Joint Company Secreta

  4. Slide 4: Corporate Summary

    Slide 4 Corporate Summary For personal use only Ordinary Shares on Issue 219.3m (listed) (includes 64.8m escrowed) Options 38.5m (listed) 15.7m (unlisted) Convertible Notes 11,000,000 Market Capitalisation (undiluted) A$142m (@ A$0.65/share) Major Shareholders Icon Enterprises Ltd (19.4%) KRM (WA) P

  5. Slide 5: South Sumatra, Indonesia

    Slide 5 Way Linggo Project - South Sumatra, Indonesia For personal use only

  6. Slide 6: Overview

    Slide 6 Way Linggo Project - Overview For personal use only • Construction of 140,000 tonnes per annum underground gold mine and processing facility • Mineral rights held under 4th Generation Contract of Work • Feasibility study completed and Government approvals for construction obtained • Commissi

  7. Slide 7: Project Snapshot

    Slide 7 Way Linggo Project - Project Snapshot For personal use only JORC Total Resource 669,000t @ 8.44g/t Au, 129g/t Ag 10.6g/t gold equiv., 227,600 Au Eq oz Mining Commenced on 2 levels 1020mRL, 1065mRL Strongly Positive Reconciliations Approx 7000t @ 18g/t+ Au, 150g/t Ag stockpiled Expect 15,000t

  8. Slide 8: Holding Structure

    Way Linggo Project - Holding Structure For personal use only Kingsrose Mining Limited • PT Natarang Mining (“PT NM”) (Australian) – Indonesian PMA (foreign ownership approved) company 100% – 4th generation Contract of Work MM Gold Pty Ltd (Australian) • Natarang Offshore Pty Ltd 100% (“NOPL”) – Aust

  9. Slide 9: Site Layout

    Slide 9 Way Linggo Project - Site Layout For personal use only

  10. Slide 10: Mine Location

    Slide 10 Way Linggo Project - Mine Location For personal use only

  11. Slide 11: North Vein Ore Bodies

    Slide 11 Way Linggo Project - North Vein Ore Bodies For personal use only 3D Image of Way Linggo Area showing subsurface extent of North Vein, topography and drillhole traces

  12. Slide 12: Way Linggo Project – Minesite Geology

    Slide 12 Way Linggo Project – Minesite Geology For personal use only Site Geology • Mineralisation as high grade epithermal quartz veins • Low sulphidation • Host rocks dacite intrusion and andesite volcanics • North Vein – Near vertical, average width 4.7 metres – Resource 554,000 tonnes @ 9.17 g/t

  13. Slide 13: Way Linggo - Snowden's Resource Estimate

    Way Linggo - Snowden’s Resource Estimate For personal use only Deposit Classification Tonnes Au g/t Ag g/t AuEq g/t AuEq oz Measured 334,000 11.40 172 14.27 153,000 North Vein Indicated 93,000 7.06 118 9.03 27,000 Inferred 127,000 4.92 83 6.30 25,700 Sub-total 554,000 9.17 143 11.55 205,700 Hangingw

  14. Slide 14: Way Linggo North Vein - Long Section

    Slide 14 Way Linggo North Vein - Long Section (View To The West) For personal use only

  15. Slide 15: North Vein Ore Bodies

    Way Linggo Project - North Vein Ore Bodies For personal use only A Ore Body B Ore Body Quartz - Adularia – Clay Assemblage Quartz – Chlorite – Clay Assemblage 1020 Level Face sampling (uncut) 1020 Level Face sampling (uncut) 112 m @ 20.4 g Au/t, 304 g Ag/t 90 m @ 33.5 g Au/t, 414 g Ag/t Average widt

  16. Slide 16: 1020 Level Plan

    Slide 16 Way Linggo Project - 1020 Level Plan For personal use only Way Linggo Mine Development Projection of :- • 1020 m Level • North Vein on 1020 m Level • Incline • Main Haulage Drive • Alimak Raising • Sill Drift Development • Underground Shaft to 965 Level

  17. Slide 17: Mining

    Way Linggo Project - Mining For personal use only ROM Pad 1020 Level Main Haulage Portal Mine Service Area

  18. Slide 18: Mining

    Way Linggo Project - Mining For personal use only Experienced Indonesian miners Bogging high grade ore on staff. 3 shifts per day

  19. Slide 19: Mining

    Way Linggo Project - Mining For personal use only Alimak Raising High Grade Stockpile Currently approximately 7,000 t @ 18 g Au/t, 150 g Ag/t

  20. Slide 20: Process Plant

    Slide 20 Way Linggo Project - Process Plant For personal use only 400 tonnes per day design capacity Merrill – Crowe Process Cyanide leach and zinc precipitation of Au and Ag Suitable high grade and particularly high Ag ores Commissioning end- March 2010 All major components onsite

  21. Slide 21: Process Plant Flow Sheet

    Slide 21 Way Linggo Project - Process Plant Flow Sheet For personal use only

  22. Slide 22: Process Plant Design

    Slide 22 Way Linggo Project - Process Plant Design For personal use only

  23. Slide 23: Tailings Dam Construction

    Slide 23 Way Linggo Project - Tailings Dam Construction For personal use only TAILINGS STORAGE FACILITY Engineered Earth Dam under construction Government Permitted Design Project Environmental Impact Statement, Env. Monitoring Plan and Env. Management Plan approved

  24. Slide 24: Projected Performance

    Slide 24 Way Linggo Project - Projected Performance For personal use only Ore Stockpile by March 2010 15,000 tonnes @ 15g/t Au Mill Throughput 140,000 tonnes p.a. Budgeted grade for first 18 months 12 g Au/t Plant Commissioning Starts end-March 2010 Mill recovery rate 90% Mill availability rate 92%

  25. Slide 25: Key Financial Estimates

    Slide 25 Way Linggo Project - Key Financial Estimates For personal use only CARRYING VALUE up to June 30, 2009) USD 13m PLANNED EXPENDITURE July 2009 to March 2010 ¾ Plant & Equipment USD 7m ¾ Mine Development USD 4m TOTAL SUNK COST TO PRODUCTION USD 24m PRODUCTION COSTS (revised 24Nov09) ¾ Direct m

  26. Slide 26: Way Linggo Project – Trans Sumatra Fault Zone

    Way Linggo Project – Trans Sumatra Fault Zone For personal use only Highly prospective geological setting Structural setting related to Trans Sumatra Fault Zone (TSFZ) Major dextral strike slip regime –Dilational jogs –Pull apart basins Significant mines and projects related to TSFZ ‐ Martabe 5.9Moz

  27. Slide 27: Way Linggo - Prospective Structural Setting

    Way Linggo - Prospective Structural Setting For personal use only

  28. Slide 28: Way Linggo Project Exploration Potential

    Way Linggo Project For personal use only Exploration Potential Prospect Locations • Way Linggo • Semung Kecil • Minesite Exploration • Brown Fields Exploration • Regional Potential

  29. Slide 29: Way Linggo Project – Ore Body Extensions

    Way Linggo Project – Ore Body Extensions For personal use only North Vein Orebodies Plunge to North approximately 40 degrees Ore shoots structurally controlled, Open at depth and down plunge

  30. Slide 30: Way Linggo Project – Mine Site Exploration Targets

    Way Linggo Project – Mine Site Exploration Targets For personal use only Based on Structural Geological assessment by Dr Steve Garwin Numerous near mine exploration targets

  31. Slide 31: Way Linggo Project – Brown Field Exploration Targets

    Way Linggo Project – Brown Field Exploration Targets For personal use only Way Linggo Minesite and Semung Kecil Prospect Geology

  32. Slide 32: Brown Field Exploration Targets

    Way Linggo Project - Brown Field Exploration Targets For personal use only Way Linggo and Semung Kecil part of major structurally controlled hydrothermal cell

  33. Slide 33: Way Linggo Project – Exploration Targets

    Way Linggo Project – Exploration Targets For personal use only Zone of subdued magentic relief indicates extent of major hydrothermal cell extending to north of known prospects

  34. Slide 34: Exploration Drilling

    Way Linggo Project - Exploration Drilling For personal use only Diamond drilling from surface Underground diamond drilling 2 rigs on site ¾ Ore body delineation ¾ Parallel Veins

  35. Slide 35: Regional Exploration: Airborne Geophysics

    Slide 35 Way Linggo Project For personal use only REGIONAL EXPLORATION Airborne Geophysics Helicopter Magnetics and Radiometrics

  36. Slide 36: Regional Exploration: Airborne Geophysics

    Slide 36 Way Linggo Project For personal use only REGIONAL EXPLORATION Airbourne Geophysics Sophisticated processing by Fathom Geophysics

  37. Slide 37: Regional Exploration: Airborne Geophysics

    Slide 37 Way Linggo Project For personal use only REGIONAL EXPLORATION Airborne Geophysics Helicopter Magnetics and Radiometrics Interpretation being integrated with Structural Geology by Dr Steve Garwin

  38. Slide 38: Regional Exploration: Airborne Geophysics

    Slide 38 Way Linggo Project For personal use only REGIONAL EXPLORATION Airborne Geophysics Helicopter Magnetics and Radiometrics Satellite imagery Prominent NW, N and NE Linears 22 Target areas for follow up ¾ Lineament intersection zones ¾ Dacite Intrusions ¾ Broad magnetic subdued areas hydrotherm

  39. Slide 39: Regional Exploration: Drainage Geochemistry

    Slide 39 Way Linggo Project For personal use only REGIONAL EXPLORATION Drainage Geochemistry Gold BLEG Anomalies Bulk Leach Extractable Gold

  40. Slide 40: Regional Exploration: Drainage Geochemistry

    Slide 40 Way Linggo Project For personal use only REGIONAL EXPLORATION Drainage Geochemistry Gold Stream Sediment Anomalies - 80# Size Fraction

  41. Slide 41: Way Linggo Project – Exploration Potential

    Slide 41 Way Linggo Project – Exploration Potential For personal use only Highly Prospective Terrane ¾ Pacific Rim of Fire ¾ Sunda-Banda Volcanic Arc ¾ Trans Sumatra Fault Zone dextral strike slip regime Epithermal Gold Mineralisation ¾ High grade gold and silver ¾ Multi million ounce deposits mined

  42. Slide 42: Epithermal Gold - Gosowong Mineralisation

    Slide 42 Epithermal Gold - Gosowong Mineralisation For personal use only (From Dan Wood and Gosowong Discovery Team presentation, Newcrest Mining) Similar mineral assemblages to Way Linggo A and B ore bodies ¾ A Orebody Quartz-Adularia-Clay ¾ B Orebody Quartz-Calcite-Chlorite

  43. Slide 43: Epithermal Gold - Gosowong Long Section

    Slide 43 Epithermal Gold - Gosowong Long Section For personal use only (After Newcrest Mining) Gosowong and Kencana Ore Bodies showing regional plunge

  44. Slide 44: Way Linggo - Structural Setting

    Way Linggo - Structural Setting For personal use only Pull Apart Basins and Dilational Jogs within Trans Sumatra Fault Zone

  45. Slide 45: Way Linggo Comparison Setting - Pull apart Basin Margin

    Way Linggo Comparison Setting - Pull apart Basin Margin For personal use only Frutta Del Norte, Equador Resource 58,900,000 t @ 7.2 g Au/t (13.6 M oz Au Eq) (After Aurelian Resources)

  46. Slide 46: Epithermal Gold – Hishikari Long Section

    Epithermal Gold – Hishikari Long Section For personal use only (After Faure et al 2002) Note scale and distribution of high grade ore shoots

  47. Slide 47: Epithermal Gold – Vera Nancy Long Section

    Slide 47 Epithermal Gold – Vera Nancy Long Section For personal use only Original Pajingo - 370,000 oz Au @ 8 – 9 g Au/t Vera Nancy - 2,900,000 oz Au @ 13.5 g Au/t Current extent of drilled resource at Way Linggo overlaid

  48. Slide 48: Way Linggo Project – Exploration Potential

    Slide 48 Way Linggo Project – Exploration Potential For personal use only Highly Prospective Terrain ¾ Pacific Rim of Fire ¾ Sunda-Banda Volcanic Arc ¾ Trans Sumatra Fault Zone dextral strike slip regime Epithermal Gold Mineralisation ¾ High grade gold and silver ¾ Multi million ounce deposits mined

  49. Slide 49: General Disclaimer

    Slide 49 For personal use only General Disclaimer This presentation has been prepared by Kingsrose Mining Limited (“Kingsrose” or the “Company”). It should not be considered as an offer or invitation or inducement to subscribe for or the purchase of any securities in the Company. This presentation c