Bhp Group Ltd · ASX:BHP

Bhp — BHP Billiton — Corporate Update (November 2008)

21 slides from Bhp's corporate update, Nov 3, 2008

  1. Slide 1: Australian Site Tour - Ravensthorpe Nickel Operation

    Australian Site Tour Ravensthorpe Nickel Operation Isak Buitendag General Manager 29 October 2008

  2. Slide 2: Important notices

    Important notices Reliance on third party information The views expressed here contain information that have been derived from publicly available sources that have not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the informatio

  3. Slide 3: Agenda

    Agenda Key Messages Sustainability Business Overview Successes and Overcoming Challenges Operational Performance

  4. Slide 4: Key messages

    Key messages • First major nickel laterite project in production in a decade • Now ramping up to reach full nameplate capacity • The process plant technology works • Enhanced HPAL technology will help BHP Billiton to take advantage of laterite growth opportunities

  5. Slide 5: Agenda

    Agenda Key Messages Sustainability Business Overview Successes and Overcoming Challenges Operational Performance

  6. Slide 6: Safety performance

    Safety performance Actions and priorities • Increasing compliance with BHP Billiton Fatal Risk Control Protocols • Leading by example in the field • Simple, integrated systems • Improving the working environment • Creating positive attitudes • Ensuring that team members (both employees and contracto

  7. Slide 7: Workforce

    Workforce • A hybrid residential and fly-in fly-out strategy – Residential - Hopetoun and Ravensthorpe – Bus-in, bus-out, Esperance – Fly-in, fly-out, Perth • A diverse group of 650 employees – 6% indigenous – 16% female – 7% international • Operation a part of the local community – Community invest

  8. Slide 8: Agenda

    Agenda Key Messages Sustainability Business Overview Successes and Overcoming Challenges Operational Performance .

  9. Slide 9: Overview statistics

    Overview statistics Location: Ravensthorpe, Western Australia BHP Billiton 100% Ownership: Reserves: 235 mt at 0.67% Ni¹ Resources: 386 mt at 0.62% Ni¹ Production 50,000 tpa contained nickel Capacity: 1,400 tpa cobalt Expected mine life 21 years Overview: • Open cut mine and hyrdrometallurgical proc

  10. Slide 10: Mining overview

    Mining overview • Open cut operation • Three ore bodies • Two ore types – Limonite, Saprolite • BHP Billiton employee operated • Two Liebherr 994 excavators • Ten Caterpillar 785 trucks • Five Atlas Copco L8 drill rigs • Ancillary mining fleet

  11. Slide 11: Processing overview – ore handling and beneficiation

    Processing overview – ore handling and beneficiation

  12. Slide 12: Processing overview - leach

    Processing overview - leach ll bhpbilliton

  13. Slide 13: Processing overview – hydro-metallurgy

    Processing overview – hydro-metallurgy

  14. Slide 14: Processing overview - utilities

    Processing overview - utilities

  15. Slide 15: Ramp-up production

    Ramp-up production Nickel in MHP (kt) 9 8 7 6 5 4 3 2 1 H1 FY08 H2 FY08 Q1 FY09 times 2

  16. Slide 16: Indicative operating cost structure at full capacity

    Indicative operating cost structure at full capacity Cash operating cost (%) Royalties Travel 3% 3% • AUD spend is approx 85% Diesel 7% Consumables / Other Reagents 13% 32% Maintenance 18% Labour 24%

  17. Slide 17: Agenda

    Agenda Key Messages Sustainability Business Overview Successes and Overcoming Challenges Operational Performance

  18. Slide 18: Key milestones

    Key milestones • Operations workforce successfully recruited and prepared • Mining operations performing well • First production H1 FY2008 • First 5000t of MHP H1 FY2008 • Ramp up toward nameplate capacity • Process plant technology proved and performing to expectation. Slide

  19. Slide 19: Ramp-up – key issues summary

    Ramp-up – key issues summary Issue Remedy Materials handling Support and equipment deployed Component redesign underway Beneficiation dewatering Work around successfully installed Successful pilot Long term dewatering solution in design Tank failures Technology sound Repairs successful Build-up of s

  20. Slide 20: Key messages

    Key messages • First major nickel laterite project in production in a decade • Now ramping up to reach full nameplate capacity • The process plant technology works • Enhanced HPAL technology will help BHP Billiton to take advantage of laterite growth opportunities

  21. Slide 21: bhpbilliton - resourcing the future

    bhpbilliton resourcing the future SIGNATURES Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized. BHP Billiton Limited and BHP Billiton Plc Date: 3 November 2008 By: J