Tower Resources Ltd. · TSXV:TWR

Tower Resources — Investor Presentation (January 2022)

17 slides from Tower Resources's investor presentation, January 2022

  1. Slide 1: Gold & Copper Exploration in British Columbia

    Tower Resources Ltd – TSX-V: TWR 1 TSX-V: TWR GOLD & COPPER EXPLORATION IN BRITISH COLUMBIA Tower Resources Ltd. Corporate Presentation January 2022

  2. Slide 2: Disclaimer

    Tower Resources Ltd – TSX-V: TWR 2 DISCLAIMER This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in any locality, state, country or other jurisdiction where such distribution, publication, availability or use

  3. Slide 3: Investment Highlights

    Tower Resources Ltd – TSX-V: TWR 3 INVESTMENT HIGHLIGHTS Low cost Au and Cu exploration near major WHY Canadian mining projects including; Blackwater, New Afton, Highland Valley GOLD & COPPER Copper, Brucejack, Red Chris FOCUS? Nechako: Large Au-Ag-Zn-Pb dispersal GOLD train identified in till and t

  4. Slide 4: Management, Board & Advisors

    Tower Resources Ltd – TSX-V: TWR 4 MANAGEMENT, BOARD & ADVISORS MANAGEMENT BOARD ADVISORS R. JOE DHAMI GERALD SHIELDS President, CEO & Director LLB | Chairman, Director - 20 years experience in capital markets - Founding Member, Director & General providing end to end corporate Counsel of Rainy Rive

  5. Slide 5: Share Structure

    Tower Resources Ltd – TSX-V: TWR 5 SHARE STRUCTURE Recent Financing Fully Diluted 171,822,523 13,986,014 Units at $0.143 for gross proceeds of $2,000,000 completed March 24, 2021, 13,986,014 Common Shares 129,867,081 warrants remain exercisable at $0.22 until March 24, 2022. Warrants 34,205,442 Stoc

  6. Slide 6: Project Portfolio

    Tower Resources Ltd – TSX-V: TWR 6 PROJECT PORTFOLIO PORTFOLIO OF AU & CU PROJECTS IN BRITISH COLUMBIA – A SAFE AND Red Chris STABLE MINING JURISDICTION: GJ Galore Creek MORE CREEK Au epithermal project and Au-Cu Brucejack KSM porphyry projects – north of Stewart, BC in Kemess Golden Triangle BELLE

  7. Slide 7: Nechako Gold Project

    Tower Resources Ltd – TSX-V: TWR 7 NECHAKO GOLD PROJECT

  8. Slide 8: Nechako Gold Project

    Tower Resources Ltd – TSX-V: TWR 8 NECHAKO GOLD PROJECT Vanderhoof Pop: 4,439 Twelve mineral claims totalling 5,940 hectares located 80 km south of Vanderhoof. excellent road access. Stub Historically explored for Cu-Au porphyry mineralization. Strong new evidence of stratiform Eskay Creek type Au-A

  9. Slide 9: Nechako Gold Project

    Tower Resources Ltd – TSX-V: TWR 9 NECHAKO GOLD PROJECT PAST – Ice sheet scrapes over deposit PRESENT – Resulting overburden contains sulphide grains in a dispersal train. RC sampling used to collect samples. Ice Surface Overburden Surface Sulphide dispersal train Deposit Deposit Bedrock Bedrock Hea

  10. Slide 10: Nechako Gold Project

    Tower Resources Ltd – TSX-V: TWR 10 NECHAKO GOLD PROJECT HEAVY METAL CONCENTRATE (HMC) EXAMPLES OF GRADES OF GOLD, SILVER, COPPER, LEAD AND ZINC FOUND IN THE OVERLYING TILLS. Sample Number Weight of Au g/t Ag g/t Cu (%) Pb (%) Zn (%() NRC-17-25 25-01 76 0.29 1.90 0.15 0.03 0.09 25-02 25 0.47 0.80 0.

  11. Slide 11: Nechako Gold Project

    Tower Resources Ltd – TSX-V: TWR 11 NECHAKO GOLD PROJECT

  12. Slide 12: Nechako Gold Project

    Tower Resources Ltd – TSX-V: TWR 12 NECHAKO GOLD PROJECT

  13. Slide 13: Nechako Gold Project

    Tower Resources Ltd – TSX-V: TWR 13 NECHAKO GOLD PROJECT

  14. Slide 14: Rabbit North Copper Gold Project

    Tower Resources Ltd – TSX-V: TWR 14 RABBIT NORTH COPPER GOLD PROJECT Kamloops Pop: 100,000 km 14 Highland Valley Copper Mine - Teck Resources Rabbit North New Afton Mine Annual Production: 100Kt Cu – New Gold Inc. 2P Reserves: 589Mt @ 0.30% Cu Annual Production: 100Koz Au & 85Mlbs Cu 2P Reserves: 60

  15. Slide 15: Rabbit North Copper Gold Project

    Tower Resources Ltd – TSX-V: TWR 15 RABBIT NORTH COPPER GOLD PROJECT • Documented 16,400 ha porphyry related alteration and mineralization covering an area of approximately 4 by 4 kilometers with 9 known Cu-Au occurrences open for further testing plus large untested area under overburden cover to no

  16. Slide 16: Rabbit North Highlighted Drill Results

    Tower Resources Ltd – TSX-V: TWR 16 RABBIT NORTH HIGHLIGHTED DRILL RESULTS Drill Hole From (m) To (m) Interval (m)* Cu (%) Au (g/t) CuEq (%)** RN-008 46 246 220 0.30 0.15 0.39 RN-003 54 156 102 0.08 0.28 0.26 RN-010 94 134 40 0.33 0.15 0.42 RN17-014 27 247 220 0.15 0.09 0.21 RN17-015 208 455 247 0.5

  17. Slide 17: For More Information Please Contact

    Tower Resources Ltd – TSX-V: TWR 17 TSXV: TWR FOR MORE INFORMATION PLEASE CONTACT: Tower Resources Ltd. lhodges@towerresources.ca 604-377-0403 towerresources.ca

Tower Resources — Investor Presentation (January 2022) on 6ix